| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.5 LAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹23.9 L+₹2.1 L (9.53%)Rejected-Finance | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹24.4 L+₹2.6 L (11.7%)Rejected-Finance NEW MADHOPUR COLONY SURAJKUND GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹22.2 L
EMD Value
₹25,000
Closing Date
17 Feb 2020, 12:00 pmClosed
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
OPERATION AND MAINTENANCE OF 132/33 KV 2X40 (SAS) MVA SUBSTATION KURSATO FOR THE PERIOD OF ONE YEARS
2020_UPTCL_431414_1
Short Term E-Tender No. 159/2019-20/ETC/VNS
Open Tender
Electrical Works
Item Wise
365 days
132 KV Substation Kursato
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹2,950
SE, ETC, Varanasi
₹25,000
21 Nov 2020
6 Feb 2020
17 Feb 2020
6 Feb 2020
17 Feb 2020
10 Feb 2020
Amount
Operation and Maintenance of 132/33 KV (SAS) substation Kursato Varanasi under Electricity. Trans. Division-I as per standard practice of UPPTCL and as per instruction of AE/JE for the period for one years with cost of man, misc, consumables, T&P etc. required for the job except the spare items/material/equipment which shall be provided by the department. The job includes as per detailed below.
Operation of Substation
Operation of 132/33 KV Substation Kursato , Varanasi round the clock in 3 shift of 8 Hrs. each shift comprising I.T.I. in Electrical trade as T.G.-II/S.S.O. with knowledge of computer application and skilled helper by due operation of substation as per standard practice of UPPTCL and instruction of AE/JE and CLDS/ALDS along with recording of operational activities, system information/ data messages etc for the period of one year with cost of men required for the job (1 job for 1month ). (1 SSO +1Skilled helper in each shift )
Maintenance of substation
Preventive, routine & general/normal break down maintenance of transformer/switchyard equipments, capacitor bank, C&R panels, RTCC panel, ACDB, CCTV camera, battery sets (110 volt), lighting system (switchyard, control room) round the clock and or as and required by a team comprising experienced technical person in Electrical trade as T.G.-II/electrical, line man/fitter and skilled helper) as per standard practice of UPPTCL and instruction of AE/JE for the period of one year with cost of men misc. consumables, T&P etc. required for the job except the spare/items/materials/equipments, which shall be provided by department as required for completion of job. (1 job for 1 month) (1Supervisor + 1 Line Man + 1SSO Electrical Trade +1Skilled helper)
Regular maintenance of lawn/garden & flower vases including proper cutting of grass, hedges, ornamental plants/trees, seasonal flowers etc. along with maintenance of trees/plants/hedges along the roads between main gate to control room/store at substation to keep them healthy & green including replacement of aired plants, grass, seasonal flowers etc. for period of one year with all cost of man and material T&P etc. required for completion of job. (1 job for 1 month) (1Mali + 1Unskilled helper)
Daily general cleaning and maintenance/up keep of control room, associated office, colony, battery room, committee room etc. by brooming & mopping along with cleaning of associated toilets covers and scraping of unwanted growths in between joints of CC roads etc. at the substation for the period of 12 months with all cost of men, material and T&P required for completion of job. (1 job for 1 month)
Cleaning and grass cutting of switchyard and surrounding by scraping of grass, bush, wood, shrubs & plants etc. weeding out of wild growth roots, seeds etc. including of small wild trees if any at substation premises and disposal of all the removed vegetation, rubbish & garbage etc. by throwing it out side of substation boundary 4 times in one year with all cost of man, consumables, T&P etc. required for completion of job including spraying of chemical before each cutting (4 job in a year)
Rama Power construction
ARK ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .