| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.0 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹82.4 L+₹40,801.80 (0.50%)Rejected-AOC VIJAYAKUM AR | L2 | Rejected-AOC REJECT | |
| 3 | L3₹1.1 Cr+₹27.2 L (33.1%)Rejected-AOC | L3 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | N.Guruvayurappan L2 | AMMAN BUILDERS L1 | G VENUGOPAL L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing light Jungles and Destroying the same effectively as directed by the departemntal officers etc., complete complying with standard s-ecification | 315 | m3 | 10 ₹3,150 | 6 ₹1,890 Lowest | 46 ₹14,490 |
| 2.00 | Earth work excavation in all soils and Sub Soils with initial lead and lift including all Labour Charges as per the Direction of the De-artmental officers etc. complete | 1,290 | m3 | 185 ₹2,38,650 | 180 ₹2,32,200 | 175.34 ₹2,26,188.6 Lowest |
| 3.00 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 990 | m3 | 75 ₹74,250 | 67 ₹66,330 Lowest | 258.5 ₹2,55,915 |
| 4.00 | Cement concrete 1:4:8 mix (One Cement, Four Sand, Eight Aggregate) using 40mm size HBG metal from approved quarry Complying with Standard S-ecification etc. complete | 154.8 | m3 | 5,600 ₹8,66,880 | 5,590 ₹8,65,332 Lowest | 7,719.8 ₹11,95,025.04 |
| 5.00 | Centering with steel centering for revetment, drain and culvert Above 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L’ angie wood runners of size 0.075 X 0.05 three rows with support by cagsurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr above 4 Feet | 1,589.4 | m2 | 490 ₹7,78,806 | 489 ₹7,77,216.6 Lowest | 1,337.38 ₹21,25,631.77 |
| 6.00 | Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand, three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard Specifications at all leads inside the building | 336.15 | m3 | 9,400 ₹31,59,810 | 9,370 ₹31,49,725.5 Lowest | 9,900 ₹33,27,885 |
| 7.00 | Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning,cutting, ending. placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc..,) with the relevant standard specifications, complete for all leads & lifts. | 314 | Qtl | 9,350 ₹29,35,900 | 9,320 ₹29,26,480 Lowest | 10,780 ₹33,84,920 |
| 8.00 | Providing and laying well gravel including cost and conveyance of all materials from approved quarried as noted in lead chart to the road side including loading, unloading and stacking the well gravel at road side to departmental gauge for premeasurement including labour charges for laying spreading leaveling to camper etc complete as per specifications. | 505.98 | m3 | 370 ₹1,87,212.6 | 365 ₹1,84,682.7 Lowest | 770.49 ₹3,89,852.53 |
Tender Value
₹98.6 L
EMD Value
₹98,600
Closing Date
29 Sept 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Retaining wall to the Channel at Thiru Nagar Machampalayam in ward no 94 South Zone
2025_MAWS_604596_1
e46/2025- Two Cover
Open Tender
Civil Works
Works
180 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹98,600
7 Nov 2025
17 Sept 2025
30 Sept 2025
17 Sept 2025
29 Sept 2025
17 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .