Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
24 Aug 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MD
SCSM SHAHABAD
WetScrubberAndPolishingUnit
2021_HBC_184083_1
WetScrubberAndPolishingUnit
Open Tender
Power/Energy Projects/Products
Supply
shahabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Exempted
27 Aug 2021
18 Aug 2021
25 Aug 2021
18 Aug 2021
24 Aug 2021
18 Aug 2021
18 Aug 2021 - 24 Aug 2021
60 days
DESIGN, SUPPLY, ERECTION, COMMISSIONING AND OPERATION OF SUITABLE CAPACITY WET SCRUBBER/POLISHING UNIT FOR OUR 125 TPH, 87 KG/CM² PRESSURE BOILER OF MAKE- SITSON INDIA PVT. LTD
i) Design, Supply, erection and commissioning of wet scrubber/ polishing unit to suit/ achieve SPM level of stack emission as per norms below 50Mg/NM³ for our existing 125 TPH, 87kg/cm² capacity boiler. The consent to operate shall be in the scope of supplier, where as any statutory fee of the department shall be in scope of Shahabad sugar mill, the system has to be designed, supplied, erected & commissioned in such a way that existing ESP shall work in series with the new supplied and erected system & the old ESP system can operate independently as per requirement. If existing ESP system is not in working/ operation new system should be designed to handle the total volume of flue gasses with maintaining the norm/ parameters as mentioned above The existing ESP technical parameter is Enclosed at annexure:-A. The wet Scrubber /polishing unit shall be designed suitable for 140 M³ per second gas volume treatment and discharge. Brief of the design, supply, erection and commissioning of the wet scrubber / polishing unit required is as under However the supplier is fully liable to supply, erect & commission the additional equipment (if any) to achieve the specified norms of the stack emission. ii) The operation and maintenance of the wet scrubber/ polishing unit shall be in the scope of supplier for one year after final date of commissioning to achieve the specified SPM norms of the stack emission. In case any penalty/closure is imposed by HSPCB and CPCB on Shahabad Sugar Mills on this account that shall be fully liable to be recovered/charged from the bidder /supplier. The bidder/supplier is also fully responsible for any malfunctioning of the existing Boiler on account of wrong design/supply of its equipment which may hamper the working of existing Boiler.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .