Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-AOC | ₹29.0 L | L1 | Accepted-AOC Vendor selected as L1 |
| 2 | L2₹32.3 L+₹3.3 L (11.2%)Rejected-Finance | ₹32.3 L+₹3.3 L (11.2%) | L2 | Rejected-Finance The vendors quoted amount above allotted amount and also L2 bidder. |
| 3 | L3₹33.0 L+₹4.0 L (13.7%)Rejected-Finance | ₹33.0 L+₹4.0 L (13.7%) | L3 | Rejected-Finance The vendors quoted amount above allotted amount and also L3 bidder. |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
Closing Date
27 Jan 2021, 10:30 amClosed
Comdt, 5 Armd Regt
5 Armd Regt c/o 56 APO
INSTALATION OF AIR DUCT COOLING SYSTEM
2021_ARMY_411522_1
46406/QD/A/2020-21
Open Tender
Miscellaneous Works
Works
45 days
BATHINDA MIL STN
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
Unit Location
18 Mar 2021
12 Jan 2021
27 Jan 2021
12 Jan 2021
27 Jan 2021
12 Jan 2021
12 Jan 2021 - 26 Jan 2021
22 Jan 2021
Amount
JOB : procurement and installation of new air duct cooling system in 27 x OR lines to include following
COOLER
Body. Galvanized Iron body 42” x 42” x 60” or large
Cooling Pads. Honey comb pads 6” or larger
Cooling fan. 24” diameter of fan
Fan motor 1/1.5 or larger Horse Power
Pump. Submersible water Pump 200 watts or larger
Cooler Stand. (i) material : painted wrought iron (ii) Cooler stand to be grouted using adequate number of bolts to with stand wind speed of 7.5 miles/hour. (iii) Cooler to be welded on cooler stand (iv) Separate switch for fan & water pump so that it can be operated form OR line Cooler Stand Size. (i) dimensions as per befitting cooler
Duct Dimensions To be of dimensions equal to or more than vent size (mentioned below) to facilitate unhindered air flow Vent dimensions 26’ x 10’ (To be ascertained during survey) Material. Galvanized Iron sheets. Ducting. As per requirement from roof top till OR line (to be ascertained during survey). 1300 running ft in buildings (480 sqft per barrack/OR line). Gauge. 22/24 Gauge GI Ducting sheet. Components. Duct Stack Head 900 stack elbow Universal Clamping bolt and other items for installation of duct system Grill. Aluminium powder coated air supply grills Galvanized Iron stands and canvas connectors Air Proof insulation. Rubber 9 mm (Nitro Rubber)
Electric & Maintenance works Circuit breaker box for each cooling unit. Electric connection meeting requirements of the cooler to include electric sockets (32 Ampere) male/female. Wire. 2.5 sq mm copper wire to be used for electrification with fire proof insulation (ISI mark). Switch. On/off switch of Crompton/anchor or other equivalent with ISI mark
Plumbing work Pipe. GI pipe 1/2 Inch diameter or larger Connectors. From existing water tank on roof till coolers. (to be ascertained during survey) Stopper. To stop flow of water
M/s Bhullar Constructions
M/S SODHI ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .