Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical NO 1 38 SOUTH STREET KARANTTAM POST VIRUDHACHALAM TALUK CUDDALORE DISTRICT 606 104 | CUDDALORE | TAMIL NADU | 606104 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical NO 75 76 DHANALAKSHMI NAGAR EXTENSION GUNDUSALAI CUDDALORE 607001 | CUDDALORE | CUDDALORE | TAMIL NADU | 607001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical OLD NO 470 NEW NO 700 ANNA SALAI NANDANAM CHENNAI 600035 | CHENNAI | CHENNAI | TAMIL NADU | 600035 | Admitted-Fee/PreQual/Technical |
Tender Value
₹7.1 Cr
EMD Value
₹3.7 L
Closing Date
19 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of the Superintending Engineer, PWD., Building Construction and Maintenance Circle, Thanjavur-1
Construction of Additional Building in Government Medical College Hospital at Chidambaram in Cuddalore District
2026_PWD_720838_1
18-2026-2027
Open Tender
Civil Works - Buildings
Lump-sum
330 days
Chidambaram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.7 L
20 Nov 2026
5 Nov 2026
20 Nov 2026
5 Nov 2026
19 Nov 2026
5 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Reinforced cement concrete clearing away and carefully stacking materials useful for re-use etc., complete and as directed by the departmental officers. | 11.1 | Cu.m | - | - |
| 2 | Dismantling Brick / stone masonry in Cement mortar walls under 3m high clearing away and carefully stacking materials useful for re-use etc., complete and as directed by the departmental officers. | 19 | Cu.m | - | - |
| 3 | Dismantling and Clean Removing of Machine Pressed Tiles carefully stacking materials within compound places etc.complete complying with standard specification. | 793 | Sq.m | - | - |
| 4 | Dismantling and Floor finish and dadooing walls in cement mortar with carefully stacking materials within compound places etc.complete complying with standard specification. | 572 | Sq.m | - | - |
| 5 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 277 | Cu.m | - | - |
| 6 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 12 | Cu.m | - | - |
| 7 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 64 | Cu.m | - | - |
| 8 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 21 | Cu.m | - | - |
| 9 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 85 | Cu.m | - | - |
| 10 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 119 | Cu.m | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
CHIDAMBARAMGHCON.pdf
Tender Documents • 8.28 MB
BOQ_865612.xls
BOQ • 0.52 MB
PQDRAFT.pdf
Additional Documents • 0.59 MB
CorrigendumNo18.pdf
PDF • 0.32 MB
PQDRAFTREVISED.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .