Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.9 LAccepted-AOC 01 MADHU BHAWAN FIRST FLOOR FLATE NO 01 NAWADIH DHANBAD JHARKHAND 828130 | DHANBAD | JHARKHAND | 828130 | ₹1.9 L | l1 | Accepted-AOC l1 |
| 2 | l2₹2.0 L+₹3,707.60 (1.91%)Rejected-Finance AT KARGALI BAZAR PO BERMO PSBERMO DIST BOKARO JHARKHAND 829104 | BOKARO | JHARKHAND | 829104 | ₹2.0 L+₹3,707.60 (1.91%) | l2 | Rejected-Finance l2 |
| 3 | l3₹2.0 L+₹7,237.80 (3.73%)Rejected-Finance AT JAWAHAR NAGAR PO BERMO DIST BOKARO PIN 829104 JHARKHAND | BERMO | BOKARO | JHARKHAND | 829104 | ₹2.0 L+₹7,237.80 (3.73%) | l3 | Rejected-Finance l3 |
| Sl No | Description | Qty | Unit | M/S ROSHNI ENTERPRISES L2 | Vedant Enterprises L1 | M/S JAI MAA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.01 | Part rewinding of 350 kW Motor coil (minus 60% salvage) i.e. 40% of the damaged coil weight, (Total Coil Wt. = 5.500 kg x 60 no. = 330 kg, Damaged coil Wt. = 5.500 x 32 no. = 176 kg), i.e. (40% of 176 kg = 70.40 kg) | 70.4 | kg | 1,008 ₹70,963.2 | 989 ₹69,625.6 Lowest | 1,026 ₹72,230.4 |
| 1.02 | Insulating material @ 15% of the Cu cost (i.e. 0.15 x 176 kg x Rs.900/kg | 1 | job | 26,611 ₹26,611 | 26,100 ₹26,100 Lowest | 27,086 ₹27,086 |
| 1.03 | Labour cost @ 15% of the Cu cost (i.e. 0.15 x 176 kg x Rs.900/ kg | 1 | job | 26,611 ₹26,611 | 26,100 ₹26,100 Lowest | 27,086 ₹27,086 |
| 1.04 | Cost of coil H Class’ molding charge | 32 | no. | 1,120 ₹35,840 | 1,100 ₹35,200 Lowest | 1,140 ₹36,480 |
| 1.05 | Complete motor set dismantling. After repairing work, its complete assembling/ commissioning with testing and checking. | 1 | job | 19,773 ₹19,773 | 19,400 ₹19,400 Lowest | 20,126 ₹20,126 |
| 1.06 | Supervision, incidental and overhead expenses | 1 | job | 17,980 ₹17,980 | 17,645 ₹17,645 Lowest | 18,300 ₹18,300 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
8 Apr 2025, 11:55 amClosed
PE EnM Karo OCP
OFFICE OF PE EnM Karo OCP
Repairing and part rewinding of one no. 3.3 kV, 350 kW, 1490 RPM, Marathon Electric make, Sr. No. F330123 by 1, Three Phase Induction Motor, installed in Mine at Karo OCP, under BnK Area
2025_CCL_333533_1
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 130
Open Tender
Electrical and Maintenance Works
Item Rate
5 days
KARO OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,700
24 Aug 2026
29 Mar 2025
9 Apr 2025
29 Mar 2025
8 Apr 2025
29 Mar 2025
29 Mar 2025 - 8 Apr 2025
Amount
Part rewinding of 350 kW Motor coil (minus 60% salvage) i.e. 40% of the damaged coil weight, (Total Coil Wt. = 5.500 kg x 60 no. = 330 kg, Damaged coil Wt. = 5.500 x 32 no. = 176 kg), i.e. (40% of 176 kg = 70.40 kg)
Insulating material @ 15% of the Cu cost (i.e. 0.15 x 176 kg x Rs.900/kg
Labour cost @ 15% of the Cu cost (i.e. 0.15 x 176 kg x Rs.900/ kg
Cost of coil H Class’ molding charge
Complete motor set dismantling. After repairing work, its complete assembling/ commissioning with testing and checking.
Supervision, incidental and overhead expenses
Total impact of GST for the purpose of CTC
M/S ROSHNI ENTERPRISES (BID ID -1147217)
M/S JAI MAA ENTERPRISES (BID ID -1147218)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .