Tender Value
₹21.1 L
EMD Value
₹1.1 L
Closing Date
20 Oct 2026, 12:00 pm
EO Office NP Harra
EO Office NP Harra
roadside berm from the pump house to the welcome gate along the main road of Harra Nagar Panchayat.
2026_DOLBU_1190845_1
343/NPH/2026-27 Date 26/09/2026
Open Tender
Civil Works
Fixed-rate
75 days
EO Office NP Harra
3 documents required · 3 mandatory
₹2,493
EO Office NP Harra
₹1.1 L
28 Sept 2026
28 Sept 2026
20 Oct 2026
28 Sept 2026
20 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankment in ordinary soil excavation to be tha form regular pits not exceeding 0.50m, in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and lopes and also including 1.5 M lifgt and 30M lead the earth from cutting to be used in making embankment or to be deposited as sopil banks with-in 30M distance as directed by the Engineer incharge( royalty removed by Govt) for small works/abadi area ( where machine can not move) 253a | 135 | Cum | 78 | ₹10,530 |
| 2 | Earth work in filling upto distance 10.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work, | 189 | Cum | 374 | ₹70,686 |
| 3 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work(Chpt-5/273) | 5.75 | Cum | 2,930 | ₹16,847.5 |
| 4 | M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper analysis) | 8.63 | Cum | 6,601 | ₹56,966.63 |
| 5 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper analysis) | 37.5 | sqm | 181 | ₹6,787.5 |
| 6 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work (Chpt-5/279a) | 2.88 | Cum | 5,650 | ₹16,272 |
| 7 | Providing,laying,spreading 45.5-63mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work | 67.5 | Cum | 3,676 | ₹2,48,130 |
| 8 | Providing,laying,spreading 22.4-53mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work | 67.5 | Cum | 3,752 | ₹2,53,260 |
| 9 | Supply & laying of 100mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Grey tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (asper analysis) | 675 | sqm | 1,210 | ₹8,16,750 |
| 10 | Supply & laying of 100mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Colours tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (asper analysis) | 225 | sqm | 1,290 | ₹2,90,250 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
Tendernotice_2.pdf
PDF • 1.88 MB
BOQ_2244813.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .