Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹8,180 (5.02%)Admitted-Finance | ₹1.7 L+₹8,180 (5.02%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 L+₹18,830 (11.6%)Admitted-Finance | ₹1.8 L+₹18,830 (11.6%) | L3 | Admitted-Finance |
| 4 | L4₹1.8 L+₹19,830 (12.2%)Admitted-Finance | ₹1.8 L+₹19,830 (12.2%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | m/s paul engineering constructions L2 | M/S HIBBA ELECTRICALS L1 | BUDOO ELECTRICALS AND SUPPLIERS L4 | MARS ELECTRICALS MECHNICALS & SUPPLIERS L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | Supply installation testing and commissioning of 33 kV Lightening Arrestors (33 kV, 10kA, Station class, ZnO, Polymer) gap less (1 No. per Φ) | 1 | Set | 45,000 ₹45,000 | 26,000 ₹26,000 Lowest | 60,000 ₹60,000 | 82,000 ₹82,000 |
| 1.02 | Supply installation testing and commissioning of End termination for 3C 120 - 240 mm² | 4 | Kit | 26,000 ₹26,000 | 10,000 ₹10,000 | 8,000 ₹8,000 | 6,000 ₹6,000 Lowest |
| 1.03 | Providing and laying of 33kV, Three core 120 mm² Aluminium Flat strip Armoured XLPE FRLS Cable | 20 | Mtr | 36,000 ₹36,000 | 60,000 ₹60,000 | 26,000 ₹26,000 | 20,000 ₹20,000 Lowest |
| 1.04 | Supply installation testing and commissioning of 33 kV Isolator, with Earthing Blade (36kV,800 A, Outdoor ,3 poles,25 kA). | 1 | Set | 17,000 ₹17,000 Lowest | 63,000 ₹63,000 | 80,000 ₹80,000 | 70,000 ₹70,000 |
| 1.05 | Providing and fixing of GI Channel / Angle/ Flat of sizes including clamps | 25 | Kg | 45,000 ₹45,000 | 3,125 ₹3,125 | 7,500 ₹7,500 | 2,500 ₹2,500 Lowest |
| 1.06 | Providing and fixing Galvanized Nuts & Bolts of sizes | 4 | Kg | 1,000 ₹1,000 | 520 ₹520 Lowest | 600 ₹600 | 600 ₹600 |
| 1.07 | Providing and fixing Pole collar | 3 | No | 1,200 ₹1,200 | 375 ₹375 Lowest | 750 ₹750 | 750 ₹750 |
Tender Value
₹1.8 L
EMD Value
₹3,700
Closing Date
10 Jul 2026, 4:00 pmClosed
Executive Engineer EDI
Office of Executive Engineer EDI
Permanent restoration of 100/33KV/433V/50HZ 3phase transformer installed at Horse stable Gupkar feeding street lighting network
2026_PDD_312938_1
E-NIT No 016/EDI
Open Tender
Electrical and Maintenance Works
Lump-sum
10 days
Office of Executive Engineer EDI
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
Yes
Executive Engineer EDI
₹3,700
Yes
30 Jul 2026
19 Jun 2026
11 Jul 2026
19 Jun 2026
10 Jul 2026
19 Jun 2026
19 Jun 2026 - 27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply installation testing and commissioning of 33 kV Lightening Arrestors (33 kV, 10kA, Station class, ZnO, Polymer) gap less (1 No. per Φ) | 1 | Set | - | - |
| 1.02 | Supply installation testing and commissioning of End termination for 3C 120 - 240 mm² | 4 | Kit | - | - |
| 1.03 | Providing and laying of 33kV, Three core 120 mm² Aluminium Flat strip Armoured XLPE FRLS Cable | 20 | Mtr | - | - |
| 1.04 | Supply installation testing and commissioning of 33 kV Isolator, with Earthing Blade (36kV,800 A, Outdoor ,3 poles,25 kA). | 1 | Set | - | - |
| 1.05 | Providing and fixing of GI Channel / Angle/ Flat of sizes including clamps | 25 | Kg | - | - |
| 1.06 | Providing and fixing Galvanized Nuts & Bolts of sizes | 4 | Kg | - | - |
| 1.07 | Providing and fixing Pole collar | 3 | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
SBD016.pdf
Other Document • 0.72 MB
BOQ_1012881.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .