Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
30 Jan 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM (MM)
REIL Kanakpura Jaipur
NIT for the Provision of upstream electrical infrastructure, electrical connection from DISCOM, civil and miscellaneous works related to the installation and commissioning of EV Charging Stations in Bhopal
2026_REIL_893174_1
REIL/NP/2025-26/003
Open Tender
Miscellaneous Works
Item Rate
60 days
REIL Kanakpura Jaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Rajasthan Electronics and Instruments Limited
₹9.2 L
Yes
REIL Kanakpura Jaipur
22 May 2026
9 Jan 2026
31 Jan 2026
9 Jan 2026
30 Jan 2026
9 Jan 2026
9 Jan 2026 - 16 Jan 2026
15 Jan 2026
Transformer Foundation (PCC)
HT Panel Foundation (PCC)
DB Panel Foundation (PCC)
Cable Trench
Floor Levelling (PCC)
Boundary Wall (9" Brick wall of 1 mtr. Height)
Paint & Marking (area)
Canopy/Shade
Cable Laying
Cable Terminations at Panel & Transformer/Panel
Light
Bollards
Banners & Hoardings
Transformer 200 KVA
Transformer 250 KVA (Oil Immeresed)
Transformer 250 KVA (Dry Type)
Transformer 400 KVA
HT Panel (Load Range- 187 KW to 374 KW)
HT Panel (Load Range- 50 KW)
Dinstribution Box (DB) Panel Body
100 Amp, 4Pole MCCB
250 Amp, 4Pole MCCB
400 Amp, 4Pole MCCB
10 Sqmm, 4 Core Cu Flex.
25 Sqmm, 4 Core Cu Flex.
95 Sqmm, 4 Core Cu Flex.
185 Sqmm, 4 Core Al. Armoured
250 Sqmm, 4 Core Al. Armoured
385 Sqmm, 4 Core Al. Armoured
3 Mtr. 50/3 CU GI Earthing
Lightening Arrester
Cable Tray
CT-100/5 for load capping up to 100 KW
Energy Meter
Design cost at all sites within the city
Safety & Security at all sites within the city for the duration of the Contract,i.e. 05 years from COD
Comprehensive maintenance (spares, consumables, labour) post the warranty period at all sites within the city (Year 3rd from COD)
Comprehensive maintenance (spares, consumables, labour) post the warranty period at all sites within the city (Year 4th from COD)
Comprehensive maintenance (spares, consumables, labour) for 03 years post the warranty period at all sites within the city (Year 5th from COD )
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.23 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_938808.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .