Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹5.0 Cr
EMD Value
₹10.1 L
Closing Date
5 Dec 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
Widening and Strengthening work Ramnagar Arsiya Belwai road (ODR) Ch. 9.000 to 12.600 (3.600 Km) in Distt Jaunpur
2025_CEUVZ_1081521_1
4851/SE Tender/jnp-gzp circle/25 Date-25-09-2025
Open Tender
Civil Works
Item Rate
365 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹10.1 L
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
10 Oct 2025
10 Oct 2025
5 Dec 2025
10 Oct 2025
5 Dec 2025
10 Oct 2025
10 Oct 2025
Scarifying the existing bituminous surface to a depth of 20 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (including all material, T&P, labour cess etc but excluding GST)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. (including all material, T&P, labour cess etc but excluding GST)
Construction of Embankment with Material Deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (including all material, T&P, labour cess etc but excluding GST)
Construction of Embankment with Material obtained from Right of way:- Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (including all material, T&P, labour cess etc but excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (including all material, T&P, labour cess etc but excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including all material, T&P, labour cess etc but excluding GST)
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (including all material, T&P, labour cess etc but excluding GST)
Providing and laying dense graded bituminous macadam Grade-2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (including all material, T&P, labour cess etc but excluding GST)
Providing and applying Tack coat-2 with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (including all material, T&P, labour cess etc but excluding GST)
Providing and laying bituminous concrete Gade-2 with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (including all material, T&P, labour cess etc but excluding GST)
Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-35 over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (including all material, T&P, labour cess etc but excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. (including all material, T&P, labour cess etc but excluding GST)
Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days foundation. (including all material, T&P, labour cess etc but excluding GST)
RCC Grade M20 in U- type drain & cover. (including all material, T&P, labour cess etc but excluding GST)
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications.(including all material, T&P, labour cess etc but excluding GST)
Concrete with 4cm gauge brick ballast, sand of 1.25 F.M.and cement in proportion of 8:4:1 in foundation including supply of all materials, labour T&P etc. required for proper completion for the work. (including all material, T&P, labour cess etc but excluding GST)
M-150 Brick work in 1:4 cement and course sand mortar in foundation and parapet of hume pipe including supply of all material, labour T&P etc. required for proper completion for the work. (including all material, T&P, labour cess etc but excluding GST)
Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 F.M including supply of all material, labour T&P etc. required for proper completion for the work. (including all material, T&P, labour cess etc but excluding GST)
Providing and laying of 450 mm dia R C C Hume pipe NP-3 (including all material, T&P, labour cess etc but excluding GST)
Providing and laying of 600 mm dia R C C Hume pipe NP-3 (including all material, T&P, labour cess etc but excluding GST)
Providing and laying of 900 mm dia R C C Hume pipe NP-3 (including all material, T&P, labour cess etc but excluding GST)
PART-B Maintenance cost will be paid year wise as per Government order No 17/2024/SA-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No.3689 COPRMC/Mul-23-24 Date 17-02-2024 Maintenance cost will adjusted as per final cost of construction and will be paid accordingly.
1st year- Maintenance cost 0% on the Work. (including all material, T&P, labour cess etc but excluding GST)
2nd year- Maintenance cost 0.25% on the Work. (including all material, T&P, labour cess etc but excluding GST)
3rd year- Maintenance cost 0.50% on the Work. (including all material, T&P, labour cess etc but excluding GST)
4th year- Maintenance cost 0.75% on the Work. (including all material, T&P, labour cess etc but excluding GST)
5th year- Maintenance cost 1.00% on the Work. (including all material, T&P, labour cess etc but excluding GST)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
SBD2.pdf
Tender Documents • 0.15 MB
Adendum.pdf
Additional Documents • 9.57 MB
BOQ_1979879.xls
BOQ • 0.25 MB
SBD1.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .