Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | L1 | Accepted-AOC Work order issued | |
| 2 | L2₹15.9 L+₹10,577.20 (0.67%)Rejected-Finance NA | NA | NA | 121004 | L2 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | PEARL ENGINEERS CONSTRUCTION CO-OPERATIVE SOCIETY LIMITED L2 | GLOBAL INFOTECH L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift of 10 metres and intial lift of 2 metres hard stiff block cotton hard red earthy shales muram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil as per SS-20B | 36 | M3 | 246 ₹8,856 Lowest | 246 ₹8,856 Lowest |
| 2.00 | Supply and Filling with river sand from approved quarry including cost and conveyance at work site and all other labour charges etc. complete. necessary sectioning and levelling charges etc. | 17 | M3 | 397 ₹6,749 Lowest | 397 ₹6,749 Lowest |
| 3.00 | Plain Cement concrete 1:4:8 (one cement four sand and eight Coarse aggregate) using 40mm hard broken granite Metal for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick well rammed and consolidated complying with standard specification. | 8 | M3 | 5,627 ₹45,016 Lowest | 5,627 ₹45,016 Lowest |
| 4.00 | Reinforced cement Concrete 1:1.5:3 (one cement two sand three Coarse aggregate) mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., to complete as per std. specification. Ground Floor | 17 | M3 | 9,200 ₹1,56,400 | 8,739 ₹1,48,563 Lowest |
| 5.00 | First Floor | 10.04 | M3 | 8,999 ₹90,349.96 Lowest | 8,999 ₹90,349.96 Lowest |
| 6.00 | Head Room | 2.89 | M3 | 9,259 ₹26,758.51 Lowest | 9,259 ₹26,758.51 Lowest |
| 7.00 | Supplying and erecting steel centering including necessary supports for plane surfaces in foundation and basement for reinforced cement concrete works such as column footing, plinth beam, grade beam, stair case step, bed block etc. which require only normal strutting using M.S. sheets of size 90cm x60cm BG 10 gauge of stiffened with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak joists of size 10 x 6.50cm spaced at about 90 cm centre to centre and supported by the casurina props of 10cm to 13cm dia spaced at 75cm centre to centre at suitable intervals etc. complying with standard specification. (The payment for centering shall be made only after the concrete is laid). For Column | 103.5 | M2 | 1,227 ₹1,26,994.5 Lowest | 1,227 ₹1,26,994.5 Lowest |
| 8.00 | Slab & Beam | 70 | No | 1,023 ₹71,610 Lowest | 1,023 ₹71,610 Lowest |
| 9.00 | Supplying and fabricating MS (or) R.T.S. bar below 16 mm SI. 134 Supplying and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors -1 Qtl Adopting cost of rods as applicable for R.T.S rods | 2,700 | Kg | 89 ₹2,40,300 Lowest | 89 ₹2,40,300 Lowest |
| 10.00 | Brick Work in CM 1:5 mix using Stock bricks 9"x 4 1/2" x 3" including cost and conveyance of materials and labour charges etc., complete as per standard specification. Ground Floor | 8.92 | M3 | 8,200 ₹73,144 Lowest | 8,200 ₹73,144 Lowest |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
16 Sept 2025, 3:00 pmClosed
Executive Officer
Sethiyathope Town Panchayat
Construction of Community Hall Extension at Ward 2 New colony in Sethiyathope TP
2025_DTP_601696_1
181/2025
Open Tender
Civil Works
Works
90 days
Sethiyathope
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹19,000
25 Sept 2025
8 Sept 2025
16 Sept 2025
8 Sept 2025
16 Sept 2025
8 Sept 2025
8 Sept 2025 - 16 Sept 2025
Amount
Earthwork excavation and depositing on bank with initial lead and lift of 10 metres and intial lift of 2 metres hard stiff block cotton hard red earthy shales muram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil as per SS-20B
Supply and Filling with river sand from approved quarry including cost and conveyance at work site and all other labour charges etc. complete. necessary sectioning and levelling charges etc.
Plain Cement concrete 1:4:8 (one cement four sand and eight Coarse aggregate) using 40mm hard broken granite Metal for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick well rammed and consolidated complying with standard specification.
Reinforced cement Concrete 1:1.5:3 (one cement two sand three Coarse aggregate) mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., to complete as per std. specification. Ground Floor
First Floor
Head Room
Supplying and erecting steel centering including necessary supports for plane surfaces in foundation and basement for reinforced cement concrete works such as column footing, plinth beam, grade beam, stair case step, bed block etc. which require only normal strutting using M.S. sheets of size 90cm x60cm BG 10 gauge of stiffened with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak joists of size 10 x 6.50cm spaced at about 90 cm centre to centre and supported by the casurina props of 10cm to 13cm dia spaced at 75cm centre to centre at suitable intervals etc. complying with standard specification. (The payment for centering shall be made only after the concrete is laid). For Column
Slab & Beam
Supplying and fabricating MS (or) R.T.S. bar below 16 mm SI. 134 Supplying and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors -1 Qtl Adopting cost of rods as applicable for R.T.S rods
Brick Work in CM 1:5 mix using Stock bricks 9"x 4 1/2" x 3" including cost and conveyance of materials and labour charges etc., complete as per standard specification. Ground Floor
First Floor
Secent Floor
STEEL DOOR (SIZE 0.90M x 2.10 M) Fabricating supplying & fixing of M.S. Doors with single / two leaves with following specifications Door outer frame 40 x 40 x 6mm angle, Shutter frame 35 x 35x6mm Angle, MS sheet 20 guage Intermediate Stiffener "T" Section 25x25x6mm, panel should be covered with 20 guage M.S. Sheet with necessary Tower Bolt 30cm length, butt hinges, handle on both sides hold fast etc., complete with one coat of red oxide primer.
STEEL WINDOW (SIZE 1.00M x 1.30 M) Manufacturing supplying and fixing in position of steel window glazed with openable shutter frame and shutter frame made out of steel sections confirming to IS 7452/1982. The outer frames of windows made out of "Z" section (F7D) of size 20x20x3mm confirming to IS 7452/1982. Mullions are made out of (F4B) T section of size 46 x 25 x 3mm confirming to IS 7452/1982. The shutters are individual and each of them can be operated separately. Sash bars are made of "T" Section (T2) of size 25x22x3mm. 2 Nos. of surdy hinges and one number of handle cum ratch of special type are fixed for each openable shutter. Suitable opening is left for its easy operation. One number of window adjustable string with fixing bracket of sufficient length are provided for each shutter 4 No. of 40x40x3mm angle fold fosts of 230mm length are welded to the frames at appropriate point. M.S. Square bars of 12mm size is welded to the inner face of the window at equal intervals not excluding 10 cm spacing 3mm 3mm pin headed glass is used for glazing with good quality or 20 gauge M.S. sheet to be used. T.W. beeding of size 15x15mm with screws for fixing. All members are painted with one coat of red oxide primer. The rate is inclusive of each of all materials, labour charges for fixing, one coat of primer, welding charges transportation to the site of work loading, unloading and all other incidental charges etc. complete. (SR of 2006-07)
Plastering with cement mortar 1:3 (one cement and three sand) mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc. complete as per standard specification.
Plastering with cement mortar 1:5 (One cement and five sand) mix to 12mm thick including costand conveyance of all materials to site and all labour charges etc. complete as per standard specification.
Weathering Course Terrace Flooring with pressed tiles over broken bricks jelly concrete 20mm thick brick jelly and top finished with pressed tiles 20cm x 20cm x 20mm set in cm 1:3 using crude oil and points with same wibed mortar - 10 m2
Laying with new ceramic tiles 600 x 600 x 8mm tk for flooring and set in Cement Mortar 1:3 and pointed with white cement including adding with suitable colouring pigments of match with the colour of tiles used and curing etc., complete.
Painting two coats with ready mixed Plastic Emulsion Paint of'approved quality and colour over a priming coat, including 'thorough scrap ping,clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required - 10 m 2
Painting two coats with ready mixed Plastic Emulsion Paint of'approved quality and colour over a priming coat, including 'thorough scrap ping,clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required - 10 m 2
Wiring with 2x 1.5 sqmm (22 / 0.3 ) PVC insulated single core unsheathed copper conductor cable of 1100V grade in suitablePVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box and 5A F.T. switch with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for open PVC light point (SD 16)
Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads from terminals to the fitting. (SD88)
PEARL ENGINEERS CONSTRUCTION CO-OPERATIVE SOCIETY LIMITED (BID ID -1457532)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .