| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC 34A 11 A 4 SHASTRI NAGAR SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹5.7 L Quoted ₹4.8 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | KISHORE ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00 | Charges for cutting and removing the eroded portions of supporting Structures in the screen plate areas, fabrication & erection of new supporting structures, strengthening of the damaged portion in the ESP inlet side by welding and other related works in both ‘AB’ and ‘CD’ pass. | 2 | No. | 27,500 ₹55,000 |
| 2.00 | Labour charges for welding eroded initial welding joints in the flue gas duct above 2 metre. | 400 | mtr. | 165 ₹66,000 |
| 3.00 | Charges for transporting of 6mm M.S./ Checkered plates from Central Stores/MTPS to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 meter level and welding the same. | 50 | m2 | 2,100 ₹1.1 L |
| 4.00 | Charges for cutting and removal of heavily eroded flue gas duct deflector plates, transporting & devoluting scraps to Central Stores/M.T.P.S.-I. | 40 | m2 | 1,000 ₹40,000 |
| 5.00 | Charges for drawal of 6mm M.S plate from central stores transporting the materials to outside workshop cutting to required size, bending to the required size and profile, transporting back to MTPS-I boiler area. | 2 | Ton | 20,000 ₹40,000 |
| 6.00 | Charges for leading the new deflector to Boiler area, leading, lifting to Boiler Flue gas ducts. Fixing and welding guide angle in the duct and to the correct contour. Placing the deflector plate in the guide angle and welding the same. | 40 | m2 | 1,900 ₹76,000 |
| 7.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. | 2 | Time | 13,100 ₹26,200 |
| 8.00 | Providing sampling points / temperature measuring points at various location of flue gas ducts | 2 | No. | 5,100 ₹10,200 |
| 9.00 | Arresting of FG duct above ID fan outlet side deflector plate by cutting and opening the plates fixing the 3mm sheet and removing after the work. (Arresting the air syphon effect from chimney) | 2 | No. | 16,000 ₹32,000 |
| 10.00 | Cutting gas | 3.65 | set | 3,650 ₹13,322.50 |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
23 Oct 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit II COH 2024 25 Strengthening of the eroded portions of ESP hopper ID fan casing FG duct from ESP inlet to chimney and Renewal of Deflector plate in the ID fan outlet side FG duct and other related works in both A and B sides
2024_EB_492344_1
CE / MTPS-I / SE / M-I / BM /OT. 229 / 2024-25
Open Tender
Power/Energy Projects/Products
50 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,700
Yes
20 May 2026
9 Oct 2024
24 Oct 2024
9 Oct 2024
23 Oct 2024
9 Oct 2024
Amount
Charges for cutting and removing the eroded portions of supporting Structures in the screen plate areas, fabrication & erection of new supporting structures, strengthening of the damaged portion in the ESP inlet side by welding and other related works in both ‘AB’ and ‘CD’ pass.
Labour charges for welding eroded initial welding joints in the flue gas duct above 2 metre.
Charges for transporting of 6mm M.S./ Checkered plates from Central Stores/MTPS to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 meter level and welding the same.
Charges for cutting and removal of heavily eroded flue gas duct deflector plates, transporting & devoluting scraps to Central Stores/M.T.P.S.-I.
Charges for drawal of 6mm M.S plate from central stores transporting the materials to outside workshop cutting to required size, bending to the required size and profile, transporting back to MTPS-I boiler area.
Charges for leading the new deflector to Boiler area, leading, lifting to Boiler Flue gas ducts. Fixing and welding guide angle in the duct and to the correct contour. Placing the deflector plate in the guide angle and welding the same.
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.
Providing sampling points / temperature measuring points at various location of flue gas ducts
Arresting of FG duct above ID fan outlet side deflector plate by cutting and opening the plates fixing the 3mm sheet and removing after the work. (Arresting the air syphon effect from chimney)
Cutting gas
Welding Rod
Consumable Charges for S.No.1 to 9
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_584970.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid