Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -1.00% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹3,889.29 (2.02%)Admitted-Finance | +1.00% | ₹2.0 L+₹3,889.29 (2.02%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹5,833.94 (3.03%)Admitted-Finance | +2.00% | ₹2.0 L+₹5,833.94 (3.03%) | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
17 Sept 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Construction of Tile work at Kanjik di Talai at Sultanpur Pyt. Sehora B Block Bishnah under scheme MLA-CDF for the year of 2026-27.
2026_RDPR_323508_1
e-NIT No. 529 REWJ of 2026-27 dated 05-09-2026
Open Tender
Civil Works
Percentage
30 days
Executive Engineer REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
MH0515
₹3,880
18 Sept 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
17 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | General site clearance including levelling of ground and disposal of material. (LS) | 3 | no. | 553 | ₹1,659 |
| 2 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 8.16 | cum | 4,826.5 | ₹39,384.24 |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 4.3 | cum | 5,733.5 | ₹24,654.05 |
| 4 | Providing and Laying of River Bed Material (R.B.M)/ Nallah bed Material (N.B.M) including spreading,consolidation complete in all respect including Loading, unloading and carriage complete ( to bequoted by Contractor ) | 7.37 | cum | 425 | ₹3,132.25 |
| 5 | Providing and lying 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design /shape laid in required colour and pattern over and including 50 mm thick compacted bed of fine sand ,filling | 133.83 | sqm | 816 | ₹1,09,205.28 |
| 6 | Centring and shuttering including strutting, propping in footing , foundation etc | 20.91 | sqm | 286.35 | ₹5,987.58 |
| 7 | carriage sand and bajri by lead 25 km by m.t | 16 | cum | 465.14 | ₹7,442.24 |
| 8 | Add Cost of sign board | 1 | no. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_1089238.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .