Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹250.0 CrAccepted-AOC PLOT NO R 270 SYNERGIA IT PARK TTC INDUSTRIAL ESTATE GAUTAM NAGAR NEAR RABALE POLICE STATION RABALE NAVI MUMBAI THANE MAHARASHTRA 400701 | THANE | MAHARASHTRA | 400701 | ₹250.0 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹256.1 Cr+₹6.2 Cr (2.46%)Rejected-Finance | ₹256.1 Cr+₹6.2 Cr (2.46%) | L2 | Rejected-Finance 2ND LOWEST BIDDER |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Eligable |
| Sl No | Description | Qty | Unit | Aurionpro Solutions Limited | MSI Global Private Limited |
|---|---|---|---|---|---|
| 1.00DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF AUTOMATIC FARE COLLECTION SYSTEM INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD FOR MUMBAI METRO LINE 4 AND EXTENSION CORRIDOR (4A) [WADALA- KASARVADAVALI - GAIMUKH] OF MUMBAI METRO RAIL PROJECT OF MMRDA. | |||||
| 1.01 | WLC NPV COST | 1 | LS | 2,49,96,62,888 ₹2,49,96,62,888 Lowest | 2,56,11,68,047 ₹2,56,11,68,047 |
Tender Value
₹411.1 Cr
EMD Value
₹10 L
Closing Date
29 Nov 2024, 2:00 pmClosed
DIRECTOR SYSTEM
1ST FLOOR, A WING, OLD MMRDA BLD BKC
DESIGN MANUFACTURE SUPPLY INSTALLATION INTEGRATION TESTING AND COMMISSIONING OF AFC SYSTEM INCLUDING 15 YRS OF COMPREHENSIVE MAINTENANCE AFTER 2 YRS OF DLMP FOR MML 4 AND 4A WADALA _KASARVADAVALI_GAIMUKH OF MUMBAI METRO RAIL PROJECT OF MMRDA
2024_MMRDA_1051381_1
CA 237
Open Tender
Electrical and Maintenance Works
Lump-sum
MUMBAI
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,900
₹10 L
MMRDA BKC
19 Sept 2025
11 Jul 2024
2 Dec 2024
11 Jul 2024
29 Nov 2024
11 Jul 2024
11 Jul 2024 - 23 Jul 2024
19 Jul 2024
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF AUTOMATIC FARE COLLECTION SYSTEM INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD FOR MUMBAI METRO LINE 4 AND EXTENSION CORRIDOR (4A) [WADALA- KASARVADAVALI - GAIMUKH] OF MUMBAI METRO RAIL PROJECT OF MMRDA.
WLC NPV COST
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .