Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹14.2 L+₹93,955.23 (7.07%)Rejected-Finance JAISALMER RAJASTHAN 345001 INDIA UDYAM RJ 18 0001538 | JAISALMER | RAJASTHAN | 345001 | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | L3₹19.1 L+₹5.8 L (43.8%)Rejected-Finance | L3 | Rejected-Finance Not Lowest Bidder | |
| 4 | L4₹19.3 L+₹6.0 L (45.4%)Rejected-Finance | L4 | Rejected-Finance Not Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
3 Jun 2021, 6:00 pmClosed
GE (AF) Jaisalmer
GE (AF) Jaisalmer
Outsourcing of resources for operation and management of AC Plant and annual maint of 15 AFH at AF Station Jaisalmer
2021_MES_441769_1
8715/GE/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
GE (AF) Jaisalmer
As per Tender Documents
7 documents required · 7 mandatory
₹5
Yes
GE (AF) Jaisalmer
₹40,000
Yes
19 Jun 2021
10 May 2021
5 Jun 2021
10 May 2021
3 Jun 2021
21 May 2021
Amount
Schedule 'A' Part-I General Note as applicable for serial item No 2.00 of BoQ/Sch 'A' Part-I Contractors attention is hereby invited that estimated cost of serial item No. 2.00 is Rs. 8,84,400.00 based on prevailing rates of Schedule of Minimum fair wages. Quoted amount against serial item No. 2.00 is less than the amount the work (Estimated of serial item No. 2.00 of BoQ/Sch 'A' Part-I) then lowest bidder will have to deposit FDR in favour of Accepting Officer within 07 days from financial bid opened difference in Estimated cost & quoted amount of serial item No. 2.00, in case lowest bidder said FDR is not submitted within stipulated period as mentioned above. The contractor shall be banned for 06 month & thier bid will be rejected and financial bid will not be opened for next 06 months. FDR submitted by the contractor within 07 days from financial bid opened and the same will be realesed only after satisfactory proof of payment of deployed person under the respective serial item No. 2.00 of Sch 'A' Part-I.
Outsourcing of services for operation, manning and periodical maintenance of AC Plant installed 3x300 TR capacity (02 working and 01 stand by) at 15 Air Force Hospital premises including Pump House, RO Plant, Fire Hydrant System and all related equipment as mentioned below including keeping the installation operational in healthy condition round the clock and daily cleaning of all the equipment related to AC Plant (in three shifts each shift for 08 hours) including Sunday and Holidays with carrying out all daily maintenance complete all as directed by Eng-in-charge and as per indian electricity rules/Engineering Practices & maintain properly the protective instruments complete in good condition and all maintenance records, break down records, by providing with adequate staff strength comprising of the following electrical machineries & equipmnts and all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. Note:- (i) Three AC plant, Pump House, RO Plant and Fire Hydrant System considered in serial item No. 2.00 shall be operated by one operator in one shift, hence three operator for three shifts. (ii) The timing of operation in shifts shall be decided by the department and same shall be followed by the contractor.
Notes for Serial item No. 2.00 :- (iii) During maintenance & operation of AC Plants, if loss of refrigerant and compressor oil take place due to negligence / mishandling of plant, by the contractor’s operators, the same shall be made good by the contractor and cost for the same shall deemed to include in unit rate quoted by the contractor against respective items of Sch ‘A’. (iv) In the event of failure to achieve specified inside condition for any shift or part thereof due to non operation or by other reasons (Except failure of incoming electric / water supply at A/C installations) contractor shall be penalized at double the rates, what quoted for against above respective items of Sch ‘A’ Part-I. (Quoted rate for one shift against any of item above shall be arrived by quoted rates for one month divided by number of shift in a month). (v) Unit rates quoted by the contractor shall deemed to included for three shifts and in case of decrease in shifts, the adjustment of rates shall be done proportionately. Contractor shall provide proper manning to give rest to the deployed person for Sunday/holiday. For this purpose contractor shall provide one extra manpower on every Six FGM. (vi) Daily attendance shall be marked in attendance register by the JE Concerned attendance shall be checked weekly at least by the EIC and monthly by the GE. (vii) Dos" and Don'ts" standing orders of operating machines maintenance programme shall be displayed in each installation (viii) Log book, log sheet shall be filled shift wise. (ix) Operator shall be in proper uniform As approved by the GE and cost of uniform included in the rate quoted. (x) Surrounding area shall be kept clean and tidy. Tool required for cleaning is deemed to be included in the quoted rates.
Notes for Serial item No, 2.00 (Contd) :- (xi) Unit rates quoted by the tenders shall deem to include for Nuts, bolts, Washers, Lugs, Thimbles, wires, terminal clamps, distilled water required for efficient and smooth functioning of the equipment with out any extra cost to the Govt. (xii) Absent from duty of technician is not permissible as E&M services essential in nature. However, found penalty will be levied double the rate per men per shift and recovery from bill shall be done through recovery statement. (xiii) Tenderer shall arrange insurance to his work-men and relevant proofs of the same shall be submitted to the department as and when demanded, the cost for the same is deemed to be included in the rate quoted. Responsibility of compliance of labour regulations in force lies with the tenderer. The provision of statutory laws relating to minimum wages, EPF, ESI payments shall be strictly adhered to by the contractor. The Contractor shall produce proof of payment of wages, EPF and ESI against the respective workmen while claiming payments, The contractor shall employee deployee ITI holder with 03 years experience and recognized govt institute and produce the documents. (xiv) Pump House, RO Plant, Fire Hydrant System and AC operator should be ITI qualified or having minimum five years of experience by a recognized govt institute and produce the documents.
Schedule 'A' Part-II Supply and filling Refrigerant Gas R-134a.
Dryer Filter for Chillar AC Plant as per existing complete all as specified and directed.
Chillar Plant Heater as per existing complete all as specified and directed.
Thermostate as per existing complete all as specified and directed.
Chillar Plant sensor as per existing complete all as specified and directed.
Pressure Gauge as per existing complete all as specified and directed.
Expanion Valve for Chillar Plant as per existing size complete all as specified and directed.
Fan Belt for AHU of size B-106/78/76/126/A-61/44 in repair complete all as specified and directed.
Bearing Shaft as per existing size complete all as specified and directed.
Humidity tank Rod 3 KW in repair complete all as specified and directed.
Pump seal in repair complete all as specified and directed.
Air Purching valve with Ball valve of size 15mm in repair complete all as specified and directed.
Fins 300 TR capacity, Flute size 12mm and 19mm, thickness 0.175mm to 0.20mm, 24" x 12" x 6" (600mm x 300mm x 150mm) in repair complete all as specified and directed.
Switch Disconnector fuse unit (heavy duty) for power distribution and motor protection (in Open Execution TPN) capacity 630 Amps, TPN, 415 volts, SDF suitable for BS type HRC Fuses complete with all accessories in replacement complete all as specified and directed.
Contactor capacity 400 Amps, 3 Pole, 415 Volt, 50 Hz suitable for 160 KW/ 215 HP load complete with all accessories in replacement complete all as specified and directed.
Contactor capacity 250/275 Amps, 3 Pole, 415 Volt, 50 Hz suitable for 110 KW/ 150 HP load complete with all accessories in replacement complete all as specified and directed.
Contactor capacity 115/145 Amps, 3 Pole, 415 Volt, 50 Hz suitable for 110 KW/ 150 HP load complete with all accessories in replacement complete all as specified and directed.
MCCB with Microprocessor release, 4 Pole, 630 Amps rating, rupturing capacity 50 kA, 415 Volt grade, AC, 50 Hz (Ics = 100% Icu), making connections using suitable size copper lugs/thimbles and crimping tool, including disconnecting & taking down old unserviceable MCCB, complete all as specified and directed.
MCCB with Microprocessor release, 4 Pole, 200 Amps rating, rupturing capacity 50 kA, 415 Volt grade, AC, 50 Hz (Ics = 100% Icu), making connections using suitable size copper lugs/thimbles and crimping tool, including disconnecting & taking down old unserviceable MCCB, complete all as specified and directed.
MCCB with Microprocessor release for motor backup protection of capacity 100 Amp, 4 Pole, breaking capacity 36 KA, 415 Volt, 50 Hz (Ics=100%Icu), making connections using suitable size copper lugs/thimbles and crimping tool, including disconnecting & taking down old unserviceable MCCB, complete all as specified and directed.
MCB, Single Pole, 32 Amps rating, with over load and short circuit protection 'C' curve and rupturing capacity 10 kA, 415 Volt grade, AC, 50 Hz and making connections using suitable size copper lugs/thimbles, including disconnecting & taking down old unserviceable MCB, complete, all as specified & directed.
MCB, Three Pole, 32 Amps rating, with over load and short circuit protection 'C' curve and rupturing capacity 10 kA, 415 Volt grade, AC, 50 Hz and making connections using suitable size copper lugs/thimbles, including disconnecting & taking down old unserviceable MCB, complete, all as specified & directed.
Power Contactor capacity 40 Amp, 3 Pole, 415 Volt, 50 Hz, type MNX, conforming IS/IEC 60947-4-1 complete with all accessories including disconnecting & taking down old existing unserviceable contactor complete all as specified and directed.
Power Contactor capacity 32 Amp, 3 Pole, 415 Volt, 50 Hz, type MNX, conforming IS/IEC 60947-4-1 complete with all accessories including disconnecting & taking down old existing unserviceable contactor complete all as specified and directed.
Power Contactor capacity 18 Amp, 3 Pole, 415 Volt, 50 Hz, type MNX, conforming IS/IEC 60947-4-1 complete with all accessories including disconnecting & taking down old existing unserviceable contactor complete all as specified and directed.
Power Contactor capacity 12 Amp, 3 Pole, 415 Volt, 50 Hz, type MNX, conforming IS/IEC 60947-4-1 complete with all accessories including disconnecting & taking down old existing unserviceable contactor complete all as specified and directed.
Power Contactor capacity 9 Amp, 3 Pole, 415 Volt, 50 Hz, type MNX, conforming IS/IEC 60947-4-1 complete with all accessories including disconnecting & taking down old existing unserviceable contactor complete all as specified and directed.
Supply, laying, jointing and testing XLPE insulated armoured heavy duty LT under ground electric cable (ISI marked) with aluminium stranded conductor 1100 Volt grade cross sectional area 95 sqmm 3.5 core laid in trenches/ducts, through pipe, under floors or roads/along poles etc including dismantling & taking out old unserviceable cable complete all as specified and directed.
Descaling of Condenser unit including AHU units (11 Nos) with descaling Chemical (SCALE2/38249022) complete all as specified and directed.
Descaling of AHU units (11 Nos) with descaling Chemical (SCALE2/38249022) complete all as specified and directed.
Rewinding of electric motor of capacity 50 HP for Chiller centrifugal non clog pumping set with supper enameled copper winding wire of existing gauge, size and weight with insulating mataerial and reassembling and re-fixing in same position ccomplete all as specified and directed.
Rewinding of electric motor of capacity 38/40 HP for Chiller centrifugal non clog pumping set with supper enameled copper winding wire of existing gauge, size and weight with insulating mataerial and reassembling and re-fixing in same position ccomplete all as specified and directed.
Rewinding of electric motor of capacity 15 HP for Chiller centrifugal non clog pumping set with supper enameled copper winding wire of existing gauge, size and weight with insulating mataerial and reassembling and re-fixing in same position ccomplete all as specified and directed.
Rewinding of electric motor of capacity 5 HP for Chiller centrifugal non clog pumping set with supper enameled copper winding wire of existing gauge, size and weight with insulating mataerial and reassembling and re-fixing in same position ccomplete all as specified and directed.
Pump Motor coupling required for capacity 40 HP and 30 HP motor including taking down old unserviceable coupling complete all as specified and directed.
Relay 12-32 Amps, 8 Pin, 220V-240 Volt for hot water generator including taking down old unserviceable relay complete all as specified and directed.
Relay 40 Amps, 8 Pin, 220V-240 Volt for hot water generator including taking down old unserviceable relay complete all as specified and directed.
Flow Control acuator and sensor for AHUs RC 981S 24V AC/28V DC Make: OMRON including taking down old unserviceable complete all as specified and directed.
Running capacitor, 50 MFD (2+2) and one point for blower motor suitable for AC of capacity 30/40 HP Motor Make: EPCOS / SYSCAP/ ASIAN/TIBCAB including taking down old unserviceable complete all as specified and directed.
Running capacitor, 100 MFD (2+2) and one point for blower motor suitable for A/C of capacity 30/40 HP Motor Make: EPCOS / SYSCAP/ ASIAN/TIBCAB including taking down old unserviceable complete all as specified and directed.
AC plant pipe lines installed at 15 AF Hospital thoroughly cleaned of all dirt, one coat of primer shall be given to all parts exposed to the weathering effects and two coats of synthetic enamel paint as approved by GE for indoor/outdoor pipe lines complete all as directed
Electronic type Single Phase Preventor suitable for 3 Phase, 415 Volt, motor VSP-2/3 of any make and any size complete as per sample including disconnecting & taking down old unserviceable Single Phase Preventor, complete all as specified and directed.
M/s Ramesh & Company
SS SODHA ENTERPRISES
M/S SHRI HARI CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .