Loading…
Loading…
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
16 Jul 2026, 6:00 pm
Executive Officer Municipal Board Bhinmal
Executive Officer Municipal Board Bhinmal
Rate Contract of Construction and repairing of Nala/Nali Crossing From Ward No. 01 to 20 at Various Places in Municipal Board Bhinmal
2026_DLB_573364_3
E09 2029
Open Tender
Civil Works
365 days
Municipal Area Bhinmal
As per NIT
2 documents required · 2 mandatory
₹500
Secretary, RREIS
₹20,000
Yes
7 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
7 Jul 2026 - 16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer Cement Concrete Grade M-15 and above and PCC blocks | - | Cum | 678 | - |
| 2.01 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | - | Cum | 166.5 | - |
| 3.01 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not xceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | - | Cum | 2,775 | - |
| 4.01 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery.250 MM | - | Mtr | 842 | - |
| 5.01 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery.300 MM | - | Mtr | 1,187 | - |
| 6.01 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery.350 MM | - | Mtr | 1,777 | - |
| 7.01 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery.400 MM | - | Mtr | 1,970 | - |
| 8.01 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery.450 MM | - | Mtr | 2,135 | - |
| 9.01 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery.500 MM | - | Mtr | 2,530 | - |
| 10.01 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery.600 MM | - | Mtr | 3,535 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1020043.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid