Loading
Loading…
Loading…
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
20 Jul 2026, 4:00 pm
The Block Development Officer, Keelaiyur
The Block Development Office, Keelaiyur
Construction of Motar Room Near Mariyamman Kovil at Vilunthamavadi Panchayat
2026_RDTN_682742_8
310/2026/B2/Dt.23.06.2026
Open Tender
Civil Works
Keelaiyur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,000
25 Jun 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Motar Room Near Mariyamman Kovil at Vilunthamavadi Panchayat | - | - | - | - |
| 2 | Earthwork excavation in all soils as per SS20B and depositing on banks with initial lead and lift and including all labour charges etc., complete | 1 | M2 | - | - |
| 3 | Drilling the pile in hard stiff clay soil including all labour cherges etc | 9.6 | M2 | - | - |
| 4 | Sand filling in foundation/basement using good river sand including cost and conveyance of all materials to work site and all labour charges including other incidental charges etc., complete. | 0.6 | M3 | - | - |
| 5 | CC 1:4:8 using ISSHBG Metal of 40mm size including cost and conveyance of all materials to work site and all labour charges including all other incidental charges etc., complete. | 0.9 | M3 | - | - |
| 6 | Brickwork in CM 1:5 mix using Country bricks of standard size including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete. | 4 | M2 | - | - |
| 7 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges including all other incidental charges etc., complete for Plinth | 1.8 | M3 | - | - |
| 8 | Supply and fabrication of MS/RTS for all RCC items including cost and conveyance of all materials to work site including all labour charges and other incidental charges etc., complete | 0.3 | MT | - | - |
| 9 | Supply and erecting of steel centering and shuttering including all material and all labour Charges etc. | 8.7 | M3 | - | - |
| 10 | Special ceiling plastering in CM 1:3 to 10mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete. | 4.4 | M2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
BOQ_820729.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid