Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance NO 150 ASHOK STREET UDAYAMPALAYAM COIMBATORE 641045 | COIMBATORE | TAMIL NADU | 641045 | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
3 Jan 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assisstant Commissioner
Coimbatore Corporation, Central zone, Hosur road, Coimbatore.641018.
MR to the Storm water drain and providing RCC Covering slab at Sundaram street in ward 47.
2023_MAWS_403691_11
e9/2023/CZ
Open Tender
Civil Works
Works
90 days
Central zone
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
Yes
3 Jan 2024
27 Dec 2023
3 Jan 2024
27 Dec 2023
3 Jan 2024
27 Dec 2023
Amount
1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges
2. Desilting in the existing drain as per the direction of departmental officers etc. completed.
3. Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges
4. Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge.
5. Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
6. Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed.
7. Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed.
9.Reinforced Cement Concrete in 1:1.5:3 Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete.
10.Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc..,
11.Supply & Fixing of SFRC Manhole cover With frame 600mm x 600mm as per standard quality including of all materials and all labour charges for fixing in position etc.completeas Standard specification.
12. Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
Add :- GST @ 18%
stage.html
html • 0.02 MB
finance_480488.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .