Tender Value
₹805.2 Cr
EMD Value
₹2 Cr
Closing Date
27 Mar 2026, 2:30 pmClosed
Doubling of Track between Furkating (331.138 km) (excluding) and Selenghat stations (including) up to km 394.30 (63.162km) including Electrification and Signalling works in connection with Furkating - New Tinsukia doubling project of Northeast Frontier Railway in the state of Assam on EPC mode
CE-CON-FT-EPC-2026-03~NFRCON
CE-CON-FT-EPC-2026-03
Open
Works - General
1232 Days
Tinsukia, Assam
₹0
₹2 Cr
27 Mar 2026
31 Jan 2026
6 Mar 2026
G1A-Annexure-I and Annexure-II : Execution of USSOR-2021 Items of
G1A-Annexure-III : Execution of NS Items for Civil Works 2001373.20 Below/P
G1B-Annexure-IV, Annexure-V and Annexure-VI For Utility Shifting
Item- 1 Annexure-I and any other items of USSOR-2021 required for Successful completion of Work
S No. Item Description of Item Unit Qty Rate Amount
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Earthwork in filling in embankment,
guide bunds, around buried type
abutments, bridge gaps, trolley
refuges, platforms etc. with
contractor's own earth conforming to
Soil Quality Class SQ1/SQ2/SQ3, after
preparation of foundations as
applicable, benching in existing
banks wherever required, spreading
in layers with motor grader, bringing
the moisture content to OMC,
mechanical compaction to specified
density and dressing of bank to final
profile as per RDSO Specifications:
RDSO/2020/GE: IRS-0004 with latest
correction slips. Note: 1) Foundation
preparation, Benching including
additional earthwork on account of
this, wherever required, shall be paid
extra under relevant schedule item
for benching. 2) Payment for
Earthwork under this item shall be
made based on the cross section
measurements calculated (i) with
original ground profile of existing
bank based on initial ground levels
before doing benching and (ii) final
profile of the bank worked out with
final levels as per prevailing
piles side by side in all kinds of soil
mechanically or manually as per
approved drawing with contractor's
own arrangement complete in all
respects and removal of sheet piles
after completion of the work as
directed by engineer in-charge Note:
Payment will be made as per actual
driven length of pile.
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the bridges,
retaining walls etc. including setting
out, dressing of sides, ramming of
bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation
of the layers by ramming and
watering etc. including all lift,
disposal of surplus soil up to a lead of
300m, all types of shoring and
strutting with all labour and material
complete as per drawing and
technical specification as directed by
Engineer in charge. Note: This item
will be used for excavation work in
connection with other miscellaneous
works also like side drains,
foundation for OHE masts and other
miscellaneous structures in
connection with Gauge Conversion,
Doubling, New lines.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
4 022060 Providing and laying Plain Cement cum 1150.00 4157.89 4781573.50
Concrete 1:3:6 with graded stone
aggregate of 40mm nominal size, in
foundation and floors, retaining walls
of bridges including mechanical
mixing, vibrating, pumping and
bailing out water where ever
required with all materials and labour
complete but excluding the cost of
cement and shuttering as per
drawings and technical specifications
as directed by Engineer.
Boring, providing and installation of
bored cast in-situ Reinforced Cement
Concrete piles of specified diameter
and length below pile cap of
specified grade with Design Mix
Cement Concrete, using 20mm
graded crushed stone aggregate and
coarse sand of approved quality, to
carry a safe working load not less
than specified, concreting by
machine batching, machine mixing,
scaffolding, using Admixture in
approved proportion (as per
IS:9103), placing with tremie pipe,
chipping off of pile top to remove
laitance concrete above cut off level
etc., pumping and bailing out water,
by percussion drilling using Direct
Mud Circulation (DMC) or Bailor and
Chisel technique by tripod and
mechanical Winch machine,
complete in all respect as per
approved drawing, specification and
direction of the Engineer in charge.
Note: 1. Payment for only cement,
reinforcement and permanent casing
pipe (if any ) shall be made extra. 2.
Length of the pile for payment shall
be measured up to the bottom of
RCC pile cap. 3. Plasticiser shall
invariably be used in approved
proportion to increase workability
with minimum possible quantity of
cement for all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not using
plasticiser at the stage of Mix Design
a n d in that case deduction shall be
made as per relevant item.
6 022100 Providing, fabricating and installing MT 1231.38 139982.15 172371219.87
permanent casing pipe for bored
piles for all diameters with specified
thickness of steel plate including all
labour, materials, tools & complete
as per approved drawing &
specifications complete in all respect
as per the direction of Engineer in
charge. Note: Payment shall be made
as per the weight of circular plate of
casing pipe only.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Conducting load test of a single pile
up to specified capacity in
accordance with IS:2911 (Part-IV)
including installation of loading
platform and preparation of pile head
or construction of test cap and
dismantling of test cap after test etc.
with all labour, material, tool &
plants, equipment, machinery, etc.
complete as per drawing and
specification, as directed by the
7 022123 Initial load test above 100 ton and up Each 15.00 107831.59 1617473.85
to 250 T capacity pile
8 022124 Extra for every increase of 50 ton in Each 24.00 5766.50 138396.00
pile capacity or part thereof over 250
capacity up to 100 ton capacity pile
Lateral load testing of single pile in
accordance with "IS Code of practice
IS:2911 (Part-IV) for determining safe
allowable lateral load of pile" with all
labour, material, tool & plants,
equipment, machinery, etc complete
as per drawing and specification as
directed by the Engineer.
10 022131 Piles with lateral load capacity of up Each 24.00 24337.71 584105.04
11 022132 Piles with lateral load capacity of Each 24.00 34092.66 818223.84
above 50 ton and up to 100 ton
batched, machine mixed and
machine vibrated Cement Concrete
of specified grade as per approved
Design Mix, mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants, (Cast in-
Situ/Pre-cast) in bottom/top slab, side
walls, toe wall and sumps haunch
filling head walls, thrust bed or any
other component using 20mm
graded crushed stone aggregate and
coarse sand of approved quality of
RCC box of any size including
finishing, Plasticiser in approved
proportions (as per IS:9103), to
modify workability without impairing
strength and durability, complete as
per drawings and technical
specifications as directed by
Engineer in charge. Note: 1. Payment
for cement, reinforcement and
shuttering shall be made extra under
relevant item. 2. Plasticiser shall
invariably be used in approved
proportion to increase workability
with minimum possible quantity of
cement for all grade of Design Mix
Concrete unless it is specifically
approved citing reasons at the stage
of Mix Design and in that case
deduction shall be made as per
Centering and shuttering including
strutting, propping etc. and removal
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
e.g. pier, abutment, wing wall,
retaining wall, RCC box type
foundations, Abutment cap, Pier Cap,
Inspection Platform & Pedestal over
Pier cap, Fender wall, Diaphragm wall
etc. up to 5m above ground level
Supply and using Cement at Worksite
of approved brands/makes
Supply of steel reinforcement of
approved brands/makes for R.C.C.
work including straightening, cutting,
bending, placing in position and
binding all complete.
15 025082 Thermo-Mechanically Treated bars of Kg 3582374.52 113.67 407208511.69
grade Fe-500D or more of approved
16 051020 Laying of boulder apron laid in wire cum 2200.00 743.37 1635414.00
crates of approved size including
overlaps at joints, laid with stone
boulders, all loose ends to be tied
with 4mm galvanised steel wire.
Payment for boulders & wire crates
to be done extra.
17 051030 Supplying of stone boulders weighing cum 2200.00 1770.51 3895122.00
not less than 35 kg each at specified
bridge locations.
Galvanized Wire Net Trungers made
from 4mm galvanised steel wire @
32 kg/10sqm having minimum
tensile strength of 300 Mpa
conforming to IS:280 and galvanizing
coating conforming to IS:4826,
woven into mesh with double twist,
mesh size not exceeding 100mm x
including consolidation, supply of all
materials, labour, lead, lift, tools,
plants, crossing of tracks as per
drawing and technical specification
as directed by the Engineer in charge
in case loose slush is encountered at
site of foundation before casting the
foundation or laying the filtering
20 052150 Providing and laying of filter media cum 1978.20 2807.07 5552945.87
consisting of granular materials of
GW, GP, SW groups as per IS:1498
(latest) in required profile behind
boulder filling of abutments, wing
walls / return walls etc. above bed
level with all labour and material
complete job as per drawing and
technical specification of RDSO
Annexure-II (Transportation of P-Way and other materials) and any other items of USSOR-2021
required for Successful completion of Work
S No. Item Description of Item Unit Qty Rate Amount
Loading of rails of any section and
length up to 1 3 metres in Wagons /
Truck / trailer including lead up to 50
metres and lift up to 5 metres.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
1 171014 In Wagon where mechanical handling MT 8400.00 172.62 1450008.00
is possible a n d traffic block is not
required or in Truck/trailer.
Loading of tongue rail, stock rail,
switch assembly and crossings of any
section and length, SEJ, Glued joint
etc. with / without P.Way fittings and
fastenings, in Wagon / Truck / trailer
including lead up to 250 metre and
lift up to 5 metre.
2 171024 In Wagon where mechanical handling MT 8400.00 167.61 1407924.00
is possible a n d traffic block is not
required or in Truck/trailer.
Loading, leading and unloading of
52Kg / 60Kg rail up to 13 metre
length by Railway's Rail Dolly / Dip
Lorry to the nominated location
under traffic with line protection in
case road carriage is not possible
with different lead with a lift up to 5
metre during block period.
beyond 1 Km for every subsequent
Km or part thereof and up to 10 Km
with contractor's Rail Dolly / Dip
Unloading of rails of any section and
length up to 13 metre, in neat
manner for Railway usage from
departmental material train (DMT) or
contractor's / Railway's Truck/trailer
including lead up to 50 metre, lift up
to 5 metre and stacking in prescribed
7 171051 From wagons during period of traffic MT 7991.06 198.68 1587663.80
block where handling by mechanical
means is not possible
handling is possible and traffic block
is not required or in Truck / trailer.
Unloading of all type of rails of length
130 metre and beyond from end
unloading rake and keep the panels
in head-up position at specified
distance from centre of track clear
from any infringement.. Note:
Contractor has to keep Oxygen and
Acetylene gas with cutter as standby
during the period of work.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Loading of 52kg / 60kg PSC normal
line and special sleepers up to 2.75
metre length in Depot / Station / Mid-
section between stations in a neat
manner to departmental material
train (DMT) or contractor's /
Railway's Truck/Trailer with crane or
any other means including crossing
of one track with free lead up to 250
metre and lift up to 5 metre, if
required with contractor's labour,
tools & plants, machinery,
consumables etc. Note: In case of
any damage to sleeper during
loading, penalty @ 50% of the all
inclusive cost of sleeper shall be
10 172014 In Wagon where mechanical handling MT 42441.50 138.10 5861171.15
is possible a n d traffic block is not
required or in Truck / trailer
Loading of 52kg / 60kg PSC line and
special sleepers beyond 2.75 metre
length including existing fittings and
fastenings in Depot / Station / Mid-
section between stations in a neat
manner to departmental material
train (DMT) or contractor's /
Railway's Truck/trailer with crane or
any other means including crossing
of one track with free lead up to 250
metre and lift up to 5 metre, if
required with contractor's labour,
tools & plants, machinery,
consumables etc. Note: In case of
any damage to sleeper during
loading, penalty @ 50% of the all
inclusive cost of sleeper shall be
mechanical handling is possible and
traffic block is not required.
Loading, leading and unloading of
PSC Sleepers of 52Kg / 60Kg by
Railway's Rail Dolly/ Dip Lorry to the
nominated location under traffic in
case road carriage is not possible for
different leads and lift up to 5
beyond 1 Km for every subsequent
Km or part thereof and up to 10 Km
with contractor's Rail Dolly/Dip Lorry.
Loading, leading and unloading of all
types of P.Way fittings and all other
miscellaneous material except Rails,
sleepers, switches, crossings, SEJs
and Glued Joints by road vehicles for
different leads. Note: Lead shall be
the shortest motorable road length
between the points of loading and
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Transportation of Rails, sleepers,
switches, crossings, SEJs and Glued
Joints by road vehicles for different
leads. Note: 1 . Lead shall be the
shortest motorable road length
between the points of loading and
unloading. 2. Loading and unloading
shall be paid extra under relevant
Unloading of 52kg / 60kg PSC line
and special sleepers up to 2.75 metre
length in Depot / Station / Mid-section
between stations in neat manner for
Railway usage from departmental
material train (DMT) or contractor's /
Railway's Truck/Trailer with crane or
any other means including crossing
of one track and lead up to 250
metre & lift up to 5 metre with
contractor's labour, tools & plants,
machinery, consumables etc. Note:
In case of any damage to sleeper
during loading, penalty @ 50% of the
all inclusive cost of sleeper shall be
Unloading of 52kg / 60kg PSC special
sleepers beyond 2.75 metre length in
Depot / Station / Mid-section between
stations in neat manner for Railway
usage from departmental material
train (DMT) or contractor's /
Railway's Truck/Trailer with crane or
any other means including crossing
of one track and lead up to 50 metre
& lift up to 5 metre with contractor's
labour, tools & plants, machinery,
consumables etc. Note: In case of
any damage to sleeper during
loading, penalty @ 50% of the all
inclusive cost of sleeper shall be
Unloading of Switches / Crossings /
SEJ Rails / Glued Joints of any rail
section and length with or without
P.Way fittings & fastenings in neat
manner for Railway usage from
departmental material train (DMT) or
contractor's / Railway's Truck/Trailer
with lead up to 250 metre & lift up to
Schedule Schedule G1A-Annexure-III : Execution of NS Items for Civil Works
Item- 1 Annexure-III NS Items for Civil Works
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
S No. Item Description of Item Unit Qty Rate Amount
Conducting pile/well integrity test
with cross hole (two diametrically
opposite longitudinal holes along the
pile staff) ultra sonic monitoring
(CHUM) method in Cast in situ
boared piles of by approved
specialized agencies having
necessary experience &
expertise.The rate shall include
hiring of Trained Professional &
equipment,on-site testing of
piles,transportation,analysis of data
recorded during test,preparation &
submission of report. The rate shall
include cost of
labour,consumables,transport,hiring
charges,taxes etc complete.
Schedule G1B-Annexure-IV, Annexure-V and Annexure-VI For Utility Shifting Works(Signalling,
Telecommunication and Civil)
Item- 1 Annexure-IV For Utility Shifting Works(Signalling)
S No. Item Description of Item Unit Qty Rate Amount
2 2 Termination of signalling cable/wire Each 3500.00 11.46 40110.00
3 3 Supply of a set of complete Earthing Set 9.00 58644.70 527802.30
and Bonding system as per RDSO
Specification No.
RDSO/SPN/197/2016 Ver.1.0 or latest
consisting of single earth pit, mainly
consisting of Copper bonded Steel
earth electrode of minimum 3.0
meter length, 17 mm diameter with
copper strip of 150 mm x 25 mm x 6
mm exothermically welded to earth
electrode as per drawing No.
SDO/RDSO/E&B/001 or latest, with
set of stainless steel nut & bolts for
earth cable connection and Earth
enhancement compound of RDSO
approved brand supplied in sealed
bag of minimum 10kg-3 Nos.
4 4 Supply of Power wire (Copper, Multi Kilometre 1.00 170311.99 170311.99
strand) PVC insulated unsheathed
single core bright annealed bare
copper conductor flexible cable for
voltage grade up to 1100V
conforming to IS 2465/1984 &
IS:694/1990 or latest - Size 16
5 5 Supply of Power wire (Copper, Multi Kilometre 1.00 128691.19 128691.19
strand) PVC insulated unsheathed
single core bright annealed bare
copper conductor flexible cable for
voltage grade up to 1100V
conforming to IS 2465/1984 &
IS:694/1990 or latest - Size 10
6 6 Supply of Power wire (Copper, Multi Kilometre 1.00 65488.09 65488.09
strand) PVC insulated unsheathed
single core bright annealed bare
copper conductor flexible cable for
voltage grade up to 1100V
conforming to IS 2465/1984 &
IS:694/1990 or latest - Size 6 Sq.mm
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
flexible single core indoor wire to
IRS:S-76/89, PVC coated in different
colours as per site requirement and
to be supplied in coils of 100 meters.
(Per Unit means Coil of 100 Mtr).
8 8 Supply of (NDT) Non Deteriorating Numbers 40.00 125.93 5037.20
type low voltage cylindrical head
cartridge fuse 2A along with base as
per Specification No IRS/S/78/92 with
latest amendments along with PPTC
terminal block 6 Way, PBT, as per
IRS:S-75/2006 Rev.2.0 and Drg.
No.SA-23756 or latest.
10 10 Supply of Disconnect Terminal block Numbers 5000.00 179.78 898900.00
for Four conductor with screw less
Cage Clamp type/sliding switch
disconnect as per RDSO Specification
No. RDSO/SPN/189/2004 version 1.2
or latest, for each conductor size up
to 2.5 sq. mm. Equivalent of M6
Terminals. Each Terminal block
equipped with two markers on top
and bottom, an end plate, 2 end
clamps & adequate length rails for
fitting terminal blocks.
11 11 Underground signalling cables to IRS Metre 10000.00 87.50 875000.00
spec. no S- 63/89: - 2 core x 25.
sq.mm.(Aluminium)
12 12 Underground signalling cables to IRS Metre 10000.00 90.49 904900.00
spec. no S- 63/89: - 2 core x 2.5.
13 13 Underground signalling cables to IRS Metre 50000.00 209.31 10465500.00
spec. no S- 63/89: - 12 core x 1.5
14 14 Underground signalling cables to IRS Kilometre 5.00 240711.00 1203555.00
spec. no S- 63/89: - 6 quad 0.9mm
telecom UG copper cable
15 15 Colour light signal complete with Numbers 20.00 29616.71 592334.20
post, ladder to drg.
no.SA23153(ADV)ALT-1, Base to
Drg.no.S/2011/M (IRS), protective
mesh, hood, lock and Signal
Maintenance Platform etc. but
without lamp, holder, lenses, CLS
transformer, Electric Lamp filament
Switching Unit for triple pole signal
lamp - With 3 aspect CLS unit to
RDSO Drg. no. SA-23002A/M(Adv)
FRP type without CLS transformer,
Lens, lamps , ELSUs etc.
16 16 Colour light signal complete with Numbers 25.00 24875.40 621885.00
post, ladder to drg.
no.SA23153(ADV)ALT-1, Base to
Drg.no.S/2011/M (IRS), protective
mesh, hood, lock and Signal
Maintenance Platform etc. but
without lamp, holder, lenses, CLS
transformer, Electric Lamp filament
Switching Unit for triple pole signal
lamp - With 2 aspect CLS unit to
RDSO Drg. no. SA-23002A/M(Adv)
FRP type without CLS transformer,
Lens, lamps , ELSUs etc.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
17 17 Supply of Colour light signal Numbers 2.00 25418.39 50836.78
complete as per TS (a)With 4 aspect
CLS unit FRP TYPE to RDSO Drg. no.
RDSO/SPN/194/2006 without CLS
transformers, lenses, lamps, lamp
holders and ELSUs.
18 18 Supply of FRP Route indicator Numbers 10.00 25638.80 256388.00
junction direction 5 Lamps type with
arm complete but without Lens &
Lamps as per RDSO specification No.
RDSO/SPN/194/2006. (a) 1 way route
19 19 Supply of FRP Direction type route Numbers 2.00 39048.71 78097.42
indicator, 2 way as per IRS: S-66/84
or latest to RDSO's Drg. No.SA-
23402(Adv) Alt-4, complete with
fixing arrangement, brackets, hoods
and terminals but without lamps,
lamp holders and lenses.
20 20 Supply of 4.6 mtr. Post with base, Numbers 15.00 13905.05 208575.75
ladder, ladder base, platform, Anchor
bolt with nuts & washers for CLS unit
to RDSO Drg. no. SA-23002A/M (Adv)
21 21 Supply of 3.6 mtr. Post with base, Numbers 15.00 12366.16 185492.40
ladder. Ladder base, platform,
Anchor bolt with nuts & washers for
CLS unit to RDSO Drg. no. SA-
23002A/M (Adv) without unit.
22 22 Supply of Shunt signal position light Numbers 8.00 15145.32 121162.56
type to Drg. No. SA-23840(Adv) Alt-2
for independent type complete with
signal unit, bracket, Post as per IRS-S
6 - 81 or latest having 4.5 mm
thickness & minimum 1m length,
surface base, terminals etc. but
without lenses, lamps and lamp
23 23 Supply of Shunt signal position light Numbers 10.00 8358.77 83587.70
type to Drg. No. SA-23840(Adv) Alt-2
for dependent type complete with
signal unit, bracket, terminals etc.
but without lenses, lamps and lamp
24 24 Supply of Offset bracket for colour Numbers 10.00 1471.77 14717.70
light signal with fixing U clamps &
nuts etc. (Main Signal)
25 25 Supply of Off set bracket for colour Numbers 16.00 1176.40 18822.40
light signal with fixing U clamps &
nuts etc. (Shunt /Co-On)
26 26 Calling-On signal unit FRP type - Numbers 6.00 9121.20 54727.20
complete with fixing clamps,
terminals etc - as per
RDSO/SPN/194/2006 or latest - but
without lamp, lamp holder and lens -
Fixing arrangement shall be as per
RDSO drawing SA-24352 (Adv) or
27 27 Apparatus case (Full) made of 10 Numbers 30.00 15124.58 453737.40
SWG sheets with miniature E -Type
Locks of same wards as that
available on existing location box of
station without keys as per spec. No
IRS S 30/64 & RDSO Drg. No. SA
3376 with latest amendments and as
per Technical Specifications..
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
28 28 Apparatus case half made of 10 SWG Numbers 4.00 5752.85 23011.40
as per Drg. No. N.E Rly SW/47/68
alongwith E type lock for ward
29 29 Supply of AC immunised plug in type Numbers 20.00 3510.50 70210.00
QNA1 DC neutral line relay,24V,8F.8B
30 30 Supply of AC immunised plug in type Numbers 20.00 2732.80 54656.00
QNA1 DC neutral line
relay,24V,12F.4B contact.
31 31 Supply of Relay, AC Immune, plug-in- Numbers 30.00 3953.34 118600.20
type, Style 'QTA-2'/QBAT, DC neutral
track, 9 Ohms, 2F-1B contacts, front
and back contacts metal to carbon,
complete with plug-board, retaining
clip and connectors conforming as
per BRS - 939 A, BRS: 966 , IRS:S:34
& IRS:S:23 or latest.
32 32 Relay, Point Contactor Unit, 24V DC, Numbers 10.00 30843.50 308435.00
plug-in type complete with base
plate as per spen no. IRS-S-46, IRS-
33 33 Supply and Installation of board for Square 200.00 594.55 118910.00
termination i.e Hylum Sheet of Foot
MINIMUM 10 mm thickness having
minimum grade P2 for main/tail cable
including supply of terminal board as
(Capacity 10 A) to work on 110 V AC
for charging 1/2/3/4 lead acid cell of
80 AH use in track circuit as per
IRS:S: 89/2013 Rev 1.0 or latest.
35 35 Supply of Low maintenance lead acid Numbers 90.00 2996.28 269665.20
stationary secondary cell as per
specification no. IRS:S-88/04 Rev.1 or
latest amendment, with hard rubber
container for use of Railway signaling
and Telecommunication application.
(i) 2 volt.80 AH
36 36 Supply of Track feed resistance as Numbers 30.00 632.71 18981.30
per SA 20166/M PBT base to Drg. No.
37 37 Supply of B type choke as per RDSO Numbers 60.00 4095.64 245738.40
specification No. IRS:S-65/83(Amendt
39 39 Channel bond pin single groove to Numbers 4000.00 2.73 10920.00
suit 9/32 inch hole
40 40 Supply of Track lead junction box FRP Numbers 100.00 3040.37 304037.00
type with mounting stump fitted with
2-way ARA terminal.
(RDSO/SPN/151/1997 or latest)
41 41 Universal AC Red main signal with Numbers 40.00 8752.06 350082.40
LED aspect, current regulator and
health monitor alarm unit.
42 42 Universal AC Yellow main signal with Numbers 40.00 8862.19 354487.60
LED aspect, current regulator and
health monitor alarm unit.
43 43 Universal AC Green main signal with Numbers 30.00 9819.57 294587.10
LED aspect, current regulator and
health monitor alarm unit.
44 44 LED Route Aspect with in-built Numbers 30.00 5606.18 168185.40
current regulator
45 45 LED Shunt Aspect with in-built Numbers 30.00 5966.87 179006.10
current regulator
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
46 46 LED Calling-on Aspect with in-built Numbers 6.00 7040.27 42241.62
current regulator
47 47 Electric point machine, 110v DC low Numbers 5.00 78641.62 393208.10
t h r u s t complete with cable
termination block, lock and detector
slides to IRS -S-24/2000.
48 48 Electric Point Machine - Clamp Type, Numbers 5.00 164436.97 822184.85
220mm throw, Clamp Point Lock for
60Kg Thick Web Switch with Rev. 2.0
as per IRS Spec No IRS:S:24/2002 or
latest and - to operate on 110V DC -
complete with lock and detector
slides - suitable for 25KV RE
complete set for 143 mm stroke,
Rotary Locking Point Machine,
suitable to the point layout of 60 Kg. /
52 Kg / 90R Rails as per yard layout
for BG/MG and for all make of the
Point Machines as specified by
Engineer-in-charge.
50 50 Ground connection Threaded Type - Set 5.00 5736.70 28683.50
suitable for Clamp type Point
Machine - complete set for 220 mm
stroke, Clamp Type Point Machine,
suitable to point layout of 60 Kg / 52
Kg Rail as per yard layout for BG - for
all make of Point Machines - as per
instructions of Engineer-in-charge
51 51 Supply of Points gauge tie plate Set 10.00 291.91 2919.10
insulation complete set as per CSTE's
Drg. No. SK/85/25 complete with nut
52 52 Supply of Point's William stretcher Set 10.00 88.06 880.60
bar insulation complete set as per
CSTE's Drg. No. SK/81/05 with latest
amendments complete with nut bolts
connection insulation complete set
including for D Bracket and "L"
bracket insulation as per IRS:S:40/84
54 54 POINT: Fixing of Electrical Point Numbers 10.00 9000.32 90003.20
Machine on the extended sleepers at
points as per std. practice with
contractor's long fixing bolts, nuts
and as per RDSO Drg No. SA 9151-52
or 9710 or 9161 as per section of
rails used, fixing ground connections
& insulations, wiring inside the point
machine with contractor's wiring
material, supply and fixing of GI
pipes (Gland pipe) with flange for
taking cable into point machine,
termination of tail cable in point
machine and junction boxes,
adjusting opening of the switches
and adjusting the point machine with
crank handle including all smithy &
fitting works required at site for
complete installation and fitting
insulation for Gauge Tie Plate &
William Stretcher Bar etc., the
complete work of Electric point
machine Installation as per Technical
specifications.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
55 55 Supply of G.I. pipe with thread collars Metre 162.00 759.63 123060.06
of 100mm nominal bore,
specification No.IS-1239 medium
grade ,to be perforated after supply
for required length as per technical
corrugated(DWC)
electrex/telerex/optirex or similar as
per IS 14930 part II and technical
specifications, along with
socket/coupler and T joints wherever
required, for underground
power/signalling/telecommunication
cable protection. - HDPE/DWC pipe,
outer dia200mm/inner dia174mm
corrugated(DWC)
electrex/telerex/optirex or similar as
per IS 14930 part II and technical
specifications, along with
socket/coupler and T joints wherever
required, for underground
power/signalling/telecommunication
cable protection. - HDPE/DWC pipe,
outer dia90mm/inner dia76mm
58 58 Fitting and Fixing of ARA Battery Numbers 34.00 1516.74 51569.16
Terminal on standard size Hylam
sheet as approved by Engineer In-
charge. Supply of ARA Terminal is not
included in this item. The Battery
terminal must be terminated with
suitable lug on ARA Terminal. (unit
Number denotes for 01 station.)
59 59 Excavation, ramming, Casting Numbers 42.00 8370.04 351541.68
Cement Concrete foundation for
Colour Light Main Signal Post in the
ratio of 1:3:6 Aggregate not
exceeding 3 : 8 cum, as per Drg. No.
CSTE/CON/SK/05/99 and technical
specifications using standard size
galvanized Anchor bolts & nuts (also
referred to as foundation bolts)
conforming to IRS Drg. No. SA-
116A/M, for erection of colour light
signal post, plastering with 1 : 4
cement - sand mixture all the
surfaces up to 75 mm below ground
level, complete with contractor's
material including cement, sand,
aggregate, anchor bolts and nuts
and curing of casted foundation,
refilling & ramming of loose soil
around foundation and disposal of
loose dug soil from site.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
60 60 Assembling, erection, installation, Numbers 24.00 7996.17 191908.08
taking of cable inside unit through
post, termination and wiring of
CLS(Colour light Signal) complete
with all accessories of CLS unit, post,
base, ladder, ladder guards, platform
and MS supporting bracket in the
middle of the ladder, hoods,
pinnacles, offset brackets,
Junction/stencil type route indicators
(if any) - 1 way to 6 way, etc.
including fixing & wiring of LED units
lamps with contractor's wiring
material. Note-Anchor bolt with nuts
& washers are supplied by the
contractor. - For 2 Aspect CLS
61 61 Assembling, erection, installation, Numbers 16.00 8003.09 128049.44
taking of cable inside unit through
post, termination and wiring of
CLS(Colour light Signal) complete
with all accessories of CLS unit, post,
base, ladder, ladder guards, platform
and MS supporting bracket in the
middle of the ladder, hoods,
pinnacles, offset brackets,
Junction/stencil type route indicators
(if any) - 1 way to 6 way, etc.
including fixing & wiring of LED units
lamps with contractor's wiring
material. Note-Anchor bolt with nuts
& washers are supplied by the
contractor. - For 3 Aspect CLS
62 62 Assembling, erection, installation, Numbers 16.00 10894.30 174308.80
taking of cable inside unit through
post, termination and wiring of
CLS(Colour light Signal) complete
with all accessories of CLS unit, post,
base, ladder, ladder guards, platform
and MS supporting bracket in the
middle of the ladder, hoods,
pinnacles, offset brackets,
Junction/stencil type route indicators
(if any) - 1 way to 6 way, etc.
including fixing & wiring of LED units
lamps with contractor's wiring
material. Note-Anchor bolt with nuts
& washers are supplied by the
contractor. - For 2/3/4 Aspect CLS
with 1/2/3/4 way route indicator
(Junction type/Stencil type)
63 63 Assembling, erection, installation, Numbers 16.00 3274.32 52389.12
taking of cable inside unit through
post, termination and wiring of
CLS(Colour light Signal) complete
with all accessories of CLS unit, post,
base, ladder, ladder guards, platform
and MS supporting bracket in the
middle of the ladder, hoods,
pinnacles, offset brackets,
Junction/stencil type route indicators
(if any) - 1 way to 6 way, etc.
including fixing & wiring of LED units
lamps with contractor's wiring
material. Note-Anchor bolt with nuts
& washers are supplied by the
contractor. - For calling-on signal
below main home signal complete
with all fittings.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
64 64 Assembling, erection, installation, Numbers 16.00 2074.12 33185.92
taking of cable inside unit through
post, termination and wiring of
CLS(Colour light Signal) complete
with all accessories of CLS unit, post,
base, ladder, ladder guards, platform
and MS supporting bracket in the
middle of the ladder, hoods,
pinnacles, offset brackets,
Junction/stencil type route indicators
(if any) - 1 way to 6 way, etc.
including fixing & wiring of LED units
lamps with contractor's wiring
material. Note-Anchor bolt with nuts
& washers are supplied by the
contractor. - For dependent shunt
65 65 Installation of Earth electrode for Numbers 80.00 1808.26 144660.80
outdoor equipment as per technical
specifications. Note:- Installation of
earth electrode includes the
construction of the surrounding earth
pit using contractor's own material.
66 66 Installation of complete earthing and Job 9.00 8146.65 73319.85
Bonding System as per RDSO
specification RDSO/SPN/197/2016
Ver.1.0 or latest for BPAC/Signalling
equipment, to construct earthing as
per standard code of practice
including auguring hole of 100-125
mm dia and minimum 2.8 meter
depth for earth electrode , carring
out necessary digging work and to
make 300X300X300 mm (inside
dimensions) concrete box with lid
approx.50 mm thickness and painted
black on top, with contractor's
material, fixing earth electrode in the
augured hole, filling Earth
enhancement material around earth
electrode in the hole in slurry form
and allowing to set, back filling of
excavated soil after sieving,
measurement of earth value,
carrying out interconnection between
unit earths installed as per
requirement of site and all other
work of earthing as per standard
code of practice and connecting it to
equipments to be earthed,
construction of surrounding earth-pit,
etc. as per site requirements and
Technical specifications (At Location
hut).The installation is to be done
OEM or its Authorised representative
only. If required by Engineer In-
charge, necessary certificate from
OEM to be given.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
67 67 Excavation, ramming, Casting Numbers 80.00 2013.21 161056.80
Cement Concrete foundation for
Junction box in the ratio of 1:3:6
Aggregate not exceeding 3 : 8 cum, ,
plastering with 1 : 4 cement - sand
mixture all the surfaces up to 75 mm
below ground level, complete with
contractor's material including
cement, sand, stones, anchor bolts
and nuts and curing of casted
foundation, refilling & ramming of
loose soil around foundation and
disposal of loose dug soil from site.
Junction box 12/24 way
68 68 Installation of Junction box on CC Numbers 80.00 217.16 17372.80
foundation on grouted bolts,
including filling the space enclosed
below the location box with
contractor's sand. Junction box 12/24
69 69 Excavation, ramming, Casting Numbers 40.00 7641.14 305645.60
Cement Concrete foundation for
Apparatus cases/Location boxes in
the ratio of 1:3:6 Aggregate not
exceeding 3 : 8 cum, as per Drg. No.-
LB1-LD-TYP-NR No.MT/L-45 SH
No.LB1 (for Apparatus Case full size)
and Drg.No.-LB2-LD-TYP-NR No.MT/L-
45 SH No.LB2 (for Apparatus Case
half size) using standard size
galvanized Anchor bolts & nuts (also
referred to as foundation bolts)
conforming to IRS Drg. No. SA-
116A/M, for erection of Apparatus
cases/Location boxes, plastering with
1 : 4 cement - sand mixture all the
surfaces up to 75 mm below ground
level, complete with contractor's
material including cement, sand,
stones, anchor bolts and nuts and
curing of casted foundation, refilling
& ramming of loose soil around
foundation and disposal of loose dug
soil from site. - Apparatus case (Full)
cases/Location Boxes on CC
foundation on grouted bolts,
including filling the space enclosed
below the location box with
contractor's sand, as per technical
specifications. - Apparatus case (Full)
71 71 Installation, fixing and wiring of DC Per Unit 80.00 5970.98 477678.40
track circuits equipments, track
battery charger, resistances/chokes,
track relays, batteries etc. in
apparatus cases, location huts, relay
rooms etc. including wiring and
extension of potential free contact of
track battery charger to ASM room,
with contractor's wiring material,
termination of tail cables on
terminals/fuse blocks, supply and
making track circuit history cards, all
activities as per standard practice
and technical specifications.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
72 72 Installation and commissioning of DC Per Unit 32.00 8384.31 268297.92
track circuits including fixing of
double bonds using G.I. wire, fixing of
exothermic continuity bonds on rail
joints & making rail connections of
lead wires, installation & fixing of
track lead junction box on MS angle
for track feed end, track relay end
and BX Jumpers, connections to tail
cable, termination of tail cables on
TLJB terminals etc., insertion of
insulated block joints and also fixing
jumper cables as per insulation
diagram/track bonding plan, charging
& adjustment of track circuit, all
activities suitable for RE as per
standard practice and technical
specifications. - Track circuits not
involving point zone
73 73 Installation and commissioning of DC Per Unit 48.00 10509.96 504478.08
track circuits including fixing of
double bonds using G.I. wire, fixing of
exothermic continuity bonds on rail
joints & making rail connections of
lead wires, installation & fixing of
track lead junction box on MS angle
for track feed end, track relay end
and BX Jumpers, connections to tail
cable, termination of tail cables on
TLJB terminals etc., insertion of
insulated block joints and also fixing
jumper cables as per insulation
diagram/track bonding plan, charging
& adjustment of track circuit, all
activities suitable for RE as per
standard practice and technical
specifications. - Point zone track
Meter wide trenches including
clearing of roots of trees and bushes
and temporary obstruction on the
selected route and back filling &
restoration of the disturbed soil as
per technical specifications and cable
route plan (a) In all type of soils
including soft rock
75 75 Excavation by Machine (JCB) for Metre 900.00 92.18 82962.00
cable trenches in normal soil, depth
up to 1.0 Mtr and width 0.3 Mtr,
including getting out the excavated
76 76 All works of excavation of cable Metre 270.00 878.52 237200.40
trench 1.0 Meter deep, 0.3 Meter
wide on pucca platform/on Road for
road crossing and restoration of the
platform/Road surface to original
condition with contractor's material,
after laying of GI/DWC pipes and then
re-filling the trench as per Technical
Specifications.
77 77 Back filling of cable trench after Metre 900.00 2.75 2475.00
laying of cables and then complete
back filling & ramming of loose soil
as per the technical specifications.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
78 78 Laying of Signal Cable of different Kilometre 36.00 5266.65 189599.40
sizes as per cable route plan in the
already dug trench with or without
DWC pipe / in G.I. pipes of bridges,
culverts and tunnels etc / in Cable
tray's of tunnels (Laying of DWC Pipe,
G.I. pipe, Cable trays are not included
in this item) - 2 Core to 12 core
signalling cable
79 79 Laying of Signal Cable of different Kilometre 9.00 5088.83 45799.47
sizes as per cable route plan in the
already dug trench with or without
DWC pipe / in G.I. pipes of bridges,
culverts and tunnels etc / in Cable
tray's of tunnels (Laying of DWC Pipe,
G.I. pipe, Cable trays are not included
in this item) - Power cable
80 80 Laying of Signal Cable of different Kilometre 4.50 5267.77 23704.97
sizes as per cable route plan in the
already dug trench with or without
DWC pipe / in G.I. pipes of bridges,
culverts and tunnels etc / in Cable
tray's of tunnels (Laying of DWC Pipe,
G.I. pipe, Cable trays are not included
in this item) - Quad Cable Laying
81 81 Cutting of DWC pipe, of various size, Metre 4500.00 45.04 202680.00
into 2 No of split DWC pipe - includes
transportation and loading /
unloading (to/from BPG store or any
other location advised by Engineer-
82 82 Placing of half round ( Split DWC ) Kilometre 9.00 38343.52 345091.68
pipe over the laid cable in open
83 83 Protection of under ground cable by Metre 270.00 366.86 99052.20
provision of concrete layer in the
ratio 1:2:4 having minimum
thickness 100 mm and minimum
width of 200 mm.
miscellaneous items in the ratio 1 : 3
: 6, aggregate not exceeding 3 : 8
cum including excavation, ramming,
curing and plastering with 1 : 4
cement - sand mixture complete with
contractor's material including
cement, sand, aggregate and curing
of casted foundation, refilling &
ramming of loose soil around
foundation and disposal of loose dug
soil from site. NOTE: Due to local
condition in very special
circumstances if the size of the
foundation for all the above items is
required to be increased/decreased,
the extra payment /deduction for
variation of the CC work shall be
calculated on volumetric basis as per
rate of this item.
85 85 Fixing of G.I. pipe/DWC pipes of all Metre 162.00 191.15 30966.30
sizes & diameters troughing on
culverts, bridges & any other location
etc. complete with contractor's
material including clamps, nuts and
bolts and other fixing arrangements
as directed by Engineer in charge.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
86 86 Laying of Double Wall Corrugated Metre 270.00 66.78 18030.60
(DWC) pipe with socket, coupler and
T Joint etc. by digging of trench 0.3
Meter width, 1.2 Meter depth from
rail flange under track for track
crossing and refilling after laying of
pipes, as per technical specifications
Item- 2 Annexure-V For Utility Shifting Works(Telecommunication)
S No. Item Description of Item Unit Qty Rate Amount
Cable as per RDSO specification.
2 2 Laying of 6-quad cable / PIJF cable as Metre 20000.00 2.80 56000.00
per procedure given under technical
specification in tender document.
3 3 Supply of Thermo shrink Jointing Kit Numbers 60.00 2337.96 140277.60
for 6 - QUAD jelly filled cable as per
spec. no.IRS:TC-77-2012 , Rev.3 (
Amendment- 3 or latest ) for Straight
through joints & derivation 2T joints
and supply the Kit as per dia of
conductor supplied by Railway.
4 4 Installation of Thermo shrink Jointing Numbers 30.00 1393.59 41807.70
kit for 6 quad cable as per DOT/TEC
Specification with RDSO Modification
for straight through joints as per
technical specification & site
condition. Straight through thermo
shrink jointing kit as per quantity
mentioned in the schedule will be
supplied by Railway.
5 5 Provision of derivation joint at Numbers 30.00 2102.19 63065.70
approx. every KM for emergency
socket and LC gates from 6 Quad
cable using PIJF cable with the help of
thermoshrinking jointing kits and 2T
VF transformer.
6 6 Supply of 6 pin Emergency plug and Numbers 30.00 171.45 5143.50
socket as per Spec. No.IRS-TC-42/87
with Amendment- 3 or latest.
socket box as per RDSO Spec. No.
RDSO/SPN/TC/44/2002 Ver-2, Amd-3
or latest and Drawing
No.TCDO/RE/001/2002, Ver.0.1b&
TCDO/RE/001/2002/1.
socket posts, transportation to site,
digging of pit and erection of
emergency post complete with
socket and socket boxes as per
specification and drawings, wiring,
testing and commissioning of the
emergency socket along side the
Railway track at locations indicated
by site Engineer. The work shall be
carried out as per Technical
Specifications. and Size and shape as
per drawing in Annexure - A Supply
of Emergency socket and socket
boxes is provisioned elsewhere in
transformer, impedance ratio
1120:470 as per specification No.
IRS: TC - 76-2000,Amndt. 1 or Latest.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
10 10 Supply of straight through jointing kit Numbers 10.00 573.94 5739.40
(TSF-1) for 20 pair armourded PIJF
cable, 0.5 mm dia as per spec. no.
RDSO/SPN/TC/57/2006(Rev.0) Amdt.-
11 11 Cable Fibre Optic Armoured (48 Kilometre 20.00 114292.83 2285856.60
Fibres) as per
RDSO/SPN/TC/110/2020 Rev.0
12 12 Supply of Optical fibre joint enclosure Numbers 80.00 2903.62 232289.60
as per RDSO Spec
No.RDSO/SPN/TC/68/2014 REV 1.0
with Amendment No. 2.0 or latest for
24 fibre armoured Optical Fibre Cable
with all accessories and consumable.
13 13 Installation of OFC Joint enclosure Numbers 80.00 3839.73 307178.40
and splicing of Optic fibre cable (24
fibres/ 12Fiber/6 Fiber) as per
technical specification. However for
any additional joint due to bad
workmanship/ damage due to
contractors faults, OFC joint closures
from RDSO approved sources will be
supplied by the contractor and
installed free of cost).
14 14 Erection of RCC pit 1 Meter below the Numbers 40.00 3717.76 148710.40
earth surface with arrangement for
entry and exit for HDPE pipe as per
Drg. NF/TC/99-25. The pit shall be
covered by suitable RCC covering
slab. After laying of cable the RCC pit
shall be filled with sand and covered
with the covering slab and finally to
be covered by loose soil upto earth
surface level with proper ramming.
Height of the round RCC pit shall be
450 mm high, dia 1200 mm .This
includes provision of PIT with 2 part
cover 75 mm thick with anchor and
all required materials.
15 15 Supply ,transportation to site, Numbers 40.00 349.63 13985.20
erection and concreting the base of
RCC OFC joint markers at the location
16 16 LAYING: Pulling of OFC with Nylon Metre 20000.00 5.66 113200.00
rope through HDPE pipes & GI pipes
of size 50/42mm or 40/33 mm dia for
48/24/12/6 fibre armoured OFC cable
in Normal Trench as per technical
specification detailed in tender
document. ( Normal trenching)
17 17 TERMINATION: Supply of modular Numbers 10.00 18768.52 187685.20
Line Inter face Unit (LIU)of 12/24/48
fiber including all accessories ,
Termination of 24/48 port should be
available on LIU . Make:
LEGRAND/Siystimax/Siemon or
s i m i l a r. LIU should consists of
following accessories- 1. 3 Duplex
Adapter of APC, UPC, SC, and LC
Connector = one number each=4
numbers 2. Pigtail- 1mtr. of LC-
APC(12 numbers), LC- UPC( 6
numbers), SC- APC(6 numbers)=24
Numbers 3. Splice Tray- 1 Number
Note: (1) Manufacturer
Authentication Certificate has to be
given during supply of the material.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
laying of OFC and quad (through
HDPE pipe) cable.
19 19 Excavation of trenches up to a depth Metre 1000.00 195.98 195980.00
of 1 Metre at Kutcha road/under low
flooded bridges/Culverts/low lying
areas and placing of DWC HDPE
pipes with sockets and back filling
and ramming of the soil to original
20 20 Excavation of Pucca roads up to a Metre 1000.00 603.89 603890.00
depth of 1 Metre and placing of DWC
HDPE pipe and refilling with earth
and ramming,levelling and repairing
of the road to original condition.
21 21 Excavation - Track crossing of cables, Metre 1000.00 399.41 399410.00
laying of DWC/ RCC pipes with
collar/coupling - of trench to a depth
of 1.0 Mtr. refilling of trench by
ramming and consolidating it as per
the instructions of Railway
representative at site. During
excavation of trench it has to be
ensured that the excavated soil does
not mix with the ballast available.
The depth of 1.0 m trench shall be
from the bottom of sleepers for track
crossings. Laying of cables is not
included in this schedule.(Supply of
DWC/RCC pipes with couplers/ collars
is not included in this schedule).
22 22 Fixing of G.I. pipe/DWC pipes of all Metre 1000.00 245.01 245010.00
sizes & diameters troughing on
culverts, bridges & any other loc. Etc
complete with contractor's material
including clamps, nuts and bolts and
other fixing arrangements as directed
by Engineer in charge. (Including
23 23 Transportation of HDT machine with Metre 2000.00 1215.64 2431280.00
accessories including handling of
stores materials, preparation of site
and boring for placing of 50/42 mm &
40/33 mm dia HDPE pipe for crossing
of OFC cable together in one or more
shot of suitable bore size at bridges /
culverts / track / pucca road crossing.
Boring trench shall be minimum 3
(three) meter below the river bed
and 1 (one) meter below the track /
road / pucca road crossing area. This
includes supply of accessories for
pulling HDPE pipes if any, cost of fuel
and all other items which will be
required for laying of cable through
it. HDPE pipe will be supplied by
Railway. The work shall be executed
as per technical specification.(a)
Boring up to the length of 150 Mtrs.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
24 24 Excavation by Machine (JCB) for Metre 10000.00 77.80 778000.00
cable trenches in all types of soils
including cutting and clearing of
bushes and roots of trees etc., upto a
depth of 1.2 Mtrs and width of 0.3
Mtrs at the bottom in the entire
section, back filling and ramming of
the soil in trenches to original level.
The work shall be executed as per
technical specification. NOTE:
Proportionate payment against the
work executed by the contractor will
be arranged where digging of trench
upto 1.2 mtr depth is not possible
due to water seepage inside the
trench, this has to be confirmed by
the railway representative present at
site and should be recorded in the
25 25 Excavation - In Hard soils including Metre 1000.00 529.17 529170.00
hard rock and soil mixed with
ballast/Stone/Bricks - of 1.0 Meter
deep and 0.3 Meter wide trenches
including clearing of roots of trees
and bushes and temporary
obstruction on the selected route, as
per technical specifications and cable
route plan , including back filling and
ramming of the soil in trenches to
original level.Note-In case where
digging of trench up to 1.0 Meter
depth and 0.3 meter wide is not
possible or bigger size trench is
required to lay more cables or loose
soil/muck is encountered, the depth
can be reduced /increased as per
directions of the Engineer-in-charge
of the works, the payment will be
decreased/increased proportionate to
the depth & width of excavation
compared to 1.0 Meter deep and 0.3
26 26 Excavation - In Rocky area -of trench Metre 1000.00 1212.90 1212900.00
including cutting and clearing of
bushes and roots etc up to a depth of
atleast 1meter but where excavation
of cable trenchup to required depth
of 1 meter is not possible due to site
condition but depth of0.3 meter is
achievable then depth of 0.3 meter,
width of 0.2 meter at the bottom in
the entire section and placing of 100
mm nominal dia RCC pipe by 1:2:4
masonary work upto a layer of 75
mm (approx) and refilling the trench
as per instruction from
representative of site Engineer In-
charge. Then backfilling the trench
and ramming the soil after cable
laying. All materiaLs like RCC pipe,
cement, masonry materials are to be
supplied by the Contractor. Cables
hould be protected so that it can not
be extracted from any end.
dia nominal - along with sockct - as
pcr tcchnical spccification and is
approvcd by Engineer In Charge.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
28 28 Supply of Permanently lubricated Kilometre 40.00 50989.33 2039573.20
HDPE Pipe of size 40/33 mm (PLB
HDPE) (Nominal) along with sockets,
RDSO/SPN/TC/45/2013 Rev.2.0
(Amdt.2) or latest from the TEC
approved firms suitable for HDD
(Horizontal Directional Drilling).
29 29 Supply of permanently lubricated Kilometre 1.00 224686.92 224686.92
HDPE pipe of size 63mm dia (Outer
Dia) as per Specification No:
RDSO/SPN/TC/45/2013 Rev.2.0 or
latest from the TEC approved firms
suitable for HDD.
or 50/42mm of OFC cable as per TS (
Normal trenching)
31 31 LAYING: Pulling of OFC with Nylon Metre 2000.00 5.91 11820.00
rope through HDPE pipes & GI pipes
of size 50/42mm or 40/33 mm dia for
48/24/12/6 fibre armoured OFC cable
in Normal Trench as per technical
specification detailed in tender
document. ( Normal trenching)
32 32 Supply of G.I. pipe with thread collars Metre 500.00 711.67 355835.00
of 100mm nominal bore,
specification No.IS-1239 medium
grade, to be perforated after supply
for required length-as per technical
33 33 Supply and Fixing of GI pipe medium Numbers 10.00 828.79 8287.90
grade to carry all the cables with
fixing materials and making
necessary entry arrangement, at LC
Gates, Cable Huts, OFC Room , ASM
Room, D Class station and other
building as per site condition if
required as per T.S. using 80mm dia
G.I. pipe . Note: All the materials e.g.
G.I. Pipes, Clamps, PVC pipe, flexible
PVC pipes, masonry materials, nuts &
bolts are to be supplied by the
34 34 Pulling of Quad Cable with Nylon rope Metre 1000.00 6.90 6900.00
through 63/50 mm HDPE pipes (used
in HDD boring) & backfilling of boring
Pit for HDD work.
35 35 Pulling of OFC Cable with Nylon rope Metre 2000.00 5.53 11060.00
through 40/33 mm or 50/42 mm
HDPE pipes & backfilling of boring Pit
for HDD (Horizontal Directional
Drilling)/different types of trenching
36 36 Protection of under ground cable by Metre 500.00 245.01 122505.00
provision of concrete layer in the
ratio 1:2:4 having minimum
thickness 100 mm and minimum
width of 200 mm.
pair C.T. Box Krone type and
termination of PIJF cable in ASM
Room, OFC room, Cable Huts and
other buildings if required, as per
details given in wiring and jointing
schedule approved by the Engineer.
Item- 3 Annexure-VI For Utility Shifting Works(Civil)
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
S No. Item Description of Item Unit Qty Rate Amount
Schedule Schedule G1C-For Unforeseen Works
Item- 1 For Unforeseen Civil Works
S No. Item Description of Item Unit Qty Rate Amount
Item- 2 For Unforeseen Signal and Telecommunication Work
S No. Item Description of Item Unit Qty Rate Amount
1 1 For Signal and telecommunication Lumpsum 1.00 11584117.15 11584117.15
Item- 3 For Unforeseen Electrical Work
S No. Item Description of Item Unit Qty Rate Amount
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
prebid.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .