Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | PANDIYAN R L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 76 | M3 | 197.5 ₹15,010 Lowest |
| 2.00 | Plain Cement Concrete 1:5:10 mix (One Cement, Five Fine Aggregate and Ten Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 38 | M3 | 5,384.5 ₹2,04,611 Lowest |
| 3.00 | Plain Cement Concrete 1:1.5:3 mix (One Cement, One & half Fine Aggregate and Three Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 38 | M3 | 7,961 ₹3,02,518 Lowest |
| 4.00 | Supplying and Fixing of Bitumen Pad 12mm all other incidental charges etc., complete,. | 8 | M2 | 479 ₹3,832 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,400
Closing Date
21 May 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EO
Townpanchayat Office, Veerapandi
Providing Cement Concrete Road with Culvert at Muthuthevan patti Street 1,2,3 and 4 in Veerapandi Townpanchayat
2026_DTP_676487_1
52-7/2026
Open Tender
Civil Works - Roads
Works
Veerapandi Town Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,400
Yes
22 Aug 2026
11 May 2026
21 May 2026
11 May 2026
21 May 2026
11 May 2026
11 May 2026 - 21 May 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 76 | M3 | 197.84 | ₹15,035.84 |
| 2 | Plain Cement Concrete 1:5:10 mix (One Cement, Five Fine Aggregate and Ten Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 38 | M3 | 5,384.51 | ₹2,04,611.38 |
| 3 | Plain Cement Concrete 1:1.5:3 mix (One Cement, One & half Fine Aggregate and Three Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 38 | M3 | 7,961.17 | ₹3,02,524.46 |
| 4 | Supplying and Fixing of Bitumen Pad 12mm all other incidental charges etc., complete,. | 8 | M2 | 479 | ₹3,832 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Tendernotice_2.pdf
PDF • 0.31 MB
BOQ_812896.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .