Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | +2.00% | ₹4.3 L | H1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | H2₹4.2 L−₹13,356.04 (3.09%)Admitted-Fee/PreQual/Technical/Finance | -1.15% | ₹4.2 L−₹13,356.04 (3.09%) | H2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.2 L
EMD Value
₹8,480
Closing Date
8 Aug 2026, 2:00 pmClosed
Executive Engineer Irrigaiton Division Kulgam
Irrigation Division Kulgam
Construction of crate protection bund on RS embankment of Kader Shiganpora ladh near RD 450 meters
2026_IFC_318999_1
eNit 09 of 2026-27
Open Tender
Civil Works
Percentage
15 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Chief Engineer IFC Kashmir
₹8,480
18 Aug 2026
1 Aug 2026
8 Aug 2026
1 Aug 2026
8 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | |||||
| 2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | |||||
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 0.6 | cum | 1 | ₹0.6 |
| 4 | Supply of stones Nallah( stack Measurement reduced by 15%) including CP + GST 18% | 1 | cum | - | - |
| 5 | Dumping stone excluding cost of stones.in Horizontal on level | 1 | cum | - | - |
| 6Supply of 4mm GI wire crates 4" X 4" Mesh 16 x16 sft size as per IS specification including all carriage | |||||
| 7 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: Excluding Rolling and Watering. | 1 | cum | 1 | ₹1 |
| 8Supply of binding wire for crates | |||||
| 9Carriage of material by Mechanical transport and Headload from source to actual site of work including loading,unloading ,stacking complete job. | |||||
| 9.1 | Stones for an average lead of 17 km by MT and 100 mts by HL | 1 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1054340.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .