Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.1 CrAdmitted-Finance | -26.89% | ₹9.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.8 Cr+₹70.9 L (7.77%)Admitted-Finance | -21.21% | ₹9.8 Cr+₹70.9 L (7.77%) | L2 | Admitted-Finance |
| 3 | L3₹9.8 Cr+₹71.8 L (7.86%)Admitted-Finance | -21.14% | ₹9.8 Cr+₹71.8 L (7.86%) | L3 | Admitted-Finance |
Tender Value
₹12.5 Cr
EMD Value
₹25.0 L
Closing Date
8 Oct 2025, 5:00 pmClosed
DIG (Engr), Dte. Gen
DIG, CTC, ITBP, Alwar
Construction of 100 Mtr Baffle Firing Range at CTC, ITBP
2025_ITBP_877977_1
No. II-11012/31/2025/Const- 775 Dtd. 17.09.25
Open Tender
Civil Works
Percentage
CTC Alwar Rajsthan
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25.0 L
23 Jan 2026
18 Sept 2025
9 Oct 2025
18 Sept 2025
8 Oct 2025
18 Sept 2025
18 Sept 2025 - 8 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 6,715.02 | cum | 248.21 | ₹16,66,735.11 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil. | 2,965.21 | cum | 120.91 | ₹3,58,523.54 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 9,600 | Sqm | 16.78 | ₹1,61,088 |
| 4 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil. Pipes, cables etc, not exceeding 80 mm dia. | 250 | Metre | 205.58 | ₹51,395 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 4,989.22 | cum | 186.89 | ₹9,32,435.33 |
| 6 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 181.33 | Ltr | 223.84 | ₹40,588.91 |
| 7 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :2.35.3 Treatment of soil under existing floors using chemical emulsion@ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 272 | Sqm | 295.65 | ₹80,416.8 |
| 8 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 533.34 | cum | 2,025.08 | ₹10,80,056.17 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 526.53 | cum | 7,953.33 | ₹41,87,666.84 |
| 10 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. | 1,729.01 | Sqm | 139.36 | ₹2,40,954.83 |
stage.html
html • 0.03 MB
technical_922875.pdf
techsummary_922875.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 24.32 MB
BOQ_922875.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .