| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82,487.05Accepted-Finance | ₹82,487.05 | L1 | Accepted-Finance Lowest bidder hence accepted |
| 2 | L2₹86,373.87Rejected-Finance | ₹86,373.87 | L2 | Rejected-Finance Highest bidder hence rejected |
| 3 | L3₹88,101.35Rejected-Finance | ₹88,101.35 | L3 | Rejected-Finance Highest bidder hence rejected |
| 4 | L4₹88,965.09Rejected-Finance | ₹88,965.09 | L4 | Rejected-Finance Highest bidder hence rejected |
Tender Value
₹86,374
EMD Value
₹1,700
Closing Date
21 Jan 2026, 1:35 pmClosed
PRADHAN S1GP
Khaptawali gaon, Soureni-I GP, PO- Soureni, Mirik, Dist- Darjeeling
Construction of Piggery shed on the land of Roshan Subba
2026_GTA_986424_5
10/PRA/S-I/15THFC/UT/2025-26
Open Tender
CIVIL WORKS
Toklang
Please refer Tender documents.
4 documents required · 4 mandatory
₹250
₹1,700
12 Feb 2026
10 Jan 2026
27 Jan 2026
10 Jan 2026
21 Jan 2026
10 Jan 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1.500 mm.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. (b) River bazree.
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.(i) (1:3:6) proportion.
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.(ii) River bazree.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.other than SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).(a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].(ii) With 1:4 cement mortar .
M.S. structural works in roof trusses with tubular sections conforming to IS: 806- 1957 & IS: 1161- 1958 connected to one another with bracket,gusset,cleats as per design, direction of Engineer-In-Charge complete including cutting to requisite size. fabrication with necessary metal arc welding conforming to IS: 816- 1956 & IS: 9595 using electrodes of approved make and brand conforming to IS: 814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section. consumables such as electrodes, gas and hire charges of all tools and plants and labour required for the work including all incidental charges such as electricity charges, labour insurance charges etc.(Payment to be made on the basis of calculated weight of structural tubular members as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with the weight of finished structural members. The rates are considered for a height of erection 8m./ 2nd. floor leves from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initial 8m. or part ther of.(i) For trusses spanning up to 12.00 m.
Galvanized corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugaion minimum side lap. ( payment to be made on area of finished work). (GCI sheet to be supplied by contractor).(i) in Roof:-.(b) With 0.63 mm.thick sheet.
Display Board
Add 18 % GST on Total Amount
Add 1%labour cess on (Total Amount + GST)
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_2409568.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid