Tender Value
₹1.5 L
Closing Date
12 Apr 2022, 3:00 pmClosed
The Deputy Conservator of Forests
Office of The Deputy Conservator of Forests Wildlife Division Haddo
Labour Components for Construction of RCC Retaining Wall opposite to Cafeteria (1.70 mtr Height ) at NPIC Haddo
2022_DCFWL_5410_1
WL/G-7/1(CAFE)/Vol.l/3018
Open Tender
Construction Works
Works
30 days
NPIC Haddo
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
13 Apr 2022
23 Mar 2022
13 Apr 2022
23 Mar 2022
12 Apr 2022
23 Mar 2022
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Labour components for laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Labour components for laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Earth work in excavation
Labour components for Centring and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete.
Labour components for Centring and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Labour components for Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Labour components for 12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand
Labour components for reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Shri S K Biswas
ARJUN MANDAL
M/S SUNDARAM CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .