| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance PLOT 15 15 1ST FLOOR CONTRACTOR BUILDING VAJU KOTAK MARG OFF SHAHID BHAGATSINGH ROAD BALLARD ESTATE MUMBAI MAHARASHTRA 400038 | 400038 | -25.57% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹17.4 L (15.6%)Admitted-Finance AA CLASS NEAR DUDI PETROL PUMP GAJNER ROAD BIKANER RAJASTHAN | BIKANER | BIKANER | RAJASTHAN | -13.98% | ₹1.3 Cr+₹17.4 L (15.6%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹37.6 L (33.7%)Admitted-Finance VILLAGE JANEVA TEHSIL JAYAL DISTT NAGAUR RAJ 341001 | JAYAL | NAGAUR | RAJASTHAN | 341001 | -0.51% | ₹1.5 Cr+₹37.6 L (33.7%) | L3 | Admitted-Finance |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
3 Jun 2026, 6:00 pmClosed
SE PWD CIRCLE NAGAUR
SE PWD CIRCLE NAGAUR
Construction Work Atal Path From NH-62 via Maharshi Bhavan to Shri Balaji Bus Stand to Chhila Road (Village Shri Balaji)
2026_CEPWD_560788_1
NIT-NO-01/2026-27 SE PWD CIRCLE NAGAUR
Open Tender
Civil Works
Percentage
120 days
NAGAUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
EGRASS CHALLAN OFFICE ID 2855
₹3.5 L
Yes
23 Jun 2026
20 May 2026
4 Jun 2026
20 May 2026
3 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202.
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 600 | Cum | 515 | ₹3,09,000 |
| 2 | Excavation in Soil with Dozer with lead upto 100 m
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 4,900 | Cum | 20 | ₹98,000 |
| 3 | Granular Sub-base with Well Graded Material (Table 400-1)
By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,
complete as per MoRTH Specification Clause 401.
For All Rajasthan except Bikaner, Churu, Hanumangarh and Sri
Ganganagar
For Grading III Material | 1,948 | Cum | 407 | ₹7,92,836 |
| 4 | Dry Lean Cement Concrete
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a fully automatic computerised batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
For All Rajasthan except Bikaner | 1,328 | Cum | 2,418 | ₹32,11,104 |
| 5 | Cement Concrete Pavement
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 150 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all
required equipments (Dowel Bars will be paid seprately) | 1,992 | Cum | 4,811 | ₹95,83,512 |
| 6 | Supplying, fitting, and placing HYSD bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications
Clauses 1009,1600 and 2302 | 0.04 | Tonne | 80,077 | ₹3,203.08 |
| 7 | Excavation in Cutting in Soil by manual means with lead upto 50 m
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per MoRTH Specification Clause 301.3 | 112 | Cum | 57 | ₹6,384 |
| 8 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10
For All Rajasthan except Bikaner, Hanumangarh and Sri
Ganganagar
Nominal mix 1:3:6 | 24 | Cum | 2,584 | ₹62,016 |
| 9 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. | - | - | - | - |
| - | 600 mm dia | 15 | Rmt | 1,727 | ₹25,905 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.44 MB
Tendernotice_2.pdf
PDF • 0.39 MB
Tendernotice_3.pdf
PDF • 0.53 MB
Tendernotice_4.pdf
PDF • 0.16 MB
Tendernotice_5.pdf
PDF • 0.58 MB
Tendernotice_6.pdf
PDF • 7.39 MB
Tendernotice_7.pdf
PDF • 0.13 MB
BOQ_998147.xls
BOQ • 0.35 MB
01.pdf
Tender Documents • 0.30 MB
01COMPONENT.pdf
PDF • 0.01 MB
01RATE.rar
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .