Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Providing New Additional Concrete supporting Pedestals including Stringer supports in Conveyor 54 North and South side in Coal yard area
2026_EB_725006_1
CE SE C TTPS Spec.No. 179 26 27
Open Tender
Civil Works - Others
Item Rate
150 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,400
Yes
11 Nov 2026
11 Nov 2026
27 Nov 2026
11 Nov 2026
26 Nov 2026
11 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing HILTI joint arrangements to the rods by drilling holes into the old concrete and new concrete to a required depth and injecting motor HIT -RE 500 @ 0.50ml./mm chemicals, rate including the cost of chemical, drilling arrangements, labour charges, lead, lift, etc., complete. | 1,62,400 | mm | 78.6 | ₹1,27,64,640 |
| 2 | Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete | 146.2 | M2 | 38.5 | ₹5,628.7 |
| 3 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 1,950 | Kg | 5,155.5 | ₹1,00,53,225 |
| 4 | Providing RCC 1:1.5:3 using OP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work | 11 | M3 | 470.9 | ₹5,179.9 |
| 5 | Supplying and fabricating and forming in position of the new MS Structure as directed carefully without any disturbance to other steel structure rate including cost of all materials hire charges for welding and cutting machine, welding rods including labour lead lift saftey appliances etc complete. | 3,811.2 | Kg | 9,007.3 | ₹3,43,28,621.76 |
| 6 | Supplying and providing the conbextra GP2 or equivalent of 25kg bag and mixed with of proper cement ratio and mixed with 25% of 6mm metal as per the instruction of engineer rate including cost of all materials, welding, shuttering arrangements, labour, lead, lift, hire charges for machine etc., complete. | 166 | Bags | 90.5 | ₹15,023 |
| 7 | Painting two coats with ready mixed enamel paint for the new steel surface with primer including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete. | 105.6 | M2 | 5,533.1 | ₹5,84,295.36 |
| 8 | Providing two coats of anticorrosive black paint with one coat of white cement primer to the concrete surface, rate including cost of all material, labour, lead, lift, etc., complete. | 146.2 | M2 | 284.1 | ₹41,535.42 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_870364.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .