Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Finance | ₹8.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 LAdmitted-Finance | ₹8.8 L | L2 | Admitted-Finance |
| 3 | L3₹9.2 LAdmitted-Finance 0 | ₹9.2 L | L3 | Admitted-Finance |
| 4 | L4₹10.1 LAdmitted-Finance | ₹10.1 L | L4 | Admitted-Finance |
| 5 | L5₹11.8 LAdmitted-Finance | ₹11.8 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAKESH KUMAR SHARMA L2 | M/s Maha Veer Construction Co. L5 | M/s Anand Prakash Gupta L6 | SUNIL KUMAR MITTAL L1 | Mahesh Chand Gupta L7 | RAJ CONSTRUCTION L3 | manish kumar tanwar L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.10 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
2.14.3 Holes 60 cm dia, and 60 cm deep | 80 | Each | 35 ₹2,800 | 30 ₹2,400 | 47 ₹3,760 | 47 ₹3,760 | 35 ₹2,800 | 20 ₹1,600 | 40 ₹3,200 |
| 1.20 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
2.14.4Holes 45 cm dia, and 45 cm deep. | 4,000 | Each | 15 ₹60,000 | 10 ₹40,000 | 20.5 ₹82,000 | 20.5 ₹82,000 | 20 ₹80,000 | 10 ₹40,000 | 20 ₹80,000 |
| 1.30 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
2.14Holes 20 cm dia, and 20 cm deep. | 8,000 | Each | 5 ₹40,000 | 5 ₹40,000 | 15 ₹1.2 L | 8 ₹64,000 | 10 ₹80,000 | 5 ₹40,000 | 15 ₹1.2 L |
| 2.00 | Supply of Neem oil cake in 40 kg packing bag at site. | 152 | Bag | 900 ₹1.4 L | 500 ₹76,000 | 1,080 ₹1.6 L | 600 ₹91,200 | 1,080 ₹1.6 L | 1,400 ₹2.1 L | 1,000 ₹1.5 L |
| 3.00 | Hiring of J.C.B/Hydraulic excavator (3-D) with driver, fuel and helper etc. for cleaning of wild growth, removal of building rubbish, debris industrial waste and refuse etc. as per direction of Engineer-in-charge. | 3 | Day | 700 ₹2,100 | 6,500 ₹19,500 | 7,850 ₹23,550 | 7,000 ₹21,000 | 7,850 ₹23,550 | 7,500 ₹22,500 | 6,500 ₹19,500 |
| 4.10 | Providing and stacking of Tier-I, Tree plants (Upper Layer canopy Trees)
Providing and stacking of Cassia fistula (Amaltash) height 120-135 cm. in poly bag size 25 cm as per direction of Officer In-charge. | 20 | Each | 60 ₹1,200 | 150 ₹3,000 | 70 ₹1,400 | 70 ₹1,400 | 80 ₹1,600 | 60 ₹1,200 | 65 ₹1,300 |
| 4.20 | Providing and stacking of Bombax ceiba height 150-165 cm. in poly bag size 25 cm as per direction of Officer In-charge. | 20 | Each | 50 ₹1,000 | 150 ₹3,000 | 75 ₹1,500 | 75 ₹1,500 | 100 ₹2,000 | 60 ₹1,200 | 65 ₹1,300 |
| 4.30 | Providing and stacking of Bauhinia blakeana (Kachnar) height 120-150 cm. in poly bag size 25 cm as per direction of Officer In-charge. | 20 | Each | 60 ₹1,200 | 150 ₹3,000 | 86 ₹1,720 | 85 ₹1,700 | 80 ₹1,600 | 60 ₹1,200 | 65 ₹1,300 |
| 4.40 | Providing and stacking of Butea frondosa (Flame of Forest) height 60- 75 cm. in poly bag size 25 cm as per direction of the officer-in-charge | 20 | Each | 50 ₹1,000 | 150 ₹3,000 | 60 ₹1,200 | 60 ₹1,200 | 60 ₹1,200 | 50 ₹1,000 | 50 ₹1,000 |
| 5.10 | Providing and stacking of Tier-II, Tree plants (Middle Layer canopy shrubs)
Providing and stacking of Tecoma gaudichaudi of height 60-75 cm. with 5-6 branches in p.bag of size 25 cm as per direction of Officer In-charge. | 1,000 | Each | 45 ₹45,000 | 50 ₹50,000 | 54 ₹54,000 | 20 ₹20,000 | 50 ₹50,000 | 30 ₹30,000 | 35 ₹35,000 |
Tender Value
₹11.8 L
EMD Value
₹23,588
Closing Date
4 May 2026, 3:00 pmClosed
DEPUTY DIRECTOR
OFFICE OF THE DY. DIRECTOR, HORT. DIVISION-III, B2B, JANAKPURI, NEW DELHI
Supply and Stacking of plants, neem oil cake, digging of holes etc at site for Multi-tire plantation under Aranya Policy 2026.
2026_DDA_906506_1
02/Dy. Director/Hort.-III/DDA/2026-27
Open Tender
Civil Works
90 days
Distt Park and lake G-17 Paschim Vihar
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹23,588
16 May 2026
25 Apr 2026
5 May 2026
25 Apr 2026
4 May 2026
25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0.0 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
2.14.3 Holes 60 cm dia, and 60 cm deep | 80 | Each | 1.25 | ₹100 | item1 |
| 0.9 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
2.14.4Holes 45 cm dia, and 45 cm deep. | 4,000 | Each | 10 | ₹40,000 | item2 |
| 0.0 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
2.14Holes 20 cm dia, and 20 cm deep. | 8,000 | Each | 10 | ₹80,000 | item3 |
| 2 | Supply of Neem oil cake in 40 kg packing bag at site. | 152 | Bag | 10 | ₹1,520 | item4 |
| 3 | Hiring of J.C.B/Hydraulic excavator (3-D) with driver, fuel and helper etc. for cleaning of wild growth, removal of building rubbish, debris industrial waste and refuse etc. as per direction of Engineer-in-charge. | 3 | Day | 53 | ₹159 | item5 |
| 0.9 | Providing and stacking of Tier-I, Tree plants (Upper Layer canopy Trees)
Providing and stacking of Cassia fistula (Amaltash) height 120-135 cm. in poly bag size 25 cm as per direction of Officer In-charge. | 20 | Each | - | - | item6 |
| 0.0 | Providing and stacking of Bombax ceiba height 150-165 cm. in poly bag size 25 cm as per direction of Officer In-charge. | 20 | Each | 100 | ₹2,000 | item7 |
| 0.9 | Providing and stacking of Bauhinia blakeana (Kachnar) height 120-150 cm. in poly bag size 25 cm as per direction of Officer In-charge. | 20 | Each | 53 | ₹1,060 | item8 |
| 0.0 | Providing and stacking of Butea frondosa (Flame of Forest) height 60- 75 cm. in poly bag size 25 cm as per direction of the officer-in-charge | 20 | Each | 10 | ₹200 | item9 |
| 0.9 | Providing and stacking of Tier-II, Tree plants (Middle Layer canopy shrubs)
Providing and stacking of Tecoma gaudichaudi of height 60-75 cm. with 5-6 branches in p.bag of size 25 cm as per direction of Officer In-charge. | 1,000 | Each | 11 | ₹11,000 | item10 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
pressnotice.pdf
Additional Documents • 1.70 MB
BOQ_952823.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid