Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-AOC | 1 | Accepted-AOC ok |
Tender Value
₹1.1 L
EMD Value
₹2,220
Closing Date
24 Jan 2022, 12:00 pmClosed
Executive Engineer, Karnal W/S Division, Karnal
Executive Engineer, Karnal W/S Division, The Mall Road Karnal
Reconstruction of damaged RCC Columns Battens and M.S. Railling /Fencing of Bathing Ghat L/S from RD 75000 to 78000 due to turn of Bus at RD 77000 L/S of WJC Main Branch
2022_HRY_204564_4
No.318-333/53M dated 13/01/2022
Open Tender
Civil Works
Item-rate/Agreement basic
30 days
karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹2,220
24 Mar 2022
19 Jan 2022
24 Jan 2022
19 Jan 2022
24 Jan 2022
19 Jan 2022
Amount
Works Details
PCC providing & Laying in position machine batched and Machine mixed desgin mix M-15 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P. cement content 240 kg Per cum including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications as per HSR item No.(10.64-10.79+10.41)
RCC providing &Laying in position machine batched and Machine mixed desgin mix M-25 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P minimum cement content 330 kg including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications as per HSR item No. 10.66
1st class brick work laid in cement mortar 1:3 in foundation & plinth including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 11.5
Centering & Shuttering for foundation concrete including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications as per HSR Item No.9.13.
Centering & shuttering for faces of walls including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications as per HSR Item No.9.5
Fe-500 EQ TMT steel bars RCC work where not included in the complete rate of RCC including bending, binding and placing in position complete in all respect including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications as per (HSR item No. 18.22)
Wrought iron and mild steel ladders grills, grating frames, window guards, iron doors openable or fixed staircase or parapet or any type of railing, gates and tree guards etc., including cpost of screws and welding rods and bolts and nuts complete fixed in position including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications as per HSR item No. 18.12
Painting two coat excluding priming coat with ready mixed paint for metalic surfaces in all shades on new steel or iron work including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications as per HSR item No. 16.17 (with 2nd quality).
Dismantling of cement concrete 1:3:6 including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge , as per approved drawing/ design supplied by the department & as per PWD specifications as per (HSR 8.6 (c)
Credit for old steel to be recoverd from the dismentalled material i.e M.S Railling
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .