| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹3.8 LRejected-Finance | ₹3.8 L | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | ARUMUGAM RAJKUMAR L2 | V.SELVARAJ & SONS L1 |
|---|---|---|---|---|---|
| 1.00Repairs and Renovation Kuruchikulam PUMS Building (1no) in Kuruchikulam Panchayat | |||||
| 2.00 | Clean removal of cement plaster from walls including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 162.82 | Sqm | 9.06 ₹1,475.15 | 9.05 ₹1,473.52 |
| 3.00 | Chipping and Roughening of Plastered Surface including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 162.82 | Sqm | 43.2 ₹7,033.82 | 43.19 ₹7,032.20 |
| 4.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 162.82 | Sqm | 308.85 ₹50,286.96 | 308.84 ₹50,285.33 |
| 5.00 | Paving the floor with best approved quality fine polished shahabad stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification | 162.82 | Sqm | 1,270.54 ₹2.1 L | 1,270.53 ₹2.1 L |
| 6.00 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete | 222.59 | Sqm | 150.42 ₹51,236.06 | 150.42 ₹51,236.06 |
| 7.00 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. | 219.54 | Sqm | 267.42 ₹58,709.39 | 267.42 ₹58,709.39 |
| 8.00 | Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. | 39.78 | Sqm | 157.29 ₹6,257 | 157.28 ₹6,256.60 |
Tender Value
₹5.3 L
EMD Value
₹5,330
Closing Date
13 Mar 2026, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
School Building Repair
2026_RDTN_673665_2
A2/1057/2025
Open Tender
Maintenance Works
180 days
Manur
Refer Tender doc
2 documents required · 2 mandatory
₹0
₹5,330
22 Mar 2026
12 Mar 2026
13 Mar 2026
12 Mar 2026
13 Mar 2026
12 Mar 2026
Repairs and Renovation Kuruchikulam PUMS Building (1no) in Kuruchikulam Panchayat
Clean removal of cement plaster from walls including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Chipping and Roughening of Plastered Surface including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Paving the floor with best approved quality fine polished shahabad stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_809765.xls
BOQ • 1.51 MB