| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 CrAccepted-AOC PLOT NO 2222 AT PO SALIPUR CUTTACK ODISHA CUTTACK ODISHA 754202 | CUTTACK | ODISHA | 754202 | L1 | Accepted-AOC The Unicorn India Pvt. Ltd. is found as L1 Bidder. | |
| 2 | L2₹13.8 Cr+₹21.1 L (1.56%)Rejected-Finance 3RD FLOOR ROOM NO 3004 A LAXMIPRIYA 752101 KHORDHA ODISHA INDIA | KHORDHA | ODISHA | 752101 | L2 | Rejected-Finance L2 Bidder. | |
| 3 | Rejected-Technical | - | Rejected-Technical The Agency has not furnished relationship declaration. Hence rejected. | |
| 4 | Rejected-Technical | - | Rejected-Technical Does not Qualify in satisfactory completion of similar work and minimum annual turn over as per Bid document. | |
| 5 | Rejected-Technical | - | Rejected-Technical Does not Qualify in minimum annual turn over as per Bid document. |
Tender Value
Refer Docs
Closing Date
5 Jan 2022, 5:00 pmClosed
C.E and B.M, Brahmani Basin, Samal
O.O the C.E and B.M, Brahmani Basin, Samal, At/PO- Samal Barrage Township, Dist- Angul, Odisha, 759037
Construction of In-stream Storage Structure at Village Sirigida Across River Banguru in District Angul.
2021_CEBBS_72907_1
CEBBS-AID-03/2021-22
National Competitive Bid
Civil Works - Others
Turn-key
540 days
Angul
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Exempted
O.O the C.E and B.M, Brahmani Basin, Samal
13 Jun 2022
22 Nov 2021
6 Jan 2022
22 Nov 2021
5 Jan 2022
22 Nov 2021
22 Nov 2021 - 4 Dec 2021
7 Dec 2021
Construction of In-stream Storage Structure at Village Sirigida Across River Banguru in District Angul including hydro-mechanical works, Power connectivity works, road connectivity, staff quarters,construction of afflux bund/guide bund/protection works of main river & all upstream tributaries including survey, investigation, Planning, design and estimate of all components as per Technical Specification, relevant IS codes, IRC codes, MoRTH specification, CWC manuals & CBIP manuals etc. complete in all respect.
Operation & maintenance of all components of the work for 5(five) years or five flood seasons whichever is more, after commissioning as per relevant clauses of the agreement, Technical Specification, relevant IS codes, IRC codes, MoRTH specification, CWC & CBIP manuals etc. complete in all respect.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .