| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.1 LAccepted-AOC | ₹3.1 L | l1 | Accepted-AOC lowest rate will be approved |
| 2 | l2₹3.3 LRejected-Finance | ₹3.3 L | l2 | Rejected-Finance lowest rate will be approved |
| Sl No | Description | Qty | Unit | RAMAIAH SARAVANAN L1 | S.P.GUNASEKARAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Pot Hole Repairs Road Siruvatchi Perunganur Road at Siruvatchi Panchyat KM 0/0-4/0 (R-21) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 180 | m3 | 6.36 ₹1,144.80 | 10 ₹1,800 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 39.6 | m3 | 140.35 ₹5,557.86 | 180 ₹7,128 |
| 4.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | |||||
| 5.00 | KM-0/0-1/0 | 5.42 | m2 | 4,676.46 ₹25,346.41 | 4,800 ₹26,016 |
| 6.00 | KM-0/0-2/0 | 3.21 | m2 | 4,684.59 ₹15,037.53 | 4,800 ₹15,408 |
| 7.00 | KM-0/0-3/0 | 1.54 | m2 | 4,692.72 ₹7,226.79 | 4,850 ₹7,469 |
| 8.00 | KM-0/0-4/0 | 1.78 | m2 | 4,700.85 ₹8,367.51 | 4,850 ₹8,633 |
| 9.00 | Providing and laying Tack Coat over Existing BT surface using 3 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5. | 270 | m2 | 33.13 ₹8,945.10 | 43 ₹11,610 |
| 10.00 | Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 6.76 | m3 | 11,650.94 ₹78,760.35 | 11,900 ₹80,444 |
Tender Value
₹3.5 L
EMD Value
₹3,480
Closing Date
24 Oct 2025, 3:00 pmClosed
Block Development Officer
Kannangudi Panchayat Union
Maintenance Road at Unjanai, Siruvatchi Panchayat Package No 1
2025_RDTN_615799_1
MAINTENANCE OF ROAD AT UNJANAI SIRUVATCHI PANCHAYAT PACKAGE NO.1
Open Tender
Civil Works
180 days
Kannangudi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,480
Yes
11 May 2026
18 Oct 2025
24 Oct 2025
18 Oct 2025
24 Oct 2025
18 Oct 2025
18 Oct 2025 - 24 Oct 2025
Amount
Pot Hole Repairs Road Siruvatchi Perunganur Road at Siruvatchi Panchyat KM 0/0-4/0 (R-21)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack Coat over Existing BT surface using 3 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5.
Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Pot Hole Repairs Road From Kandanoor Aravayal Road to Keelakadiyavayal Road at Unjanai Panchyat KM 0/0-4/0 (R-75)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack Coat over Existing BT surface using 3 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5.
Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.P.GUNASEKARAN CONTRACTOR (BID ID -1494675)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_735800.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
TenderDocumentPackage1.pdf
Tender Documents • 1.04 MB
BOQ_735800.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid