Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -1.00% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance | -0.02% | ₹2.9 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance | +1.00% | ₹3.0 L | L3 | Admitted-Finance |
| 4 | L4₹3.1 LAdmitted-Finance | +5.00% | ₹3.1 L | L4 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,860
Closing Date
10 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. of L/D from H/O sh. Subash chander to main road w.no 1 at pyt Murallian Block Miran Sahib Year 2026-27 under DDC Capex
2026_RDPR_317997_6
e-NIT No.265 REWJ of 2026-27 dated 27-07-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,860
2 Sept 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for clearnace of site | 7 | NO | 553 | ₹3,871 |
| 2 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 9.45 | cum | 479.3 | ₹4,529.39 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in M-7.5(1:5:10) grade, with 40mm nominal size of aggregates. Crushed | 15.08 | cum | 4,826.5 | ₹72,783.62 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- all works upto plinth level 1:3:6(1 cement 3 coarse sand 6 graded stone agg. 20 mm nominal size) crushed | 7.88 | cum | 5,733.6 | ₹45,180.77 |
| 5 | Centring and shuttering including strutting, propping etc and removal of the formwork. | 49.63 | sqm | 286.35 | ₹14,211.55 |
| 6 | Providing and lying 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design /shape laid in required colour and pattern over and including 50 mm thick compacted bed of fine sand ,filling | 154.74 | sqm | 816.15 | ₹1,26,291.05 |
| 7 | P/Laying in position specified grade of reinforcement Cement concrete including curing but excluding cost of centering shuttering and reinforcement all work upto plinth level | 12.41 | sqm | 416.5 | ₹5,168.77 |
| 8 | Providing and laying of R.B.M including spreading, consolidation icluding carriage and supplying with all complete job | 14.91 | cum | 425 | ₹6,336.75 |
| 9 | Carriage of Sand Bajri and Agg.for an avg. lead of 20 Kms by Mt | 31.33 | cum | 409.94 | ₹12,843.42 |
| 10 | Providing & fixing signboard inclu. Painting , writing complete job | 1 | Nos | 2,000 | ₹2,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_1045309.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].