Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.6 L+₹12,878.78 (5.24%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹4,920
Closing Date
29 Aug 2026, 4:00 pmClosed
Xen RnB Div Tangdar
Xen RnB Div Tangdar
Const of RCC culvert near Zayarat at Kallas Mohallah Hajitra
2026_PWDJK_320514_2
ENIT 51 RnB Div Tangadr 2026-27 RDD Teetwal Block
Open Tender
Civil Works
Percentage
tangdar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Convener, purchase committee, Directorate of ISM
₹4,920
Yes
31 Aug 2026
11 Aug 2026
31 Aug 2026
11 Aug 2026
29 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soils. | 7.58 | cum | 479.3 | ₹3,633.09 |
| 2 | P/L of stone soling, hand packed complete inclusive of all leads, lifts, loading, unloading, cost and carriage of materials from approved nearest sources to site of work complete | 2.44 | cum | 950 | ₹2,318 |
| 3 | P/L in position cement concrete of specified grade including Curing but excl. the cost of centering and shuttering. All work upto plinth level in (1:4:8) 40 mm nominal size. | 0.36 | cum | 5,202.9 | ₹1,873.04 |
| 4 | P/L in position cement concrete of specified grade including Curing but excl. the cost of centering and shuttering. All work upto plinth level in (1:3:6) 20 mm nominal size. | 7.61 | cum | 5,733.6 | ₹43,632.7 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of formwork for.Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 10.28 | sqm | 286.35 | ₹2,943.68 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 6.55 | cum | 7,788.4 | ₹51,014.02 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level using Mild steel and medium tensile steel bars | 720.4 | Kg | 115.35 | ₹83,098.14 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms. | 29.51 | sqm | 718.2 | ₹21,194.08 |
| 9 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Railing. | 214.19 | kg | 120.8 | ₹25,874.15 |
| 10 | Carriage of Sand/Bajri from for an average mechanical lead of 10 km and manual lead of 50 m | 19.11 | cum | 479.71 | ₹9,167.26 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_1065713.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .