| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.8 L+₹5,076.65 (2.84%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.9 L+₹9,000.13 (5.03%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.9 L+₹11,827.64 (6.61%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹2.0 L+₹22,603.20 (12.6%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SOMASUNDARAM.V L3 | GSS CONSTRUCTION L1 | R.Jeevanandam L4 | R.VENKADAPATHY L5 | SARATHA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Motar Room Near Mariyamman Kovil at Vilunthamavadi Panchayat | ||||||||
| 2.00 | Earthwork excavation in all soils as per SS20B and depositing on banks with initial lead and lift and including all labour charges etc., complete | 1 | M2 | 233.7 ₹233.7 | 250 ₹250 | 231.24 ₹231.24 | 300 ₹300 | 228.78 ₹228.78 Lowest |
| 3.00 | Drilling the pile in hard stiff clay soil including all labour cherges etc | 9.6 | M2 | 3,380.1 ₹32,448.96 | 580 ₹5,568 Lowest | 3,344.52 ₹32,107.39 | 600 ₹5,760 | 3,308.94 ₹31,765.82 |
| 4.00 | Sand filling in foundation/basement using good river sand including cost and conveyance of all materials to work site and all labour charges including other incidental charges etc., complete. | 0.6 | M3 | 2,144.15 ₹1,286.49 | 2,850 ₹1,710 | 2,121.58 ₹1,272.95 | 3,000 ₹1,800 | 2,099.01 ₹1,259.41 Lowest |
| 5.00 | CC 1:4:8 using ISSHBG Metal of 40mm size including cost and conveyance of all materials to work site and all labour charges including all other incidental charges etc., complete. | 0.9 | M3 | 6,524.6 ₹5,872.14 | 6,600 ₹5,940 | 6,455.92 ₹5,810.33 | 6,800 ₹6,120 | 6,387.24 ₹5,748.52 Lowest |
| 6.00 | Brickwork in CM 1:5 mix using Country bricks of standard size including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete. | 4 | M2 | 5,962.2 ₹23,848.8 | 6,950 ₹27,800 | 5,899.44 ₹23,597.76 | 7,000 ₹28,000 | 5,836.68 ₹23,346.72 Lowest |
| 7.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges including all other incidental charges etc., complete for Plinth | 1.8 | M3 | 7,163 ₹12,893.4 | 12,060 ₹21,708 | 7,087.6 ₹12,757.68 | 12,600 ₹22,680 | 7,012.2 ₹12,621.96 Lowest |
| 8.00 | Supply and fabrication of MS/RTS for all RCC items including cost and conveyance of all materials to work site including all labour charges and other incidental charges etc., complete | 0.3 | MT | 75,810 ₹22,743 | 10,500 ₹3,150 Lowest | 75,012 ₹22,503.6 | 11,000 ₹3,300 | 74,214 ₹22,264.2 |
| 9.00 | Supply and erecting of steel centering and shuttering including all material and all labour Charges etc. | 8.7 | M3 | 761.9 ₹6,628.53 | 582 ₹5,063.4 Lowest | 753.88 ₹6,558.76 | 600 ₹5,220 | 745.86 ₹6,488.98 |
| 10.00 | Special ceiling plastering in CM 1:3 to 10mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete. | 4.4 | M2 | 437 ₹1,922.8 | 420 ₹1,848 Lowest | 432.4 ₹1,902.56 | 450 ₹1,980 | 427.8 ₹1,882.32 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
20 Jul 2026, 4:00 pmClosed
The Block Development Officer, Keelaiyur
The Block Development Office, Keelaiyur
Construction of Motar Room Near Mariyamman Kovil at Vilunthamavadi Panchayat
2026_RDTN_682742_8
310/2026/B2/Dt.23.06.2026
Open Tender
Civil Works
Item Rate
Keelaiyur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,000
14 Aug 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Motar Room Near Mariyamman Kovil at Vilunthamavadi Panchayat | - | - | - | - |
| 2 | Earthwork excavation in all soils as per SS20B and depositing on banks with initial lead and lift and including all labour charges etc., complete | 1 | M2 | - | - |
| 3 | Drilling the pile in hard stiff clay soil including all labour cherges etc | 9.6 | M2 | - | - |
| 4 | Sand filling in foundation/basement using good river sand including cost and conveyance of all materials to work site and all labour charges including other incidental charges etc., complete. | 0.6 | M3 | - | - |
| 5 | CC 1:4:8 using ISSHBG Metal of 40mm size including cost and conveyance of all materials to work site and all labour charges including all other incidental charges etc., complete. | 0.9 | M3 | - | - |
| 6 | Brickwork in CM 1:5 mix using Country bricks of standard size including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete. | 4 | M2 | - | - |
| 7 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges including all other incidental charges etc., complete for Plinth | 1.8 | M3 | - | - |
| 8 | Supply and fabrication of MS/RTS for all RCC items including cost and conveyance of all materials to work site including all labour charges and other incidental charges etc., complete | 0.3 | MT | - | - |
| 9 | Supply and erecting of steel centering and shuttering including all material and all labour Charges etc. | 8.7 | M3 | - | - |
| 10 | Special ceiling plastering in CM 1:3 to 10mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete. | 4.4 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
BOQ_820729.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .