| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance BLDG NO 03 SF 3 SF 4 TECHNO CIDADE CHOGM ROAD ALTO PORVORIM BARDEZ GOA | NORTH GOA | GOA | 403524 | +12.97% | ₹4.1 Cr | L1 | Admitted-Finance |
Tender Value
₹3.7 Cr
EMD Value
₹7.6 L
Closing Date
3 Jun 2026, 3:00 pmClosed
EXECUTIVE ENGINEER,DIV XXIII(R)
Bicholim Goa
RCC Bridge at Ch.2.670 Kms of MDR23 to Hathkhamba-Goa road in North Goa District under PMGSY-III(Re-Tender 3rd call)
2026_PWD_147797_1
GA01213
Open Tender
Civil Works - Bridge Construction
Percentage
365 days
Bicholim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹7.6 L
8 Jun 2026
20 May 2026
5 Jun 2026
20 May 2026
3 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | - | - | - | - |
| 2 | Upto 3.000 M Depth | 976.08 | Cum | 200 | ₹1,95,216 |
| 3 | 3.000 M to 6.000 M Depth | 687.23 | Cum | 200 | ₹1,37,446 |
| 4 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 109.32 | Cum | 2,157.38 | ₹2,35,844.78 |
| 5 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications M-15 | 448.28 | Cum | 5,815.52 | ₹26,06,981.31 |
| 6 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications M-30 | 325.49 | Cum | 7,002.66 | ₹22,79,295.8 |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. | 28.31 | MT | 88,840.33 | ₹25,15,069.74 |
| 8 | Carrying out the confirmatory boring for soil investigation for foundation as per clause 2400 of MORT&H Specification. | 3 | Cum | 25,000 | ₹75,000 |
| 9 | Cement Concrete :- Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 243 | Cum | 716.65 | ₹1,74,145.95 |
| 10 | Reinforced Cement Concrete :- Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 129.6 | Cum | 1,198.43 | ₹1,55,316.53 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
Tendernotice_2.pdf
PDF • 0.39 MB
BOQ_230658.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .