| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-AOC 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹32.1 L+₹6.0 L (22.8%)Rejected-Finance DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹41.6 L+₹15.4 L (58.8%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹51.2 L+₹25.0 L (95.6%)Rejected-Finance NIL | L4 | Rejected-Finance 4th Lowest |
Tender Value
Refer Docs
EMD Value
₹62,000
Closing Date
25 Feb 2021, 4:00 pmClosed
Executive Engineer Division No-IHPPWD Shimla-3
Executive Engineer Division No-IHPPWD Shimla-3
Construction of Link road from Old Junga to Kohan via Boara Padreu and Gair (SH Formation from km 0/00 to 2/885
2021_PWD_44418_2
PW-CB-CTR-2020-21- 22718 dt 09-02-2021
Open Tender
Civil Works
Item Rate
90 days
Shimla
As per SBD
15 documents required · 15 mandatory
₹1,500
₹62,000
8 Mar 2021
17 Feb 2021
26 Feb 2021
17 Feb 2021
25 Feb 2021
17 Feb 2021
Amount
Cutting in earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per the directions of the Engineer-in-Charge. The recover of stones, wheather use full or not, for 3827.50 Cum @ 170/-(One hundred seventy ) per Cubic metre shall be effected on pro rata bases in all circumstances. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Sanjay Kumar
Ranjan public contractor
Gian Chand
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .