Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.8 Cr | ₹5.8 Cr | - |
| 2 | Qualified | - | Qualified |
| 3 | Not Qualified | - | Not Qualified |
Tender Value
Refer Docs
EMD Value
₹14.1 L
Closing Date
28 May 2020, 11:00 amClosed
KIRAN
Power Grid Corporation of India Limited Northern Region-III Headquarter 12, Rana Pratap Marg Lucknow (UP) - 226001.
Retro fitment works of 4 set of ABB Sweden make 400KV AC Converter Circuit Breaker at Vindhyachal HVDC Station
5002001005/OTHERS/DOM/K00 - NR3 RHQ -1
Open
Electrical Work/ Equipment
Supply
Vindhyachal
₹25,000
₹14.1 L
10 Nov 2020
27 Feb 2020
29 May 2020
27 Feb 2020
27 May 2020
27 Feb 2020
18 Mar 2020
420KV, 3150A, 63KA W/O PIR with CSD
01 SPARE SET-02 POLES WITH ACCESSORIES
Dismantling ETC work, civil works
Dismantling ETC work, civil works new CB
Dismantling, ETC of existing CT, Civil WO
Dismantling of Existing BPI with Civil WORK
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
03-TS PART 2_SWITCHYARD ERECTION.pdf
pdf • 4.45 MB
05-TS PART 4 GTR.pdf
pdf • 1.19 MB
06 CT GA DRAWING.pdf
pdf • 0.49 MB
07-TS OLD CB ABB.pdf
pdf • 0.42 MB
08-CT SUPPORT STRUCTURE DRAWING.pdf
pdf • 3.01 MB
09-CB GA DRAWING.pdf
pdf • 0.12 MB
~$-Annexure - A (BDS) QR Vol-I.doc
doc • 0.00 MB
~$-Annexure-I to Section-V (SCC).docx
docx • 0.00 MB
~$-Appendix-I to SCC.doc
doc • 0.00 MB
~$-Section - I IFB SSTE Vol-I.doc
doc • 0.00 MB
~$-Section - II ITB SSTE SI_SRM_March 2016.doc
doc • 0.00 MB
~$-Section - III BDS SSTE Vol -I.docx
docx • 0.00 MB
~$-Section - V SCC SSTE Vol-I.doc
doc • 0.00 MB
~$-Section - VI Forms and Procedures Vol-I.doc
doc • 0.00 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.04 MB
02-Section - II ITB SSTE SI - Sep 2018.pdf
pdf • 0.43 MB
03-Section - III BDS SSTE Vol -I.docx
docx • 0.05 MB
04-Annexure - A (BDS) QR Vol-I.doc
doc • 0.05 MB
05-Annexure - B (BDS) eRA.docx
docx • 0.02 MB
06-Annexure - C (BDS) Make in India.docx
docx • 0.02 MB
07-Annexure - D (BDS) Sample Format for eRA.docx
docx • 0.03 MB
08-Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
09-Section - V SCC SSTE Vol-I.doc
doc • 0.07 MB
10-Appendix-I to SCC.doc
doc • 0.17 MB
11-Annexure-I to Section-V (SCC).docx
docx • 0.02 MB
12-Section - VI Forms and Procedures Vol-I.doc
doc • 0.41 MB
01- Scope of work.pdf
pdf • 1.08 MB
02-TS Part 1_CB.pdf
pdf • 0.62 MB
04-TS PART 3_SWITCHYARD CIVIL.pdf
pdf • 1.99 MB
~$ (Applicable) Attachment -23-Declaration by the Bidder regarding events encountered.docx
docx • 0.00 MB
~$(Applicable) Attachment 22- Compliance to eRA process.doc
doc • 0.00 MB
~$(Mandatory) Attachment 20- Affidavit for self-certification.DOCX
docx • 0.00 MB
~$Attachment-8_First Envelope.doc
doc • 0.00 MB
1-1st Envelope-Attachments.xls
xls • 4.69 MB
2-Attachment-8_First Envelope.doc
doc • 0.03 MB
3 -(Mandatory) Attachment 14 - Integrity Pact.pdf
pdf • 0.20 MB
4-(Mandatory) Attachment 20- Affidavit for self-certification.DOCX
docx • 0.02 MB
5-(Not Applicable) Attachment 21- Certificate by Auditor.docx
docx • 0.02 MB
6-(Applicable) Attachment 22- Compliance to eRA process.doc
doc • 0.03 MB
7- (Applicable) Attachment -23-Declaration by the Bidder regarding events encountered.docx
docx • 0.03 MB
Bill of Material (Only for reference purposes).xls
xls • 0.01 MB
Check List before Uploading bids.docx
docx • 0.02 MB
Letter-Extention.docx
docx • 0.02 MB
Letter-Extention.docx
docx • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .