Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC CHENGALPATTU TAMIL NADU | CHENGALPATTU | TAMIL NADU | 600043 | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 Cr+₹2.3 L (0.98%)Rejected-Finance 2 M S CHIDAMBARAM 608001 | CUDDALORE | TAMIL NADU | 608001 | ₹2.4 Cr+₹2.3 L (0.98%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | mani and co L2 | S SABANAYAGAM AND CO L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Eyyalore to Sirukattur road KM-0/0-3/750 (R-468)at Kattumannarkoil Block | |||||
| 2.00 | Clearing and scrub/ light jungle by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth | 4,480.8 | Sqm | 6 ₹26,884.8 Lowest | 6 ₹26,884.8 Lowest |
| 3.00 | Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification. | 4,672.5 | Sqm | 23 ₹1,07,467.5 Lowest | 23 ₹1,07,467.5 Lowest |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out | 3,027.78 | cum | 141 ₹4,26,916.98 | 140 ₹4,23,889.2 Lowest |
| 5.00 | Providing US Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc Km 0/0-1/0 | 280.41 | cum | 729 ₹2,04,418.89 | 722 ₹2,02,456.02 Lowest |
| 6.00 | KM-1/0-2/0 | 281.25 | cum | 739 ₹2,07,843.75 | 732 ₹2,05,875 Lowest |
| 7.00 | KM-2/0-3/0 | 280.41 | cum | 749 ₹2,10,027.09 | 742 ₹2,08,064.22 Lowest |
| 8.00 | KM-3/0-3/75 | 209.25 | cum | 760 ₹1,59,030 | 752 ₹1,57,356 Lowest |
| 9.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,752.17 | cum | 3,451 ₹60,46,738.67 | 3,417 ₹59,87,164.89 Lowest |
| 10.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 14,017.5 | Sqm | 86 ₹12,05,505 | 85 ₹11,91,487.5 Lowest |
Tender Value
₹2.4 Cr
EMD Value
₹2.4 L
Closing Date
22 Dec 2025, 3:00 pmClosed
Additional Collector(D)
DRDA, Cuddalore
Strengthening of Eyyalore to Sirukattur road
2025_RDTN_631977_10
A10/6527/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per tender document
3 documents required · 3 mandatory
₹0
₹2.4 L
Yes
8 Apr 2026
16 Dec 2025
22 Dec 2025
16 Dec 2025
22 Dec 2025
16 Dec 2025
Strengthening of Eyyalore to Sirukattur road KM-0/0-3/750 (R-468)at Kattumannarkoil Block
Clearing and scrub/ light jungle by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth
Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing US Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc Km 0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. Using Waste plastic
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for , Hm stone,
Provision for , KM stone,
Provision for Road Marker/Road Stud With lensReflector
Provision for 60cm Equilateral Triangle Cautionary Sign Board
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
techsummary_757337.pdf
finance_757337.pdf
BOQ Comparative Chart
xlsx
finsummary_757337.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_757337.xls
BOQ • 0.24 MB
TechnicalBid1.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .