| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.8 Cr+₹15.5 L (0.60%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹26.0 Cr+₹28.6 L (1.12%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹26 Cr+₹32 L (1.25%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical ASHOK PATH RADIAM ROAD RANCHI JHARKHAND | RANCHI | JHARKHAND | 834001 | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | PREETI CONSTRUCTION & DEVELOPERS PVT LTD L4 | SANDEEP TIYA JV L2 | HAKIM MOMION L3 | H N CHOUDHARY CONSTRUCTION PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. RCD SOR -2.3(i) A | 9.28 | Hect. | 93,800 ₹8,70,464 | 90,000 ₹8,35,200 Lowest | 93,366.97 ₹8,66,445.48 | 92,437.73 ₹8,57,822.13 |
| 2.00 | Granular Sub-Base with Graded Material (Table:- 400-1) Plant Mix Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Rate per cum for grading-V Material
RCD SOR -4.01 B (v) | 1,516.2 | cum | 2,455 ₹37,22,271 | 2,400 ₹36,38,880 Lowest | 2,444.29 ₹37,06,032.5 | 2,419.96 ₹36,69,143.35 |
| 3.00 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. RCD SOR -4.14 B | 489 | cum | 2,975 ₹14,54,775 | 2,900 ₹14,18,100 Lowest | 2,961.25 ₹14,48,051.25 | 2,931.78 ₹14,33,640.42 |
| 4.00 | Prime Coat over WMM/WBM
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
RCD SOR -5.01 A | 1,956 | M2 | 86 ₹1,68,216 | 85 ₹1,66,260 Lowest | 85.88 ₹1,67,981.28 | 85.02 ₹1,66,299.12 |
| 5.00 | Tack Coat on Granular surfaces treated with primer
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
RCD SOR -5.02 (ii) | 1,956 | M2 | 17 ₹33,252 | 16 ₹31,296 Lowest | 16.87 ₹32,997.72 | 16.7 ₹32,665.2 |
| 6.00 | Tack Coat on Bituminous surfaces
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
RCD SOR -5.2 (i) | 3,58,762.47 | m2 | 14 ₹50,22,674.58 | 13 ₹46,63,912.11 Lowest | 13.62 ₹48,86,344.84 | 13.48 ₹48,36,118.1 |
| 7.00 | Tack Coat on concrete surfaces
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
RCD SOR -5.02(iii) | 5,868.1 | m2 | 20 ₹1,17,362 | 20 ₹1,17,362 | 20.12 ₹1,18,066.17 | 19.92 ₹1,16,892.55 Lowest |
| 8.00 | Dense graded Bituminous Macadam Grading-II With VG-30 Bulk Bitumen
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 Bulk Bitumen.
RCD-SoR-5.04A B | 9,221.32 | m3 | 10,400 ₹9,59,01,728 | 10,500 ₹9,68,23,860 | 10,295.97 ₹9,49,42,434.08 | 10,193.49 ₹9,39,97,433.21 Lowest |
| 9.00 | Bituminous concrete Grading- II With VG-30 Bulk Bitumen
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects with VG-30 Bulk Bitumen.
RCD-SoR.-5.05A B RCD SOR -5.05A B | 5,684.63 | m3 | 11,500 ₹6,53,73,245 | 11,240 ₹6,38,95,241.2 Lowest | 11,641.81 ₹6,61,79,382.38 | 11,526.29 ₹6,55,22,693.92 |
| 10.00 | Making up loss of Material/irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipments. RCD SOR -10.02 | 1,06,100 | m2 | 45 ₹47,74,500 | 45 ₹47,74,500 | 44.42 ₹47,12,962 | 43.97 ₹46,65,217 Lowest |
Tender Value
₹24.6 Cr
EMD Value
₹24.6 L
Closing Date
8 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
IRQP/Strengthening Work of Raghunathpur to Barmasia Road (Total Length-26.525 Km) under Road Division Dumka for the year 2025-26
2026_CECOM_111529_1
RCD/DUMKA/325
Open Tender
Civil Works
Item Rate
180 days
DUMKA
AS PER SBD
3 documents required · 3 mandatory
₹10,000
₹24.6 L
CE COMM RCD JHARKHAND RANCHI
13 Jul 2026
13 Mar 2026
9 Apr 2026
13 Mar 2026
8 Apr 2026
19 Mar 2026
18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. RCD SOR -2.3(i) A | 9.28 | Hect. | - | - |
| 2 | Granular Sub-Base with Graded Material (Table:- 400-1) Plant Mix Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Rate per cum for grading-V Material
RCD SOR -4.01 B (v) | 1,516.2 | cum | - | - |
| 3 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. RCD SOR -4.14 B | 489 | cum | - | - |
| 4 | Prime Coat over WMM/WBM
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
RCD SOR -5.01 A | 1,956 | M2 | - | - |
| 5 | Tack Coat on Granular surfaces treated with primer
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
RCD SOR -5.02 (ii) | 1,956 | M2 | - | - |
| 6 | Tack Coat on Bituminous surfaces
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
RCD SOR -5.2 (i) | 3,58,762.47 | m2 | - | - |
| 7 | Tack Coat on concrete surfaces
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
RCD SOR -5.02(iii) | 5,868.1 | m2 | - | - |
| 8 | Dense graded Bituminous Macadam Grading-II With VG-30 Bulk Bitumen
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 Bulk Bitumen.
RCD-SoR-5.04A B | 9,221.32 | m3 | - | - |
| 9 | Bituminous concrete Grading- II With VG-30 Bulk Bitumen
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects with VG-30 Bulk Bitumen.
RCD-SoR.-5.05A B RCD SOR -5.05A B | 5,684.63 | m3 | - | - |
| 10 | Making up loss of Material/irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipments. RCD SOR -10.02 | 1,06,100 | m2 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_150584.xls
BOQ • 0.26 MB
SBD.pdf
Tender Documents • 5.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .