Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.5 L+₹3,750.33 (1.09%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.7 L+₹27,452.43 (8.01%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.8 L+₹41,503.67 (12.1%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹3.9 L+₹47,454.19 (13.9%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹15,000
Closing Date
28 Feb 2026, 1:30 pmClosed
DFO Kishtwar
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_304106_1
42 of 2025
Open Tender
Agricultural or Forestry
Percentage
60 days
Paddar Range
SBD
2 documents required · 2 mandatory
₹600
DFO Kishtwar
₹15,000
21 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in: All kinds of Soil
2. Providing and Laying Cement Concrete (1:5:10) Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size)
3. Reinforced Cement Concrete Work (1:1½:3) R.C.C work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering, shuttering, finishing and reinforcement (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
4. Reinforcement for R.C.C Work Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete. Quantity vide item no. 3
5. Centering and Shuttering Centering and shuttering including strutting, propping etc. and removal of form for columns, pillars, piers, abutments, posts and struts
6. Steel Work in Built-up Tubular Sections (Gate) Steel work in built up tubular (round, square or rectangular hollow tubes etc.), trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. To be paid as per actual during execution (GATE).
7. Painting with Synthetic Enamel Paint Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
8. Providing and Laying Cement Concrete (1:3:6) Providing and laying in position cement concrete of specified grade excluding cost of centring and shuttering – All work upto plinth level (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) – Crushed
9. Centering and Shuttering for Foundations Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 (1 cement : 4 coarse sand)
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level Qty Vide item No.10
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone agg 12.5 mm nominal size) and curing complete
CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 1:4 (1 cement : 4 fine sand)
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Carriage of materials from source to site of work by M.T. Sand av. 30 KM MT
Carriage of materials from source to site of work by M.T. Bajri av. 30 KM MT
Carriage of materials from source to site of work by M.T. Brick av. 300 KM MT
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_987838.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .