Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | ₹16.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹16.2 LRejected-AOC | ₹16.2 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | DEVARAJ V L2 | M. AYYASAMY L1 |
|---|---|---|---|---|---|
| 1.00Pot Holes Repairs from Valuthoor-Periyapattinam Road Vallabai Ayyappan Kovil to Melur Colony Road (via) Kunduoorani upto Panchayat limit in Regunathapuram Panchayat Km 0/0-2/88 | |||||
| 2.00Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. | |||||
| 3.00 | km 0/0 -2/88 | 108 | cum | 150 ₹16,200 | 140.45 ₹15,168.60 |
| 4.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | |||||
| 5.00 | km 0/0 -2/88 | 36 | cum | 1,100 ₹39,600 | 1,055.72 ₹38,005.92 |
| 6.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 7.00 | km 0/0 -2/88 | 2.54 | cum | 5,500 ₹13,970 | 5,551.54 ₹14,100.91 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | km 0/0 -2/88 | 61.05 | cum | 2,900 ₹1.8 L | 3,273.11 ₹2.0 L |
| 10.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
Tender Value
₹16.1 L
EMD Value
₹16,100
Closing Date
2 Mar 2026, 3:00 pmClosed
Block Developement Officer (B.Pt)
Block Developement Officer (B.Pt)
TPL/P01/Pot Holes Repairs from Valuthoor-Periyapattinam Road Vallabai Ayyappan Kovil to Melur Colony Road (via) Kunduoorani upto Panchayat limit in Regunathapuram Panchayat Km 0/0-2/88
2026_RDTN_667657_1
RMD/TPL/A2/4393/2025
Open Tender
Civil Works
Thiruppullani
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,100
Yes
3 Mar 2026
27 Feb 2026
2 Mar 2026
27 Feb 2026
2 Mar 2026
27 Feb 2026
Pot Holes Repairs from Valuthoor-Periyapattinam Road Vallabai Ayyappan Kovil to Melur Colony Road (via) Kunduoorani upto Panchayat limit in Regunathapuram Panchayat Km 0/0-2/88
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over BT surface using 2.50Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_802082.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
document.pdf
Tender Documents • 0.74 MB
BOQ_802082.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid