Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-Finance NANOWAL CO OP LAB CONST SOCIETY LTD | PATIALA | PUNJAB | 140402 | ₹27.7 L | L1 | Accepted-Finance found responsive |
| 2 | L2₹31.4 L+₹3.6 L (13.0%)Accepted-Finance | ₹31.4 L+₹3.6 L (13.0%) | L2 | Accepted-Finance found responsive |
Tender Value
₹33.0 L
EMD Value
₹66,020
Closing Date
11 Aug 2026, 10:00 amClosed
EE Provl Divn PWD BandR SBS Nagar
EE Provl Divn PWD BandR SBS Nagar
Const of Additional Court Room at Judicial court Complex at Balachaur in Distt SBS Nagar
2026_CEPW_172647_1
Tender Notice No 06 Dt 27.07.2026
Open Tender
Civil Works - Buildings
Percentage
90 days
nawanshahr
Please refer Tender documents.
14 documents required · 14 mandatory
₹5,000
₹66,020
7 Sept 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 89.55 | cum | 191.74 | ₹17,170.26 |
| 2 | Cement concrete 1:4:8 (PCC) | 11.19 | cum | 4,243.28 | ₹47,498.08 |
| 3 | First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth. | 27.67 | cum | 8,094.65 | ₹2,24,005.99 |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 63.84 | sqm | 221.24 | ₹14,123.07 |
| 5 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 4.2 | cum | 6,070.02 | ₹25,479.77 |
| 6 | Centring and shuttering for sides and soffits of beam, beams launchings girders bressumers, lintels | 46.84 | Sqm | 400.33 | ₹18,751.52 |
| 7 | Centring and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 128.81 | Sqm | 560.46 | ₹72,193.34 |
| 8 | Reinforced cement concrete M-20 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 1.15 | cum | 6,217.76 | ₹7,131.67 |
| 9 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 24.21 | cum | 6,860.15 | ₹1,66,112.27 |
| 10 | First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level.. | 53.97 | cum | 8,240.03 | ₹4,44,753.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.71 MB
BOQ_351100.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .