Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.0 LAccepted-AOC BEHIND ROMA BAR IN SHASTRAKAR LAYOUT CHANDRAPUR 442401 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442401 | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹7.5 L+₹1.5 L (25.8%)Rejected-Finance | L-2 | Rejected-Finance Concluded from BOQ as L-2 Bidder. |
| Sl No | Description | Qty | Unit | Vinodkumar Sharma L2 | Rajendra Prasad L1 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 1.00 | Groove/Grip in coal/shale in side pillar and in roof in U/G including in tubs and unloading from the tub transporting to the work site within the lead 50m or part thereof at underground | 8.1 | Cum | 1,900 ₹15,390 | 1,600 ₹12,960 Lowest |
| 1.00 | Cleaning of muck/malma/coal & removal of debris loading manually and unloading the same away from the cleaning places and stacking as per the direction of management | 10.94 | Cum | 500 ₹5,467.5 | 300 ₹3,280.5 Lowest |
| 1.00 | Providing & laying RCC 1:1.5:3 (1 cement: 1.5 Course sand 3 m graded stone aggregate 20mm normal sizes in Groove/Grip in coal/shale in side pillar and in roof excluding the cost of centering and shuttering | 8.1 | Cum | 8,000 ₹64,800 | 6,700 ₹54,270 Lowest |
| 1.00 | Transportation charge of cement bags at surface to incline/ pit top mouth including loading in tubs within the lead 50m or part thereof at surface | 65 | Bags | 10 ₹650 | 4 ₹260 Lowest |
| 1.00 | Transportation charges of cement bags to site in underground including unloading from the tub and transportation to the work site in underground lead 50m or part thereof at underground | 65 | Bags | 10 ₹650 | 4 ₹260 Lowest |
| 1.01 | Transportation charges of sand at surface to incline/pit top mouth including loading in tubs within lead 50m or part thereof at surface | 3.56 | Cum | 500 ₹1,782 | 300 ₹1,069.2 Lowest |
| 1.01 | Transportation charges of sand of work site in underground from the tub and transporting to the work site within the lead 50m or part thereof at surface | 3.56 | Cum | 500 ₹1,782 | 300 ₹1,069.2 Lowest |
| 1.01 | Transportation charges of metal at surface to incline/pit top mouth including loading in tubs within the lead 50m or part thereof at surface | 7.13 | Cum | 400 ₹2,851.2 | 300 ₹2,138.4 Lowest |
| 1.01 | Transportation charges of metal to work site to metal to work site in underground from the lead 50m or part thereof at Surface | 7.13 | Cum | 400 ₹2,851.2 | 350 ₹2,494.8 Lowest |
Tender Value
₹9.2 L
EMD Value
₹9,800
Closing Date
8 Oct 2025, 5:00 pmClosed
Staff Officer, (Civil), CHA
Office of AGM, CHA.
Construction of 50 Nos. Horizontal girder transportation, jamming, doogi work and R.C.C work at Incline No. 6 and 8 (Travelling and Haulage roadway) in UG of Nandgaon Incline, Hindustan Lalpeth Sub Area of Chandrapur Area.
2025_WCL_344443_1
WCL_CHA_civil_eT-058
Open Tender
Civil Works - Others
Item Rate
90 days
HLSA, Chandrapur Area.
As per NIT
5 documents required · 5 mandatory
₹9,800
8 Nov 2025
23 Sept 2025
10 Oct 2025
23 Sept 2025
8 Oct 2025
24 Sept 2025
23 Sept 2025 - 27 Sept 2025
Amount
Item Description/ Heading
Groove/Grip in coal/shale in side pillar and in roof in U/G including in tubs and unloading from the tub transporting to the work site within the lead 50m or part thereof at underground
Cleaning of muck/malma/coal & removal of debris loading manually and unloading the same away from the cleaning places and stacking as per the direction of management
Providing & laying RCC 1:1.5:3 (1 cement: 1.5 Course sand 3 m graded stone aggregate 20mm normal sizes in Groove/Grip in coal/shale in side pillar and in roof excluding the cost of centering and shuttering
Transportation charge of cement bags at surface to incline/ pit top mouth including loading in tubs within the lead 50m or part thereof at surface
Transportation charges of cement bags to site in underground including unloading from the tub and transportation to the work site in underground lead 50m or part thereof at underground
Transportation charges of sand at surface to incline/pit top mouth including loading in tubs within lead 50m or part thereof at surface
Transportation charges of sand of work site in underground from the tub and transporting to the work site within the lead 50m or part thereof at surface
Transportation charges of metal at surface to incline/pit top mouth including loading in tubs within the lead 50m or part thereof at surface
Transportation charges of metal to work site to metal to work site in underground from the lead 50m or part thereof at Surface
Fixing of horizontal girders including transportation charges of Girders & materials to work site within the lead 50m or part thereof at underground.
Total impact of GST for the purpose of CTC
Vinodkumar Sharma (BID ID -1189454)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .