Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 13 138 SHAKTINAGAR SHUKLAGANJ UNNAO | UNNAO | UTTAR PRADESH | 209801 | Accepted-Technical document complete |
| 2 | Accepted-Technical VARANASI | VARANASI | UTTAR PRADESH | Accepted-Technical document complete |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
29 Apr 2026, 3:00 pmClosed
Superintending Engineer, Meerut Circle
Office of The Superintending Engineer, Meerut Circle, UPAVP, Shastri Nagar Meerut
Tourism development works at the Ravidas Temple in Shukteerth, District Muzaffarnagar
2026_UPHDB_1133129_1
NIT981/G-12/33 dt 25-03-2026 Sr No 06
Open Tender
Civil Works
Percentage
180 days
Shukteerth, District Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,310
Executive Engineer CD Meerut-03
₹3.6 L
7 May 2026
6 Apr 2026
29 Apr 2026
6 Apr 2026
29 Apr 2026
6 Apr 2026
6 Apr 2026 - 29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | CUM | - | - |
| 2 | Extra additional lift above 1.5 m | - | Cum | - | - |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | - | CUM | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | CUM | - | - |
| 5 | Providing and laying Separation Membrane of impermeable plastic sheeting 125 micron thick as per direction of engineer in charge. | - | SQM | - | - |
| 6 | Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required Note for item no. 2.24:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in difficult conditions. The depth shall be reckoned correct to 0.10 m, (0.05 m or more shall be taken as 0.10 m and less than 0.05 m ignored.) Extra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. | - | CUM | - | - |
| 7 | Extra for laying reinforced cement concrete in or under water and/ or liquid mud, including cost
of pumping or bailing out water and removing slush etc., complete. As per direction of E/I as per D.S.R 2023 4.15 Note For Item No. 5.31:- The quantity will be calculated by multiplying the depth measured from the subsoil water level up to the centre of gravity of the R.C.C. under subsoil water with the quantity of R.C.C. in cubic metre executed under subsoil water. The depth of centre of gravity shall be reckoned correct to 0.1 m (0.05 m or more shall be taken as 0.1 m and less than 0.05 m ignored). No extra payment shall be made for placing reinforcement or centering & shuttering under sub - soil water conditions. | - | CUM | - | - |
| 8 | Extra for laying reinforced cement concrete in or under water and/ or liquid mud, including cost
of pumping or bailing out water and removing slush etc., complete. Note For Item No. 5.31:- The quantity will be calculated by multiplying the depth measured from the subsoil water level up to the centre of gravity of the R.C.C. under subsoil water with the quantity of R.C.C. in cubic metre executed under subsoil water. The depth of centre of gravity shall be reckoned correct to 0.1 m (0.05 m or more shall be taken as 0.1 m and less than 0.05 m ignored). No extra payment shall be made for placing reinforcement or centering & shuttering under sub - soil water conditions. | - | CUM | - | - |
| 9 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | CUM | - | - |
| 10 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the coloumn pitswall tench basement excavation top surface if plinth filling junction of wall and floor along the external perimer of binding expansion joints,surrounding of pipes and conduits etc.complete(plinth area of the building at ground floor only shall be measured as per I.S.6313(Part ll 1981) aldrine emulsifiable concrete or any other approved material such as hepthachlor or chlordance will be used.The rate of application of chemical emulsion shall be as follows:- (1)treatment for masonary & foundation 5 litres per sq.m. (2)back fill in immediate contract with foundation 7.5 litre per sq.m (3)treatment of top surface of plinth filling 5 liters per sq.m. (4)treatment of soil along external parameter of building 7.50 lire per sqm.
(5)Treatment of soil along External Perimeter 5 litres per sqm. (For payment plinth area to be measured as per IS Code). | - | SQM | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
RAVIDASTAMPLE.pdf
Tender Documents • 27.08 MB
BOQ_2115151.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .