| Sl No | Description | Qty | Unit | KULANDAIVELU L1 |
|---|---|---|---|---|
| 1.00Dismantling of Existing Structures like culverts, bridges and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | ||||
| 2.00Removal Of Existing Slab Culvert | ||||
| 3.00 | For RCC | 20.48 | Cum | 4,610 ₹94,412.8 Lowest |
| 4.00 | For PCC | 41.6 | Cum | 520 ₹21,632 Lowest |
| 5.00 | Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Dressing the Bed upto Sill Level. | 125.04 | Cum | 131 ₹16,380.24 Lowest |
| 6.00 | Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for Foundation (Open Foundation, Raft Foundation, Cutoff Wall, Rigid & Flexible Apron) Under Abutments, Returns & Piers Below Sill Level. | 223.52 | Cum | 490 ₹1,09,524.8 Lowest |
| 7.00 | Blasting and Removing the Hard Rock measured in solid in the foundation and removing the blasted stones and stacking the same for pre-measurement at site including the all other labour and incidental charges including the cost of the blasting materials and all other tools and plants employed etc., complete as per standard specifications for (Open Foundation, Cutoff Wall) Under Abutments, Returns & Piers Below Sill Level. | 167.63 | Cum | 2,092 ₹3,50,681.96 Lowest |
| 8.00 | Providing and Fixing Dowel Bars with 32mm Steel Rods of 1.5m length Embedded into the Rock to a Depth of 0.9m by providing required depth of holes by drilling the rock in 50mm dia wherever necessary including fixing in position by grouting the embedded portion with CM 1:2 after placing the bars for Sub-Structure of Abutment / Pier / Wing and Top Footing of Open Foundation / Raft Foundation. | 152 | Nos | 906 ₹1,37,712 Lowest |
| 9.00 | Vibrated Cement Concrete of Grade M15 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Foundation Concrete (Levelling course Below Footing, Below Raft Foundation, Below Retaining Wall). | 18.62 | Cum | 4,979 ₹92,708.98 Lowest |
| 10.00 | Vibrated Plain Cement Concrete of Grade M 20 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footing Under Abutments, Returns & Piers. | 293.57 | Cum | 6,041 ₹17,73,456.37 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
3 Mar 2026, 3:00 pmClosed
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Virudhunagar
Construction of Bridge across the Surplus course of Ayankollakondan Periyakulam Tank along Burial Ground Road in Ayankollankondan Panchayat of Rajapalayam Block in Virudhunagar District under Savings Fund of State Special Assistance (2025-26)
2026_RDTN_666006_1
C6/5230/2026 dated 24.02.2026
Open Tender
Civil Works - Bridges
Item Rate
365 days
Rajapalayam Block
Refer tender document
5 documents required · 5 mandatory
₹0
₹2.1 L
14 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
3 Mar 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Existing Structures like culverts, bridges and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | - | - | - | - |
| - | Removal Of Existing Slab Culvert | - | - | - | - |
| - | For RCC | - | Cum | - | - |
| - | For PCC | - | Cum | - | - |
| - | Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Dressing the Bed upto Sill Level. | - | Cum | - | - |
| - | Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for Foundation (Open Foundation, Raft Foundation, Cutoff Wall, Rigid & Flexible Apron) Under Abutments, Returns & Piers Below Sill Level. | - | Cum | - | - |
| - | Blasting and Removing the Hard Rock measured in solid in the foundation and removing the blasted stones and stacking the same for pre-measurement at site including the all other labour and incidental charges including the cost of the blasting materials and all other tools and plants employed etc., complete as per standard specifications for (Open Foundation, Cutoff Wall) Under Abutments, Returns & Piers Below Sill Level. | 1 | Cum | - | - |
| - | Providing and Fixing Dowel Bars with 32mm Steel Rods of 1.5m length Embedded into the Rock to a Depth of 0.9m by providing required depth of holes by drilling the rock in 50mm dia wherever necessary including fixing in position by grouting the embedded portion with CM 1:2 after placing the bars for Sub-Structure of Abutment / Pier / Wing and Top Footing of Open Foundation / Raft Foundation. | - | Nos | - | - |
| - | Vibrated Cement Concrete of Grade M15 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Foundation Concrete (Levelling course Below Footing, Below Raft Foundation, Below Retaining Wall). | - | Cum | - | - |
| - | Vibrated Plain Cement Concrete of Grade M 20 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footing Under Abutments, Returns & Piers. | 1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
1_Bid_Doc_RJPM.pdf
Tender Documents • 0.46 MB
BOQ_799963.xls
BOQ • 0.33 MB
Bridge_1.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .