Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39,194.92Qualified PLOT NO 1 3 5 6 REVENUE SURVEY NO 36 TO 38 43 TO 47 P1 SILVER CONSUMER ELECTRICALS LIMITED VILLAGE HARIPAR RAJKOT GUJARAT 360035 | RAJKOT | GUJARAT | 360035 | L1 | Qualified | |
| 2 | L2₹40,148.31+₹953.39 (2.43%)Qualified GROUND FLOOR PLOT NO 75 BAWANA DSIDC NORTH DELHI PKT J SECTOR 2 BAWANA NORTH WEST DELHI DELHI 110039 | NORTH DELHI | DELHI | 110039 | L2 | Qualified MSE, Category: General | |
| 3 | L3₹47,076.27+₹7,881.35 (20.1%)Qualified MR 92 MARUTI RESIDENCY RAGHUNATHPUR BHUBANESWAR KHURDA KHORDHA ODISHA 751024 | KHORDHA | ODISHA | 751024 | L3 | Qualified | |
| 4 | L4₹48,150+₹8,955.08 (22.8%)Qualified 20 KISAN BAZAR COMPOUND JHANSI JHANSI JHANSI UTTAR PRADESH 284001 | JHANSI | UTTAR PRADESH | 284001 | L4 | Qualified | |
| 5 | L5₹49,194.92+₹10,000 (25.5%)Qualified A 3 ANKUR TOWER BATRA CINEMA COMM COMPLEX DR MUKHERJEE NAGAR DELHI DELHI 110007 | NORTH DELHI | DELHI | 110007 | L5 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
13 Aug 2025, 5:00 pmClosed
Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6484359 Dated : 23-07-2025 Bid Document 1/9
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8125043
GEM/2025/B/6484359
Two Packet Bid
Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria
45 days
BANGALORE CITY
Total value wise evaluation
PRODUCT
6 documents required · 6 mandatory
Exempted
23 Jul 2025
23 Jul 2025
13 Aug 2025
Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6484359 Dated : 23-07-2025 Bid Document 1/9
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8125043.pdf
GEM_BID
om_2025-02-18-12-28-51_6717d8b2741d2c3b7521b1f92217c6a6.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .