Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-Finance | ₹8.2 L | L1 | Accepted-Finance Lowest first |
Tender Value
₹8.3 L
EMD Value
₹8,331
Closing Date
14 May 2026, 5:00 pmClosed
Chief Executive Officer
Z P Satara
Constructing Liquid Waste Management Project at Apshinge Tal Satara Dist Satara
2026_SATAR_1299758_1
ZPS/RWS/SLW/2026 -2nd call
Open Tender
Solid Waste Management
Percentage
365 days
Apshinge
As Per Tender Notice
4 documents required · 4 mandatory
₹500
₹8,331
17 Jul 2026
2 May 2026
15 May 2026
2 May 2026
14 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub Work 1 : Compost Tank for Solid Item No.1 :-Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 m beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc.complete (MLP DSR 2021-22) Item No.-2 Page -12+10% Hilley Area Charges | - | Cu.m | 187 | - |
| 2 | Item No.2 :- Providing and laying in situ cement concrete in M-15/1:2:4 of trap/ granite/quartzite /gneiss metal for bed blocks, foundation blocks and such other item including bailing out water formwork, compacting, roughening them if special finish to be provided and curing and finishing if required complete. MJP DSR 2021-22) Item No.L/B Page -19+10% Hilley Area Charges | 6.27 | Cu.m | 6,824 | ₹42,786.48 |
| 3 | Item No.3:- Providing Second class Burnt Brick masonry with convenitional / I.S type bricks in cement mortar 1.6 in foundationa and plinth of inner walls/in plinth external walls including bailing out water meanually, striking on unexposed faces, raking out joints on exposed facesand watering etc complete (PWD SSR 2021-22) Item No.27.01 Page 144 + 10% Hilley Area Charges | 0.82 | Cum | 8,530 | ₹6,960.48 |
| 4 | Item No.4:- Providing sand faced plaster externally in CM using sand in all positions including bas ecoat of 12 mm thick in CM 1:4 using water proofing compund at 1kg / Cement bag curing the same for not less than 3 days and keeping the surface of the base coat rough to receive the sand faced treatement 6-8 mm thick in CM 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc Complete. (PWD SSR 2021-22 ) Item-32 11 Pae 153 + 10% Hilley Area Charges | 69.42 | Cum | 631.4 | ₹43,831.79 |
| 6 | Sub Work 2 :- Sagregation Pit Item No.1:- Excavation for foundation in Hard murum, including removing the excavated material upto a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc.complete. (MJP DSR 2021-22) Item No.1/B Page -49+10% Hilley Area Charges | 7.9 | Cum | 187 | ₹1,477.3 |
| 7 | Item No.2 Providing and laying in situ, cement concrete in M 1.5/1:2:4 of trap/granite/quartzite/gneiss metal for bed blocks and such other item including bailing out water formwork, compacting and roughening them if special finish to be provided and curing, finishing, if required complete.
MJP-DSR-2021-22 Item No.1/B Page -49+10% Hilley Area Charges | 2.19 | Cum | 6,824.4 | ₹14,945.44 |
| 8 | Item No.3 :- Providing Second Class Burnt Brick masonry with conventional / I.S. type bricks in cement mortar 1.6 in plinth of inner wallas/in plinth external walls including bailing out water manually, striking joints, on unexposed faces, raking out joints on exposed facesand watering etc Complete
PWD-SSR 2021-22 Item No - 27.01 Page-167+10% Hilley Area Charges | 5.38 | Cum | 8,530.5 | ₹45,894.09 |
| 9 | Item No.4 :-Providing sand faced plaster externally in CM using sand in all positions including bas ecoat of 12 mm thick in CM 1:4 using water proofing compound at 1 kg/cement bag curing the same for not less than 3 days and keeping the surface of the base coat rough to receive the sand faced treatment 6-8 mm thick in CM 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc. complete.
(PWD SSR 2021-22) Item No-32 Page-177+10% Hilley Area Charges | 12.45 | Cum | 631.4 | ₹7,860.93 |
| 10 | Sub Work 3.:- Plastic waster Storage Unit Item No 1 :- Excavation for foundation / pipe trenches in earth, soils of all types, sand gravel and soft murum, incluing removing the excavated material upto a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc. complete (Bd-A-1/259) Lift 0 to 1.5 M (MJP CSR 2021-22 P.NO.42, I No.1 | 4.5 | Cum | 165 | ₹742.5 |
| 11 | Filling in Plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc complete. (Bd-A-10/263) MJP CSR 2021-22 P.No.45, I No.16 | - | Cum | 92.4 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
B1.pdf
Other Document • 2.99 MB
BOQ_2232022.xls
BOQ • 0.35 MB
Nit.pdf
Tender Documents • 1.08 MB
Corri.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .