| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹54.3 LAdmitted-Finance | +4.90% | ₹54.3 L | L1 | Admitted-Finance |
Tender Value
₹51.8 L
EMD Value
₹1.0 L
Closing Date
25 Jun 2026, 1:00 pmClosed
EXECUTIVE ENGINEER PHED DIVISION BEAWAR
EXECUTIVE ENGINEER PHED DIVISION BEAWAR
WORK OF REPAIR AND MAINTENANCE OF PIPE LINE ALONG WITH ROAD RESTORATION WORK UNDER RnD SUB. DIVISION BEAWAR IN THE JURISDICTION OF DIVISION BEAWAR
2026_PHCJA_564580_1
EE_PHED_BEAWAR_NIT_12/26-27
Open Tender
Miscellaneous Works
Percentage
365 days
AS PER TENDER DOCUMENTS
AS PER TENDER DOCUMENT
6 documents required · 6 mandatory
₹1,000
EXECUTIVE ENGINEER PHED DIVISION BEAWAR
₹1.0 L
Yes
29 Jun 2026
3 Jun 2026
25 Jun 2026
3 Jun 2026
25 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance of pipeline irrespective of size & material which includes repairing of Bursts & Leakage pollution Control survey & removal of choking disconnection of illegal connections collection & recording minimum 10 Nos. residual chlorine samples during daily supply timings interconnections and all works related to pipe line of all sizes by digging oit suitable size of pit in soft and loose soil/hard soil including cutting of black top WBM & CC top of road of any sizr at work site. this will also include cutting of pipe ends fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. for entire job contractor will use their own T&P contractor with his own resources shall arrange dewatering JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing and repair the leakage within stipulated time and complete maintenance of pipe line network of rising and distribution pipe line network within the scope of work for per KM pipe line per month. jointing material shall be provided by the department. | |||||
| 1.01 | 201 km to 300 km - Three Fitter-II & Six Beldar(284*12=3408km) | 3,408 | Per KM Month | 787 | ₹26,82,096 |
| 2 | Restoration of bitumen road by patch work of WBM using crushed/broken aggregateas per the standard specification and consolidation with hand rammer spreading and consolidation of binding material, cleaning of surface WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. | 300 | PER SQM | 681 | ₹2,04,300 |
| 3 | Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning andcompacting cement concrete M-20 minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P complete job | 2,150 | PER SQM | 1,066 | ₹22,91,900 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
merged12.pdf
Tender Documents • 0.67 MB
BOQ_1004825.xls
BOQ • 0.30 MB
12Corri.pdf
PDF • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .