Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.3 Cr
EMD Value
₹8.3 L
Closing Date
7 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Circle Officer
Addl Chief Engineer,Drainage Circle, Kataka
Improvement to Hatia DC from RD 0.00 to 10.14 km under DOAB-II under Mahakalapada Block
2026_CEDC_146983_1
ACEDC-CTC-19/26-27
National Competitive Bid
Civil Works - Others
Percentage
540 days
Kendrapara
2 documents required · 2 mandatory
₹10,000
₹8.3 L
Yes
21 Nov 2026
21 Nov 2026
8 Dec 2026
21 Nov 2026
7 Dec 2026
21 Nov 2026
21 Nov 2026 - 27 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting by dredging from river/ nalla for depths varying from 1.00m to 3.00m including fixing of pipelines, floaters and floating pipelines for disposing of water slurry consisting of all kinds of soil including medium fine sand and coarse sand with gravely earth. The rate shall include the cost of labour, materials, consumables POL, spare parts and accessories to keep dredger, T&P etc. including building the island by providing geo tubes and accessories or by tin sheets for formation of bund for dumping of dredged material with all lead and lift excluding GST as per direction of Engineer-in-Charge. The job includes pre and post dredging surveys for payment purpose.(Disposal distance upto 1000m) | 4,43,797.53 | cum | 186 | ₹8,25,46,340.58 |
| 2 | Earthwork in excavation of foundation of structure by mechanical means in all kind of soil in wet & dry condition, shoring shuttering, propping bullahs, dewatering the foundation including dressing, leveling, ramming the foundation bed & sides with pneumatic rammers/fuel operated compactors and removing the excavated materials with all leads, lifts and delifts away from worksite & depositing the excess materials in spoil banks or any other specified places by manual/mechanical means etc. complete with all cost, conveyance and T&P as per direction of the Engineer-in-charge. | 64.96 | cum | 37.1 | ₹2,410.02 |
| 3 | Filling in foundation and plinth with sand including watering and ramming including cost of all material, labour, royalty and T&P, cess required for the work complete as per the direction of the Engineer-in -charge. | 17.28 | cum | 970.7 | ₹16,773.7 |
| 4 | Providing and laying Cement concrete M 15 in approved surface using 40 mm down graded hard granite well graded crusher broken stone aggregates free from weathered skin surface and any other deleterious materials, using sharp sand of approved grading and quality conforming to the specification, using water of approved quality and using cement as per approved specifications with all leads, lifts and delifts and transportation by mechanical/manual means including carriage, royalty, cess and taxes of all materials, mixing the ingredient in a mechanical mixer, vibrator of concrete by mechanical means, supplying T&P, watering, curing including cost of carriage of water, mobilization and demobilization of men & machineries etc including quality control testing charges as per approved drawing and specifications and direction of the Engineer-in -charge. | 49.81 | cum | 6,258.9 | ₹3,11,755.81 |
| 5 | Filling in foundation and plinth with excavated materials well watered and rammed including cost of labour and T&P, cess required for the work complete as per the direction of the Engineer-in -charge. | 21.65 | cum | 24.7 | ₹534.76 |
| 6 | Supplying, laying and fixing in position RCC spun pipe 600mm dia confirming to NP3 with collar jointed in CM (1:3) including cost, carriage & all other taxes, all labour, cess T&P etc complete as per the direction of Engineer-in-charge. | 40 | rm | 1,774.9 | ₹70,996 |
| 7 | Rigid and smooth centering shuttering for RCC work including false work and dismantling them after casting including all labours ,cess, cost of all materials and hire charges of wood etc. complete as directed by Engineer-in-charge. | 139.66 | sqm | 250.5 | ₹34,984.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 4.66 MB
BOQ_622986.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .