| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.5 LAccepted-AOC T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹7.5 L | L-1 | Accepted-AOC Accepted as a L-1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not eligible for price bid opening |
| 3 | Rejected-Technical 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | - | - | Rejected-Technical Not eligible for price bid opening |
| Sl No | Description | Qty | Unit | META ELECTRIC L1 |
|---|---|---|---|---|
| 1.00 | For 400KVA, 11KV/3.3KV Transformer (i)Cost of Primary bare conductor (copper) 226 Kg @ 876 = 197976 (ii) Cost of Secondary bare conductor (copper) 146 kg @ 876 = 127896. Total cost (Primary + Secondary) = 3,25,872. Less Scrap Rs.185640. Total amount comes to ( Rs.3,25,872 - Rs.185640) = Rs.1,40,232 | 1 | No | 1,40,232 ₹1,40,232 Lowest |
| 2.00 | Insulation of conductor for primary coils & secondary coil by double coated manila paper | 372 | Kg | 65 ₹24,180 Lowest |
| 3.00 | Dismantling the coil from the trasformer tank | 1 | NO | 3,500 ₹3,500 Lowest |
| 4.00 | Lamination of the core with proper materials | 1 | NO | 8,000 ₹8,000 Lowest |
| 5.00 | Cleaning of cooling tubes & tanks | 1 | NO | 3,500 ₹3,500 Lowest |
| 6.00 | Cooling pipe welding as per requirement | 1 | NO | 7,000 ₹7,000 Lowest |
| 7.00 | Fitting of MS channel on both side of the tank | 1 | NO | 6,500 ₹6,500 Lowest |
| 8.00 | Gasket, nut, bolts & other hardware items | 1 | NO | 3,000 ₹3,000 Lowest |
| 9.00 | Repairing of complete set of tap changer siwtch | 1 | NO | 6,200 ₹6,200 Lowest |
| 10.00 | Studs with replacement of insulator | 7 | NO | 1,500 ₹10,500 Lowest |
Tender Value
₹7.5 L
EMD Value
₹9,400
Closing Date
18 Nov 2025, 5:00 pmClosed
General Manager, Kunustoria Area
O/O The General Manager, Kunustoria Area, P.O- Toposi, Paschim Bardhaman, 713362, (W.B)
Repairing of one 400KVA and one 750KVA , 11KV/3.3KV power transformers installed at NSOCP under Kunustoria Area.
2025_ECL_346875_1
ECL/KNT/EnM/e-Ten/25-26/23 dt 03.11.2025
Open Tender
Miscellaneous Works
Item Rate
30 days
North Searsole OCP
As per NIT
4 documents required · 4 mandatory
₹9,400
18 Jun 2026
6 Nov 2025
19 Nov 2025
6 Nov 2025
18 Nov 2025
7 Nov 2025
7 Nov 2025 - 11 Nov 2025
Amount
For 400KVA, 11KV/3.3KV Transformer (i)Cost of Primary bare conductor (copper) 226 Kg @ 876 = 197976 (ii) Cost of Secondary bare conductor (copper) 146 kg @ 876 = 127896. Total cost (Primary + Secondary) = 3,25,872. Less Scrap Rs.185640. Total amount comes to ( Rs.3,25,872 - Rs.185640) = Rs.1,40,232
Insulation of conductor for primary coils & secondary coil by double coated manila paper
Dismantling the coil from the trasformer tank
Lamination of the core with proper materials
Cleaning of cooling tubes & tanks
Cooling pipe welding as per requirement
Fitting of MS channel on both side of the tank
Gasket, nut, bolts & other hardware items
Repairing of complete set of tap changer siwtch
Studs with replacement of insulator
Insulation materials like varnish, etc.
Re-tanking the coil into the tank
Final assembling of the motor in all respect and testing by appropriate supply voltage
Labour charges
Oil Filtration
Transportation charges
Overhead profit10%
For 750KVA, 11KV/3.3KV Transformer (i)Cost of Primary bare conductor (copper) 245 Kg @ 876 = 214620 (ii) Cost of Secondary bare conductor (copper) 180 kg @ 876 = 157680. Total cost (Primary + Secondary) = 3,72,300 Less Scrap 404 Kg @ 510 = Rs.206040. Total amount comes to ( Rs.3,72,300 - Rs.206040) = Rs.1,66,260
Insulation of conductor for primary coils & secondary coil by double coated manila paper
Dismantling the coil from the trasformer tank
Lamination of the core with proper materials
Cleaning of cooling tubes & tanks
Cooling pipe welding as per requirement
Fitting of MS channel on both side of the tank
Gasket, nut, bolts & other hardware items
Repairing of complete set of tap changer siwtch
Studs with replacement of insulator
Insulation materials like varnish, etc.
Re-tanking the coil into the tank
Heating & testing of the coil
Labour charges
Oil Filtration
Transportation charges
Overhead profit10%
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 1.24 MB
Tendernotice_3.pdf
PDF • 2.11 MB
BOQ_359565.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .