Loading…
Loading…
Tender Value
₹2.6 L
EMD Value
₹5,166
Closing Date
3 Sept 2026, 10:00 am6d left
Hazari Lal Sah
Silver Jubilee Road , Cooch Behar
Patch Repairing work to the damage portion occurred due heavy rainfall of Hanger Road under Cooch Behar Division PWD Cooch Behar during the year 2026_27
2026_WBPWD_5020053_1
WBPWD/AE/CSD_II/NIT_08/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
Cooch Behar sadar
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,166
Yes
27 Aug 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201) | - | Hectr | 65,471.56 | - |
| 2 | Repairing Pot-holes with Bituminous Macadam (Grading - II, for compacted thickness of upto 75mm) Filling Pot Holes with Bituminous Macadam using Mobile Hot Mix plant (6-10 TPH) with approved crushed aggregates of specified grading premixed with bituminous binder @3.4% by wt. of the total mix, transported to site and laid in the pot hole prepared before hand by cutting the edges to get a firm vertical face and by
removing all the failed and loose materials including dust and applying tack coat evenly on the sides and on the surface as per specification, rolling the filled depressionwith 8-10 tonne smooth wheeled roller to achieve the desired compaction, including the cost and carriage of stone aggregates and
bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of all operational staff, quality controlexcept the cost of tack coat complete as per direction of Engineer-in-charge. | - | Cu.M | 9,740.05 | - |
| 3 | Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on the prepared bituminous/granular
/cement concrete pavement surface cleaned with mechanical
broom and high pressure air jet (Reference to MORT&H's
specification clause 503).On Bituminious surface Bitumen MS @ 0.25KG/Sqm | - | sq.m | 28.28 | - |
| 4 | Open - Graded Premix Surfacing Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using viscosity grade bitumen ofapproved grade to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled tandem or other approved type roller 8-10 tonne capacity, finished to required level and grades (Reference to MORT&H's specification clause 510). | - | Sq.M | 267.44 | - |
| 5 | Seal Coat 12(ii) Case - II : Type B Providing and laying of premix sand seal coat with HMP using approved crushed stone chipping and viscosity grade paving bitumen of
suitable approved grade | - | Sq.M | 97.35 | - |
| 6 | ADD GST @ 18.00% ON SUM OF AMOUNT Sl-01 to SL-5 | - | GST | 0.18 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_5093849.xls
BOQ • 0.43 MB
WBF-2911-ii.pdf
Tender Documents • 2.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].